HL incident on 2020-06-30 — TX

Operator
Plains Marketing, L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$12,000
Incident datetime
2020-06-30 16:00
Report number
Location
TX
Narrative
Approximately seven barrels of crude oil were released within facility boundaries from the 12 inch suction line of pump 5 at dominguez hills station. The date and time of the release (06/30/2020 at 14:55) is indicative of the earliest possible time the release could have started, as it was the last time the station had been inspected and confirmed no oil was being released. A supplemental report will be submitted pending further investigation into the cause of the incident. Supplemental narrative: after the third party failure analysis was completed, it was determined that microbiologically-influenced corrosion (mic) is suspected of initiating or assisting the pitting attack based on the morphology of the pitting and the presence of acid-producing bacteria (apb), iron-oxidizing bacteria (iob), and denitrifying bacteria (dnb) found in the corrosion products. The confinement of the pitting between the 11:00 and 1:00 position is likely due to the lower flow velocity at this position compared to other clock positions in the elbow. A section of the vertical pipe upstream, the elbow, and the horizontal section of the pipe downstream were replaced to prevent re-occurrence. Supplemental narrative (2): wall thickness was updated (part c, q3.B) according to the range (.380 - .405 inches) provided by the third party analysis.
Detailed record list
Report Received Date
2020-07-30 00:00:00
Iyear
2020
Report Number
20200218
Supplemental Number
34537
Report Type
Supplemental Final
Operator Id
Name
Plains Marketing, L.p.
Operator Street Address
333 Clay Street, Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2020-06-30 14:55:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
7
Recovered Bbls
6.7
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2020-06-30 16:00:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Incident Location Was Isolated Without Interruption To Normal Operations.
On Site Datetime
2020-06-30 16:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Dominguez Hills
Segment Name
Pump 5 Suction Line
Onshore State Abbreviation
Ca
Onshore Postal Code
90220
Onshore City Name
Compton
Onshore County Name
Los Angeles
Designated Location
Milepost/valve Station
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12
Pipe Wall Thickness
0.38
Pipe Smys
Unknown
Pipe Specification
Unknown
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
Unknown
Pipe Coating Type
Paint
Installation Year
1973
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
40
Est Cost Prop Damage
12000
Est Cost Emergency
10000
Est Cost Environmental
0
Est Cost Other
0
Prpty
22040
Accident Psig
175
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Elbow Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
Yes, But The Point Of The Accident Was Not Identified As A Dig Site
Direct Asmnt Pnt Not Idntf Yr
2018
Non Destructive Exam Ind
No
Preparer Name
N****** G*******
Preparer Title
Hse Compliance Specialist
Preparer Email
N*********@p****.com
Preparer Telephone
7136464376
Prepared Date
2020-11-16 00:00:00
Authorizer Name
N***** G*****
Authorizer Telephone
7136464336
Authorizer Title
Hse Compliance Director
Authorizer Email
N******@p****.com
Narrative
Approximately seven barrels of crude oil were released within facility boundaries from the 12 inch suction line of pump 5 at dominguez hills station. The date and time of the release (06/30/2020 at 14:55) is indicative of the earliest possible time the release could have started, as it was the last time the station had been inspected and confirmed no oil was being released. A supplemental report will be submitted pending further investigation into the cause of the incident. Supplemental narrative: after the third party failure analysis was completed, it was determined that microbiologically-influenced corrosion (mic) is suspected of initiating or assisting the pitting attack based on the morphology of the pitting and the presence of acid-producing bacteria (apb), iron-oxidizing bacteria (iob), and denitrifying bacteria (dnb) found in the corrosion products. The confinement of the pitting between the 11:00 and 1:00 position is likely due to the lower flow velocity at this position compared to other clock positions in the elbow. A section of the vertical pipe upstream, the elbow, and the horizontal section of the pipe downstream were replaced to prevent re-occurrence. Supplemental narrative (2): wall thickness was updated (part c, q3.B) according to the range (.380 - .405 inches) provided by the third party analysis.
Report Received Date 2020-07-30 00:00:00
Iyear 2020
Report Number 20200218
Supplemental Number 34537
Report Type Supplemental Final
Operator Id 26085 PHMSA Enforcement
Name Plains Marketing, L.p.
Operator Street Address 333 Clay Street, Suite 1900
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2020-06-30 14:55:00
Location Latitude 33.86127 Google Maps OpenStreetMap
Location Longitude -118.22533 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 7
Recovered Bbls 6.7
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2020-06-30 16:00:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The Incident Location Was Isolated Without Interruption To Normal Operations.
On Site Datetime 2020-06-30 16:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Dominguez Hills
Segment Name Pump 5 Suction Line
Onshore State Abbreviation Ca
Onshore Postal Code 90220
Onshore City Name Compton
Onshore County Name Los Angeles
Designated Location Milepost/valve Station
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 12
Pipe Wall Thickness 0.38
Pipe Smys Unknown
Pipe Specification Unknown
Pipe Seam Type Other
Pipe Seam Details Unknown
Pipe Manufacturer Unknown
Pipe Coating Type Paint
Installation Year 1973
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 40
Est Cost Prop Damage 12000
Est Cost Emergency 10000
Est Cost Environmental 0
Est Cost Other 0
Prpty 22040
Accident Psig 175
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Microbiological Ind Yes
Int Metallurgical Basis Ind Yes
Int Elbow Loc Ind Yes
Corrosion Inhibitors No
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted Yes, But The Point Of The Accident Was Not Identified As A Dig Site
Direct Asmnt Pnt Not Idntf Yr 2018
Non Destructive Exam Ind No
Preparer Name N****** G*******
Preparer Title Hse Compliance Specialist
Preparer Email N*********@p****.com
Preparer Telephone 7136464376
Prepared Date 2020-11-16 00:00:00
Authorizer Name N***** G*****
Authorizer Telephone 7136464336
Authorizer Title Hse Compliance Director
Authorizer Email N******@p****.com
Narrative Approximately seven barrels of crude oil were released within facility boundaries from the 12 inch suction line of pump 5 at dominguez hills station. The date and time of the release (06/30/2020 at 14:55) is indicative of the earliest possible time the release could have started, as it was the last time the station had been inspected and confirmed no oil was being released. A supplemental report will be submitted pending further investigation into the cause of the incident. Supplemental narrative: after the third party failure analysis was completed, it was determined that microbiologically-influenced corrosion (mic) is suspected of initiating or assisting the pitting attack based on the morphology of the pitting and the presence of acid-producing bacteria (apb), iron-oxidizing bacteria (iob), and denitrifying bacteria (dnb) found in the corrosion products. The confinement of the pitting between the 11:00 and 1:00 position is likely due to the lower flow velocity at this position compared to other clock positions in the elbow. A section of the vertical pipe upstream, the elbow, and the horizontal section of the pipe downstream were replaced to prevent re-occurrence. Supplemental narrative (2): wall thickness was updated (part c, q3.B) according to the range (.380 - .405 inches) provided by the third party analysis.

All rights reserved. Copyright © by ClearPHMSA