Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2020-05-06 — TX
Operator
Enbridge Energy, Limited Partnership
Cause
Natural Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$184,720
Incident datetime
2020-05-06 12:45
Report number
Location
TX
Narrative
On may 6, 2020 at 12:45 pm cdt, product was visible near the line 1 mp 801 valve by the technician when he arrived at the valve site to complete scheduled maintenance. The edmonton control center was contacted and the line was shut down to investigate. Additional crews were dispatched to determine the source of the product. After removing standing water and excavating the area, it was discovered that the seal packing pipes had cracked causing approximately 1 cup of crude oil to be released. The internal investigation determined that frost heave caused the piping to crack. On the evening of may 8, 2020 the plan to replace the piping was finalized and it was determined that the costs for repair and clean up would meet the requirement for an nrc notification. The nrc was notified at 9:05 pm cdt (#1276936). On may 9, 2020 the seal packing and body bleep piping was replaced and the line placed back into service at 2:35 am cdt. A 48-hour update to the nrc was made on may 10, 2020 at 4:35 pm cdt (#1277006). Upon completing the valve repair and in an effort to remediate the impacts, enbridge performed additional excavation activities to address the release. Preliminary excavation resulted in the discovery of impacted soils in unanticipated locations. Consequently, enbridge has initiated a site investigation designed to further assess potential impacts from the valve release as well as potential previous impacts. The goal remains to remediate to applicable environmental standards with the possibility of additional excavation. Due to the remote location of the site, costs are inflated for dispatching qualified professionals to perform investigatory work and impacted materials must be transported great distances for disposal at permitted facilities. The actual volume released at mp 801 was 0.0015 barrels. The PHMSA portal does not recognize volumes less than 0.1 barrels therefore that is the volume entered.
Detailed record list
Report Received Date
2020-06-05 00:00:00
Iyear
2020
Report Number
20200167
Supplemental Number
33867
Report Type
Original Final
Operator Id
11169
Name
Enbridge Energy, Limited Partnership
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2020-05-06 12:45:00
Location Latitude
48.712069
Location Longitude
-97.123908
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.1
Recovered Bbls
0.1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2020-05-06 12:45:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2020-05-06 12:55:00
Restart Datetime
2020-05-09 02:35:00
On Site Datetime
2020-05-06 12:45:00
Nrc Rpt Datetime
2020-05-08 21:05:00
Nrc Rpt Num
1276936
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Line 1
Segment Name
Mp 801
Onshore State Abbreviation
Nd
Onshore Postal Code
58225
Onshore City Name
Drayton
Onshore County Name
Pembina
Designated Location
Milepost/valve Station
Designated Name
801
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
72
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Gate
Valve Manufacturer
M&j (Spx Flow)
Installation Year
1997
Manufactured Year
1994
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1
Est Cost Prop Damage
184720
Est Cost Emergency
57
Est Cost Environmental
45000
Est Cost Other
0
Prpty
229778
Accident Psig
999
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
71016
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind
Yes
Invest No Schedule Ind Details
Investigation Did Not Yield Results That Indicated Any Controller Contribution (Field Identified The Leak)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Temperature
Natural Force Type
Temperature
Temperature Subtype
Frost Heave
Nf Extreme Weather Ind
No
Preparer Name
S**** S****
Preparer Title
Sr Compliance Analyst
Preparer Email
S**********@e*******.com
Preparer Telephone
715-395-3620
Prepared Date
2020-06-05 00:00:00
Authorizer Name
R** C*******
Authorizer Telephone
715-395-3619
Authorizer Title
Supervisor Us Pipeline Compliance
Authorizer Email
R***********@e*******.com
Narrative
On may 6, 2020 at 12:45 pm cdt, product was visible near the line 1 mp 801 valve by the technician when he arrived at the valve site to complete scheduled maintenance. The edmonton control center was contacted and the line was shut down to investigate. Additional crews were dispatched to determine the source of the product. After removing standing water and excavating the area, it was discovered that the seal packing pipes had cracked causing approximately 1 cup of crude oil to be released. The internal investigation determined that frost heave caused the piping to crack. On the evening of may 8, 2020 the plan to replace the piping was finalized and it was determined that the costs for repair and clean up would meet the requirement for an nrc notification. The nrc was notified at 9:05 pm cdt (#1276936). On may 9, 2020 the seal packing and body bleep piping was replaced and the line placed back into service at 2:35 am cdt. A 48-hour update to the nrc was made on may 10, 2020 at 4:35 pm cdt (#1277006). Upon completing the valve repair and in an effort to remediate the impacts, enbridge performed additional excavation activities to address the release. Preliminary excavation resulted in the discovery of impacted soils in unanticipated locations. Consequently, enbridge has initiated a site investigation designed to further assess potential impacts from the valve release as well as potential previous impacts. The goal remains to remediate to applicable environmental standards with the possibility of additional excavation. Due to the remote location of the site, costs are inflated for dispatching qualified professionals to perform investigatory work and impacted materials must be transported great distances for disposal at permitted facilities. The actual volume released at mp 801 was 0.0015 barrels. The PHMSA portal does not recognize volumes less than 0.1 barrels therefore that is the volume entered.
