HL incident on 2020-08-04 — TX

Operator
Sunoco Pipeline L.p.
Cause
Natural Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2020-08-04 12:30
Report number
Location
TX
Narrative
On 8/4/2020 at approximately 12:30 am a company tank farm operator discovered a sheen outside the pump house. Immediate notification was made to management and the affected equipment was isolated. Tropical storm isaias impacts caused flood water to overfill the # 4 separator which caused a crude oil sheen to surface on the water in the area. Boom was placed to contain and absorb the oily sheen. The sheen was fully contained on the facility property and osro's were dispatched to assist with recovery. The facility was already shut down as part of the storm preparation and the facility was not delivering to any pipeline.
Detailed record list
Report Received Date
2020-09-02 00:00:00
Iyear
2020
Report Number
20200239
Supplemental Number
34217
Report Type
Original Final
Operator Id
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2020-08-04 12:30:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.9
Recovered Bbls
0.9
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2020-08-04 12:30:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Facility Was Not Operating Due To Tropical Storm Isaias Widespread Flooding.
On Site Datetime
2020-08-04 12:30:00
Nrc Rpt Datetime
2020-08-04 15:09:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Darby Creek Tank Farm
Segment Name
#4 Oil Water Separator Appurtenance
Onshore State Abbreviation
Pa
Onshore Postal Code
19079
Onshore City Name
Sharon Hill
Onshore County Name
Delaware
Designated Location
Milepost/valve Station
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Other
Incident Area Details
Manhole And Oil Water Separator
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Sump
Installation Year
2003
Material Involved
Material Other Than Carbon Steel
Material Details
Lined Concrete Separator
Release Type
Overfill Or Overflow
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
125000
Est Cost Environmental
0
Est Cost Other
0
Prpty
125000
Accident Psig
0
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Facility was already shutdown due to storm and overfill occurred because of local flooding.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Heavy Rains/floods
Natural Force Type
Heavy Rains/floods
Heavy Rains Subtype
Other
Nf Other Details
Separator Overflow Due To Local Flooding From Storm
Nf Extreme Weather Ind
Yes
Nf Tropical Storm Ind
Yes
Preparer Name
T*** N*******
Preparer Title
Director - Regulatory Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Preparer Fax
877-917-0448
Prepared Date
2020-09-02 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7077
Authorizer Title
Director - Regulatory Compliance
Authorizer Email
T************@e*************.com
Narrative
On 8/4/2020 at approximately 12:30 am a company tank farm operator discovered a sheen outside the pump house. Immediate notification was made to management and the affected equipment was isolated. Tropical storm isaias impacts caused flood water to overfill the # 4 separator which caused a crude oil sheen to surface on the water in the area. Boom was placed to contain and absorb the oily sheen. The sheen was fully contained on the facility property and osro's were dispatched to assist with recovery. The facility was already shut down as part of the storm preparation and the facility was not delivering to any pipeline.
Report Received Date 2020-09-02 00:00:00
Iyear 2020
Report Number 20200239
Supplemental Number 34217
Report Type Original Final
Operator Id 18718 PHMSA Enforcement
Name Sunoco Pipeline L.p.
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2020-08-04 12:30:00
Location Latitude 39.89503 Google Maps OpenStreetMap
Location Longitude -75.26103 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.9
Recovered Bbls 0.9
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2020-08-04 12:30:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Facility Was Not Operating Due To Tropical Storm Isaias Widespread Flooding.
On Site Datetime 2020-08-04 12:30:00
Nrc Rpt Datetime 2020-08-04 15:09:00
Nrc Rpt Num 1283671 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Darby Creek Tank Farm
Segment Name #4 Oil Water Separator Appurtenance
Onshore State Abbreviation Pa
Onshore Postal Code 19079
Onshore City Name Sharon Hill
Onshore County Name Delaware
Designated Location Milepost/valve Station
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Other
Incident Area Details Manhole And Oil Water Separator
Crossing No
Pipe Facility Type Interstate
Item Involved Sump
Installation Year 2003
Material Involved Material Other Than Carbon Steel
Material Details Lined Concrete Separator
Release Type Overfill Or Overflow
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 0
Est Cost Emergency 125000
Est Cost Environmental 0
Est Cost Other 0
Prpty 125000
Accident Psig 0
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Facility was already shutdown due to storm and overfill occurred because of local flooding.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Natural Force Damage
Cause Details Heavy Rains/floods
Natural Force Type Heavy Rains/floods
Heavy Rains Subtype Other
Nf Other Details Separator Overflow Due To Local Flooding From Storm
Nf Extreme Weather Ind Yes
Nf Tropical Storm Ind Yes
Preparer Name T*** N*******
Preparer Title Director - Regulatory Compliance
Preparer Email T************@e*************.com
Preparer Telephone 713-989-7126
Preparer Fax 877-917-0448
Prepared Date 2020-09-02 00:00:00
Authorizer Name T*** N*******
Authorizer Telephone 713-989-7077
Authorizer Title Director - Regulatory Compliance
Authorizer Email T************@e*************.com
Narrative On 8/4/2020 at approximately 12:30 am a company tank farm operator discovered a sheen outside the pump house. Immediate notification was made to management and the affected equipment was isolated. Tropical storm isaias impacts caused flood water to overfill the # 4 separator which caused a crude oil sheen to surface on the water in the area. Boom was placed to contain and absorb the oily sheen. The sheen was fully contained on the facility property and osro's were dispatched to assist with recovery. The facility was already shut down as part of the storm preparation and the facility was not delivering to any pipeline.

All rights reserved. Copyright © by ClearPHMSA