GD incident on 2020-10-20 — PA

Operator
Columbia Gas Of Pennsylvania
Cause
Notification Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$112,615
Incident datetime
2020-10-20 16:50
Report number
Location
PA, ALLEGHENY
Narrative
On october 20, 2020, at approximately 16:00, graham and sons, inc. Was excavating with a bulldozer in the area of lafayette dr. In south fayette twp, pa and struck columbia's 10 inch transmission class mainline causing a release of natural gas. The excavator did not have a valid one call ticket because they never contacted the one call center prior to excavation. Line markers were visible. The estimated cost to repair the damages is $124,000.
Detailed record list
Occurred At
2020-10-20 16:50:00
Year
2020
Report Received Date
2020-11-20 00:00:00
Iyear
2020.0
Report Number
20200118.0
Supplemental Number
34689.0
Report Type
Supplemental Final
Operator Id
Name
Columbia Gas Of Pennsylvania
Operator Street Address
121 Champion Way
Operator City Name
Canonsburg
Operator State Abbreviation
PA
Operator Postal Code
15317
Local Datetime
2020-10-20 16:50:00
Time Zone
Eastern
Daylight Savings Ind
No
Location Street Address
Lafayette Dr And Battle Ridge Dr
Location City Name
South Fayette Twp
Location County Name
Allegheny
Location State Abbreviation
PA
Location Postal Code
15057
Location Latitude
Location Longitude
Flow Cont Meter Reg Ind
Yes
Flow Cont Stopple Fitng Ind
Yes
Nrc Rpt Datetime
2020-10-20 17:43:00
Nrc Rpt Num
Additional Nrc Report Numbers
1290439
Commodity Released Type
Natural Gas
Unintentional Release
1378.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2020-10-20 16:50:00
Communication State Fed Ind
No
On Site Datetime
2020-10-20 16:32:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
6.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1959.0
Pipe Diameter
10.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Seamless
Wt Steel
0.28
Release Type
Mechanical Puncture
Puncture Axial
2.0
Puncture Circum
0.5
Class Location Type
Class 1 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
112615.0
Est Cost Emergency
122085.0
Est Cost Other
0.0
Gas Cost In Mcf
1.4296
Est Cost Unintentional Release
1970.0
Est Cost Intentional Release
0.0
Prpty
236670.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
0.0
Num Business Building Affctd
0.0
Accident Psig
332.0
Normal Psig
325.0
Mop Psig
375.0
Mop Cfr Section
192.619(A)(1)
Maop Established Date
2013-12-17 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Odorized By Others
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
This was a facility damage.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
State Law Exempt Ind
No
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
County Road
Excavator Type
Contractor
Excavator Equipment
Grader/scraper
Work Performed
Grading
One Call Notified Ind
No
Service Interruption
No
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
R****** W B****
Preparer Title
Operations Compliance Manager
Preparer Email
R*****@n*******.com
Preparer Telephone
7243217155
Authorizer Name
M****** J D********
Authorizer Title
Vp And General Manager
Authorizer Telephone
4125599678
Authorizer Email
M******@n*******.com
Narrative
On october 20, 2020, at approximately 16:00, graham and sons, inc. Was excavating with a bulldozer in the area of lafayette dr. In south fayette twp, pa and struck columbia's 10 inch transmission class mainline causing a release of natural gas. The excavator did not have a valid one call ticket because they never contacted the one call center prior to excavation. Line markers were visible. The estimated cost to repair the damages is $124,000.
Occurred At 2020-10-20 16:50:00
Year 2020
Report Received Date 2020-11-20 00:00:00
Iyear 2020.0
Report Number 20200118.0
Supplemental Number 34689.0
Report Type Supplemental Final
Operator Id 2600 PHMSA Enforcement
Name Columbia Gas Of Pennsylvania
Operator Street Address 121 Champion Way
Operator City Name Canonsburg
Operator State Abbreviation PA
Operator Postal Code 15317
Local Datetime 2020-10-20 16:50:00
Time Zone Eastern
Daylight Savings Ind No
Location Street Address Lafayette Dr And Battle Ridge Dr
Location City Name South Fayette Twp
Location County Name Allegheny
Location State Abbreviation PA
Location Postal Code 15057
Location Latitude 40.362638 Google Maps OpenStreetMap
Location Longitude -80.188425 Google Maps OpenStreetMap
Flow Cont Meter Reg Ind Yes
Flow Cont Stopple Fitng Ind Yes
Nrc Rpt Datetime 2020-10-20 17:43:00
Nrc Rpt Num 1290256 NRC Report How to search
Additional Nrc Report Numbers 1290439
Commodity Released Type Natural Gas
Unintentional Release 1378.0
Intentional Release 0.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2020-10-20 16:50:00
Communication State Fed Ind No
On Site Datetime 2020-10-20 16:32:00
Federal No
Location Type Public Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 6.0
Other Underground Facilities No
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 1959.0
Pipe Diameter 10.0
Pipe Specification Unknown
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Seamless
Wt Steel 0.28
Release Type Mechanical Puncture
Puncture Axial 2.0
Puncture Circum 0.5
Class Location Type Class 1 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 112615.0
Est Cost Emergency 122085.0
Est Cost Other 0.0
Gas Cost In Mcf 1.4296
Est Cost Unintentional Release 1970.0
Est Cost Intentional Release 0.0
Prpty 236670.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 0.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 0.0
Num Resident Building Affctd 0.0
Num Business Building Affctd 0.0
Accident Psig 332.0
Normal Psig 325.0
Mop Psig 375.0
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Maop Established Date 2013-12-17 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type Odorized By Others
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details This was a facility damage.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
State Law Exempt Ind No
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype County Road
Excavator Type Contractor
Excavator Equipment Grader/scraper
Work Performed Grading
One Call Notified Ind No
Service Interruption No
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name R****** W B****
Preparer Title Operations Compliance Manager
Preparer Email R*****@n*******.com
Preparer Telephone 7243217155
Authorizer Name M****** J D********
Authorizer Title Vp And General Manager
Authorizer Telephone 4125599678
Authorizer Email M******@n*******.com
Narrative On october 20, 2020, at approximately 16:00, graham and sons, inc. Was excavating with a bulldozer in the area of lafayette dr. In south fayette twp, pa and struck columbia's 10 inch transmission class mainline causing a release of natural gas. The excavator did not have a valid one call ticket because they never contacted the one call center prior to excavation. Line markers were visible. The estimated cost to repair the damages is $124,000.

All rights reserved. Copyright © by ClearPHMSA