HL incident on 2020-05-14 — OK

Operator
Williams Field Services
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$750
Incident datetime
2020-05-14 07:00
Report number
Location
OK
Narrative
On may 14th 2020 at 6:50am mst operation personnel completing preventive maintenance task drove up to the site gate at pgx tankage and noticed a vapor cloud of ngl and esd station. It was determined a leak occurred on p-4267. The leak location was within the secondary containment for the ngl storage tanks and 69 out of 70 gallons that was released on the ground were recovered from a vac truck. The valve cover gasket was replaced same day and with no leaks detected at that point in time. Secondary contributing factor to leak was pump seal is attached to a drain line that is connected to a drain tank and during the pump seal leak the drain line was working properly and continued to fill tk-4813 until static head was great enough to caused the direction of flow from the tk-4813 back to the leak point on p-4627 in which the ngl discharged onto the ground. Tk-4813 currently only has a local level gauge with no transmitting capacity to scada. On may 18th pump was idle and determined leak was still presence from another personnel performing pm task, pump was re-isolated and put out of service as a part of maintenance activity to replace a pump seal packing. Issued was resolved and put back into service without any additional issues. Actions taken to reduce likelihood of future release. 1) drain line has a pressure switch high high (pshh4627) that was set at 30 psi and has been decreased to 10 psi to be able to detect future back flow condition.
Detailed record list
Report Received Date
2020-06-08 00:00:00
Iyear
2020
Report Number
20200169
Supplemental Number
33901
Report Type
Supplemental Final
Operator Id
Name
Williams Field Services
Operator Street Address
One Williams Center Wrc-3
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74172
Local Datetime
2020-05-14 06:50:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
3.6
Intentional Release Bbls
0
Recovered Bbls
1.6
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2020-05-14 07:00:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2020-05-14 07:00:00
Restart Datetime
2020-05-14 12:00:00
On Site Datetime
2020-05-14 07:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Pgx Ngl Storage Facility
Segment Name
20004-T-T-T
Onshore State Abbreviation
Co
Onshore Postal Code
81635-9715
Onshore City Name
Not Within A Municipality
Onshore County Name
Garfield
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pump
Installation Year
2008
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
26
Est Cost Prop Damage
750
Est Cost Emergency
500
Est Cost Environmental
0
Est Cost Other
0
Prpty
1276
Accident Psig
1187.6
Mop Psig
1400
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Action of operator cannot cause a pump seal failure therefore it was not necessary to complete an investigation into the controllers actions.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Normal Wear
Preparer Name
L***** H***
Preparer Title
Pipeline Safety Engineer Iii
Preparer Email
L**********@w*******.com
Preparer Telephone
9185734806
Prepared Date
2020-06-15 00:00:00
Authorizer Name
C**** R****
Authorizer Telephone
9185736724
Authorizer Title
Mgr Pipeline Safety
Authorizer Email
C**********@w*******.com
Narrative
On may 14th 2020 at 6:50am mst operation personnel completing preventive maintenance task drove up to the site gate at pgx tankage and noticed a vapor cloud of ngl and esd station. It was determined a leak occurred on p-4267. The leak location was within the secondary containment for the ngl storage tanks and 69 out of 70 gallons that was released on the ground were recovered from a vac truck. The valve cover gasket was replaced same day and with no leaks detected at that point in time. Secondary contributing factor to leak was pump seal is attached to a drain line that is connected to a drain tank and during the pump seal leak the drain line was working properly and continued to fill tk-4813 until static head was great enough to caused the direction of flow from the tk-4813 back to the leak point on p-4627 in which the ngl discharged onto the ground. Tk-4813 currently only has a local level gauge with no transmitting capacity to scada. On may 18th pump was idle and determined leak was still presence from another personnel performing pm task, pump was re-isolated and put out of service as a part of maintenance activity to replace a pump seal packing. Issued was resolved and put back into service without any additional issues. Actions taken to reduce likelihood of future release. 1) drain line has a pressure switch high high (pshh4627) that was set at 30 psi and has been decreased to 10 psi to be able to detect future back flow condition.
Report Received Date 2020-06-08 00:00:00
Iyear 2020
Report Number 20200169
Supplemental Number 33901
Report Type Supplemental Final
Operator Id 30826 PHMSA Enforcement
Name Williams Field Services
Operator Street Address One Williams Center Wrc-3
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74172
Local Datetime 2020-05-14 06:50:00
Location Latitude 39.483 Google Maps OpenStreetMap
Location Longitude -108.11315 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 3.6
Intentional Release Bbls 0
Recovered Bbls 1.6
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2020-05-14 07:00:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2020-05-14 07:00:00
Restart Datetime 2020-05-14 12:00:00
On Site Datetime 2020-05-14 07:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Pgx Ngl Storage Facility
Segment Name 20004-T-T-T
Onshore State Abbreviation Co
Onshore Postal Code 81635-9715
Onshore City Name Not Within A Municipality
Onshore County Name Garfield
Designated Location Survey Station No.
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Pump
Installation Year 2008
Material Involved Carbon Steel
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 26
Est Cost Prop Damage 750
Est Cost Emergency 500
Est Cost Environmental 0
Est Cost Other 0
Prpty 1276
Accident Psig 1187.6
Mop Psig 1400
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Action of operator cannot cause a pump seal failure therefore it was not necessary to complete an investigation into the controllers actions.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Pump Or Pump-Related Equipment
Eq Failure Type Pump Or Pump-Related Equipment
Other Pump Ind Seal/packing Failure
Eq Additional Other Ind Yes
Eq Additional Other Details Normal Wear
Preparer Name L***** H***
Preparer Title Pipeline Safety Engineer Iii
Preparer Email L**********@w*******.com
Preparer Telephone 9185734806
Prepared Date 2020-06-15 00:00:00
Authorizer Name C**** R****
Authorizer Telephone 9185736724
Authorizer Title Mgr Pipeline Safety
Authorizer Email C**********@w*******.com
Narrative On may 14th 2020 at 6:50am mst operation personnel completing preventive maintenance task drove up to the site gate at pgx tankage and noticed a vapor cloud of ngl and esd station. It was determined a leak occurred on p-4267. The leak location was within the secondary containment for the ngl storage tanks and 69 out of 70 gallons that was released on the ground were recovered from a vac truck. The valve cover gasket was replaced same day and with no leaks detected at that point in time. Secondary contributing factor to leak was pump seal is attached to a drain line that is connected to a drain tank and during the pump seal leak the drain line was working properly and continued to fill tk-4813 until static head was great enough to caused the direction of flow from the tk-4813 back to the leak point on p-4627 in which the ngl discharged onto the ground. Tk-4813 currently only has a local level gauge with no transmitting capacity to scada. On may 18th pump was idle and determined leak was still presence from another personnel performing pm task, pump was re-isolated and put out of service as a part of maintenance activity to replace a pump seal packing. Issued was resolved and put back into service without any additional issues. Actions taken to reduce likelihood of future release. 1) drain line has a pressure switch high high (pshh4627) that was set at 30 psi and has been decreased to 10 psi to be able to detect future back flow condition.

All rights reserved. Copyright © by ClearPHMSA