| Report Received Date | 2020-06-05 00:00:00 |
|---|---|
| Iyear | 2020 |
| Report Number | 20200167 |
| Supplemental Number | 33867 |
| Report Type | Original Final |
| Operator Id | 11169 PHMSA Enforcement |
| Name | Enbridge Energy, Limited Partnership |
| Operator Street Address | 915 N Eldridge Parkway, Suite 1100 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2020-05-06 12:45:00 |
| Location Latitude | 48.712069 Google Maps OpenStreetMap |
| Location Longitude | -97.123908 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.1 |
| Recovered Bbls | 0.1 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2020-05-06 12:45:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2020-05-06 12:55:00 |
| Restart Datetime | 2020-05-09 02:35:00 |
| On Site Datetime | 2020-05-06 12:45:00 |
| Nrc Rpt Datetime | 2020-05-08 21:05:00 |
| Nrc Rpt Num | 1276936 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Line 1 |
| Segment Name | Mp 801 |
| Onshore State Abbreviation | Nd |
| Onshore Postal Code | 58225 |
| Onshore City Name | Drayton |
| Onshore County Name | Pembina |
| Designated Location | Milepost/valve Station |
| Designated Name | 801 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 72 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Valve Mainline Type | Gate |
| Valve Manufacturer | M&j (Spx Flow) |
| Installation Year | 1997 |
| Manufactured Year | 1994 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1 |
| Est Cost Prop Damage | 184720 |
| Est Cost Emergency | 57 |
| Est Cost Environmental | 45000 |
| Est Cost Other | 0 |
| Prpty | 229778 |
| Accident Psig | 999 |
| Mop Psig | 1440 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 71016 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Schedule Ind | Yes |
| Invest No Schedule Ind Details | Investigation Did Not Yield Results That Indicated Any Controller Contribution (Field Identified The Leak) |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Natural Force Damage |
| Cause Details | Temperature |
| Natural Force Type | Temperature |
| Temperature Subtype | Frost Heave |
| Nf Extreme Weather Ind | No |
| Preparer Name | S**** S**** |
| Preparer Title | Sr Compliance Analyst |
| Preparer Email | S**********@e*******.com |
| Preparer Telephone | 715-395-3620 |
| Prepared Date | 2020-06-05 00:00:00 |
| Authorizer Name | R** C******* |
| Authorizer Telephone | 715-395-3619 |
| Authorizer Title | Supervisor Us Pipeline Compliance |
| Authorizer Email | R***********@e*******.com |
| Narrative | On may 6, 2020 at 12:45 pm cdt, product was visible near the line 1 mp 801 valve by the technician when he arrived at the valve site to complete scheduled maintenance. The edmonton control center was contacted and the line was shut down to investigate. Additional crews were dispatched to determine the source of the product. After removing standing water and excavating the area, it was discovered that the seal packing pipes had cracked causing approximately 1 cup of crude oil to be released. The internal investigation determined that frost heave caused the piping to crack. On the evening of may 8, 2020 the plan to replace the piping was finalized and it was determined that the costs for repair and clean up would meet the requirement for an nrc notification. The nrc was notified at 9:05 pm cdt (#1276936). On may 9, 2020 the seal packing and body bleep piping was replaced and the line placed back into service at 2:35 am cdt. A 48-hour update to the nrc was made on may 10, 2020 at 4:35 pm cdt (#1277006). Upon completing the valve repair and in an effort to remediate the impacts, enbridge performed additional excavation activities to address the release. Preliminary excavation resulted in the discovery of impacted soils in unanticipated locations. Consequently, enbridge has initiated a site investigation designed to further assess potential impacts from the valve release as well as potential previous impacts. The goal remains to remediate to applicable environmental standards with the possibility of additional excavation. Due to the remote location of the site, costs are inflated for dispatching qualified professionals to perform investigatory work and impacted materials must be transported great distances for disposal at permitted facilities. The actual volume released at mp 801 was 0.0015 barrels. The PHMSA portal does not recognize volumes less than 0.1 barrels therefore that is the volume entered. |