GD incident on 2020-09-08 — OR
Operator
Avista Corp
Cause
Other Outside Force Damage
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$438,063
Incident datetime
2020-09-08 11:00
Report number
Location
OR, JACKSON
Narrative
On 9/8/20, avista became aware of several fires in the medford, oregon area. As a precaution, avista operations decided to close 34 valves and perform multiple cut and caps where necessary to isolate customers located in high fire-risk areas in ashland, talent, phoenix and medford, oregon. On 9/9/20 avista notified the national response center (nrc) since avista's response to the fires were decided (per the definition of confirmed discovery) to meet the definition of an "incident" as defined in 49 cfr 191.3, specifically, that there was a release of gas and an anticipated estimated property damage of greater than $50,000. Beginning on 9/10/20 avista began assessing all meters and risers within these zones, consisting of 1,368 individual inspection sites, of which 1,300 were associated to an active customer account. Of those assessed, 904 meter points were identified as a total loss which had an active customer account associated to them and 396 points with active accounts were assessed as ok to relight. On 9/19/20 avista performed a meter safety check on 748 meters and risers outside of the known shut down zones, resulting in identifying 84 additional meters as a total loss which were connected to an active customer account. An additional eight meters were identified as ok to relight. Throughout the event avista worked to relight all customers with active accounts who were either identified as ok to relight or required repairs before relight. Any customer not home during the initial visit received a door hanger and once ready, avista has returned to safely relight their appliances. Remaining customers are being handled on an individual case by case basis, as applicable, by the medford construction department to address each unique circumstance so natural gas can be restored when appropriate. Rebuilding and future plans for demolition and new construction will be ongoing for the foreseeable future in the areas affected. If estimated property damage exceeds 20% of the amount indicated on line d2e, a supplemental report will be submitted. A supplemental final report was submitted on 12/10/2020 due to an increase in property damage exceeding 20% of the previously submitted amount.
Detailed record list
Occurred At
2020-09-08 11:00:00
Year
2020
Report Received Date
2020-10-08 00:00:00
Iyear
2020.0
Report Number
20200094.0
Supplemental Number
34610.0
Report Type
Supplemental Final
Operator Id
31232
Name
Avista Corp
Operator Street Address
1411 East Mission (Po Box 3727, 99220-3727)
Operator City Name
Spokane
Operator State Abbreviation
WA
Operator Postal Code
99202
Local Datetime
2020-09-09 17:00:00
Location Street Address
Unknown
Location City Name
Talent
Location County Name
Jackson
Location State Abbreviation
OR
Location Postal Code
97540
Location Latitude
42.221879
Location Longitude
-122.817256
Nrc Rpt Datetime
2020-09-09 17:30:00
Nrc Rpt Num
1287140
Commodity Released Type
Natural Gas
Unintentional Release
16.67
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
5600.0
Incident Identified Datetime
2020-09-08 11:00:00
On Site Datetime
2020-09-08 11:15:00
Federal
No
Location Type
Private Property
Incident Area Type
Aboveground
Incident Area Subtype
Other
Incident Area Details
Risers And Meters
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Outside Meter/regulator Set
Material Involved
Other
Material Details
Aluminum Meters And Associated Risers
Release Type
Other
Release Type Details
Fire Consumed Outside Meter Set Assemblies
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
438063.0
Est Cost Emergency
169242.0
Est Cost Other
0.0
Est Cost Unintentional Release
73.0
Prpty
607378.0
Commercial Affected
100.0
Industrial Affected
0.0
Residences Affected
1400.0
Accident Psig
55.0
Normal Psig
55.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Other
Accident Details
Local And State Officials Monitoring Fires
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Nearby Industrial, Man-Made, Or Other Fire/explosion As Primary Cause Of Incident
Outside Force Type
Nearby Industrial, Man-Made, Or Other Fire/explosion As Primary Cause Of Incident
Preparer Name
B**** S******
Preparer Title
Pipeline Integrity Program Manager
Preparer Email
B************@a*********.com
Preparer Telephone
509-495-2162
Authorizer Name
E******** F**********
Authorizer Title
Manager Of Pipeline Integrity And Compliance
Authorizer Telephone
5094958215
Authorizer Email
E********************@a*********.com
Narrative
On 9/8/20, avista became aware of several fires in the medford, oregon area. As a precaution, avista operations decided to close 34 valves and perform multiple cut and caps where necessary to isolate customers located in high fire-risk areas in ashland, talent, phoenix and medford, oregon. On 9/9/20 avista notified the national response center (nrc) since avista's response to the fires were decided (per the definition of confirmed discovery) to meet the definition of an "incident" as defined in 49 cfr 191.3, specifically, that there was a release of gas and an anticipated estimated property damage of greater than $50,000. Beginning on 9/10/20 avista began assessing all meters and risers within these zones, consisting of 1,368 individual inspection sites, of which 1,300 were associated to an active customer account. Of those assessed, 904 meter points were identified as a total loss which had an active customer account associated to them and 396 points with active accounts were assessed as ok to relight. On 9/19/20 avista performed a meter safety check on 748 meters and risers outside of the known shut down zones, resulting in identifying 84 additional meters as a total loss which were connected to an active customer account. An additional eight meters were identified as ok to relight. Throughout the event avista worked to relight all customers with active accounts who were either identified as ok to relight or required repairs before relight. Any customer not home during the initial visit received a door hanger and once ready, avista has returned to safely relight their appliances. Remaining customers are being handled on an individual case by case basis, as applicable, by the medford construction department to address each unique circumstance so natural gas can be restored when appropriate. Rebuilding and future plans for demolition and new construction will be ongoing for the foreseeable future in the areas affected. If estimated property damage exceeds 20% of the amount indicated on line d2e, a supplemental report will be submitted. A supplemental final report was submitted on 12/10/2020 due to an increase in property damage exceeding 20% of the previously submitted amount.
