GD incident on 2020-11-12 — OH

Operator
Dominion Energy Ohio
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$72,534
Incident datetime
2020-11-12 12:39
Report number
Location
OH, SUMMIT
Narrative
A third party contractor doing road work hit a 20" high pressure distribution pipeline operating at 50psig. In order to avoid a large-scale outage, the area was secured and monitored while a 20" stopple fitting was procured and installed to isolate the gas release. This limited the impact to four commercial and four residential customers. The cause of this event was that the third party excavator failed to maintain adequate clearance between powered equipment and the underground facility. Deo has determined that the excavator was aware of the presence of deo's facilities, but elected not to utilize hand tools, instead attempting to dig with powered equipment in close proximity to the pipeline.
Detailed record list
Occurred At
2020-11-12 12:39:00
Year
2020
Report Received Date
2020-12-11 00:00:00
Iyear
2020.0
Report Number
20200125.0
Supplemental Number
35155.0
Report Type
Supplemental Final
Operator Id
Name
Dominion Energy Ohio
Operator Street Address
1201 East 55th Street
Operator City Name
Cleveland
Operator State Abbreviation
OH
Operator Postal Code
44103
Local Datetime
2020-11-12 12:39:00
Time Zone
Eastern
Daylight Savings Ind
No
Location Street Address
278 S. Cleveland Massillon Road
Location City Name
Akron
Location County Name
Summit
Location State Abbreviation
OH
Location Postal Code
44333
Location Latitude
Location Longitude
Flow Cont Key Crit Ind
Yes
Flow Cont Main Valve Ind
Yes
Flow Cont Stopple Fitng Ind
Yes
Nrc Rpt Datetime
2020-11-12 20:52:00
Nrc Rpt Num
Additional Nrc Report Numbers
1292269
Commodity Released Type
Natural Gas
Unintentional Release
2427.0
Intentional Release
112.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2020-11-12 12:39:00
Communication State Fed Ind
No
On Site Datetime
2020-11-12 13:05:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
38.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
2016.0
Manufactured Year
2016.0
Pipe Diameter
20.0
Pipe Specification
Api 5l
Pipe Manufacturer
American Steel
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Smls
Wt Steel
0.375
Release Type
Mechanical Puncture
Puncture Axial
1.0
Puncture Circum
2.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
2792.0
Est Cost Prop Damage
72534.0
Est Cost Emergency
10334.0
Est Cost Other
0.0
Gas Cost In Mcf
2.65
Est Cost Unintentional Release
6432.0
Est Cost Intentional Release
297.0
Prpty
92389.0
Commercial Affected
4.0
Industrial Affected
0.0
Residences Affected
4.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
4.0
Num Business Building Affctd
4.0
Accident Psig
50.0
Normal Psig
50.0
Mop Psig
60.0
Mop Cfr Section
192.619(A)(2)
Maop Established Date
2016-06-06 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Combination Of Odorization Types
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
State Law Exempt Ind
No
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Road Work
One Call Notified Ind
Yes
One Call Ticket Num
A031000922
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
23.0
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
J****** B*******
Preparer Title
Pipeline Safety Supervisor
Preparer Email
J*****************@d*************.com
Preparer Telephone
3307545524
Local Contact Name
J****** B*******
Local Contact Email
J*****************@d*************.com
Local Contact Telephone
3307545524
Authorizer Name
C**** H****
Authorizer Title
Gas Operations Manager
Authorizer Telephone
3304379557
Authorizer Email
C************@d*************.com
Narrative
A third party contractor doing road work hit a 20" high pressure distribution pipeline operating at 50psig. In order to avoid a large-scale outage, the area was secured and monitored while a 20" stopple fitting was procured and installed to isolate the gas release. This limited the impact to four commercial and four residential customers. The cause of this event was that the third party excavator failed to maintain adequate clearance between powered equipment and the underground facility. Deo has determined that the excavator was aware of the presence of deo's facilities, but elected not to utilize hand tools, instead attempting to dig with powered equipment in close proximity to the pipeline.
Occurred At 2020-11-12 12:39:00
Year 2020
Report Received Date 2020-12-11 00:00:00
Iyear 2020.0
Report Number 20200125.0
Supplemental Number 35155.0
Report Type Supplemental Final
Operator Id 4060 PHMSA Enforcement
Name Dominion Energy Ohio
Operator Street Address 1201 East 55th Street
Operator City Name Cleveland
Operator State Abbreviation OH
Operator Postal Code 44103
Local Datetime 2020-11-12 12:39:00
Time Zone Eastern
Daylight Savings Ind No
Location Street Address 278 S. Cleveland Massillon Road
Location City Name Akron
Location County Name Summit
Location State Abbreviation OH
Location Postal Code 44333
Location Latitude 41.1293734 Google Maps OpenStreetMap
Location Longitude -81.6344553 Google Maps OpenStreetMap
Flow Cont Key Crit Ind Yes
Flow Cont Main Valve Ind Yes
Flow Cont Stopple Fitng Ind Yes
Nrc Rpt Datetime 2020-11-12 20:52:00
Nrc Rpt Num 1292056 NRC Report How to search
Additional Nrc Report Numbers 1292269
Commodity Released Type Natural Gas
Unintentional Release 2427.0
Intentional Release 112.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2020-11-12 12:39:00
Communication State Fed Ind No
On Site Datetime 2020-11-12 13:05:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 38.0
Other Underground Facilities No
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Main
Installation Year 2016.0
Manufactured Year 2016.0
Pipe Diameter 20.0
Pipe Specification Api 5l
Pipe Manufacturer American Steel
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Smls
Wt Steel 0.375
Release Type Mechanical Puncture
Puncture Axial 1.0
Puncture Circum 2.0
Class Location Type Class 3 Location
Est Cost Oper Paid 2792.0
Est Cost Prop Damage 72534.0
Est Cost Emergency 10334.0
Est Cost Other 0.0
Gas Cost In Mcf 2.65
Est Cost Unintentional Release 6432.0
Est Cost Intentional Release 297.0
Prpty 92389.0
Commercial Affected 4.0
Industrial Affected 0.0
Residences Affected 4.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 0.0
Num Resident Building Affctd 4.0
Num Business Building Affctd 4.0
Accident Psig 50.0
Normal Psig 50.0
Mop Psig 60.0
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Maop Established Date 2016-06-06 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type Combination Of Odorization Types
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
State Law Exempt Ind No
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype City Street
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Road Work
One Call Notified Ind Yes
One Call Ticket Num A031000922
Locator Type Contract Locator
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 23.0
Root Cause Category Excavation Issue
Root Cause Type Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name J****** B*******
Preparer Title Pipeline Safety Supervisor
Preparer Email J*****************@d*************.com
Preparer Telephone 3307545524
Local Contact Name J****** B*******
Local Contact Email J*****************@d*************.com
Local Contact Telephone 3307545524
Authorizer Name C**** H****
Authorizer Title Gas Operations Manager
Authorizer Telephone 3304379557
Authorizer Email C************@d*************.com
Narrative A third party contractor doing road work hit a 20" high pressure distribution pipeline operating at 50psig. In order to avoid a large-scale outage, the area was secured and monitored while a 20" stopple fitting was procured and installed to isolate the gas release. This limited the impact to four commercial and four residential customers. The cause of this event was that the third party excavator failed to maintain adequate clearance between powered equipment and the underground facility. Deo has determined that the excavator was aware of the presence of deo's facilities, but elected not to utilize hand tools, instead attempting to dig with powered equipment in close proximity to the pipeline.

All rights reserved. Copyright © by ClearPHMSA