| Occurred At | 2020-09-08 11:00:00 |
|---|---|
| Year | 2020 |
| Report Received Date | 2020-10-08 00:00:00 |
| Iyear | 2020.0 |
| Report Number | 20200094.0 |
| Supplemental Number | 34610.0 |
| Report Type | Supplemental Final |
| Operator Id | 31232 PHMSA Enforcement |
| Name | Avista Corp |
| Operator Street Address | 1411 East Mission (Po Box 3727, 99220-3727) |
| Operator City Name | Spokane |
| Operator State Abbreviation | WA |
| Operator Postal Code | 99202 |
| Local Datetime | 2020-09-09 17:00:00 |
| Location Street Address | Unknown |
| Location City Name | Talent |
| Location County Name | Jackson |
| Location State Abbreviation | OR |
| Location Postal Code | 97540 |
| Location Latitude | 42.221879 Google Maps OpenStreetMap |
| Location Longitude | -122.817256 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2020-09-09 17:30:00 |
| Nrc Rpt Num | 1287140 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 16.67 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | Yes |
| Explode Ind | No |
| Num Pub Evacuated | 5600.0 |
| Incident Identified Datetime | 2020-09-08 11:00:00 |
| On Site Datetime | 2020-09-08 11:15:00 |
| Federal | No |
| Location Type | Private Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Other |
| Incident Area Details | Risers And Meters |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Outside Meter/regulator Set |
| Material Involved | Other |
| Material Details | Aluminum Meters And Associated Risers |
| Release Type | Other |
| Release Type Details | Fire Consumed Outside Meter Set Assemblies |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 438063.0 |
| Est Cost Emergency | 169242.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 73.0 |
| Prpty | 607378.0 |
| Commercial Affected | 100.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 1400.0 |
| Accident Psig | 55.0 |
| Normal Psig | 55.0 |
| Mop Psig | 60.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Other |
| Accident Details | Local And State Officials Monitoring Fires |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Control Room Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Outside Force Damage |
| Cause Details | Nearby Industrial, Man-Made, Or Other Fire/explosion As Primary Cause Of Incident |
| Outside Force Type | Nearby Industrial, Man-Made, Or Other Fire/explosion As Primary Cause Of Incident |
| Preparer Name | B**** S****** |
| Preparer Title | Pipeline Integrity Program Manager |
| Preparer Email | B************@a*********.com |
| Preparer Telephone | 509-495-2162 |
| Authorizer Name | E******** F********** |
| Authorizer Title | Manager Of Pipeline Integrity And Compliance |
| Authorizer Telephone | 5094958215 |
| Authorizer Email | E********************@a*********.com |
| Narrative | On 9/8/20, avista became aware of several fires in the medford, oregon area. As a precaution, avista operations decided to close 34 valves and perform multiple cut and caps where necessary to isolate customers located in high fire-risk areas in ashland, talent, phoenix and medford, oregon. On 9/9/20 avista notified the national response center (nrc) since avista's response to the fires were decided (per the definition of confirmed discovery) to meet the definition of an "incident" as defined in 49 cfr 191.3, specifically, that there was a release of gas and an anticipated estimated property damage of greater than $50,000. Beginning on 9/10/20 avista began assessing all meters and risers within these zones, consisting of 1,368 individual inspection sites, of which 1,300 were associated to an active customer account. Of those assessed, 904 meter points were identified as a total loss which had an active customer account associated to them and 396 points with active accounts were assessed as ok to relight. On 9/19/20 avista performed a meter safety check on 748 meters and risers outside of the known shut down zones, resulting in identifying 84 additional meters as a total loss which were connected to an active customer account. An additional eight meters were identified as ok to relight. Throughout the event avista worked to relight all customers with active accounts who were either identified as ok to relight or required repairs before relight. Any customer not home during the initial visit received a door hanger and once ready, avista has returned to safely relight their appliances. Remaining customers are being handled on an individual case by case basis, as applicable, by the medford construction department to address each unique circumstance so natural gas can be restored when appropriate. Rebuilding and future plans for demolition and new construction will be ongoing for the foreseeable future in the areas affected. If estimated property damage exceeds 20% of the amount indicated on line d2e, a supplemental report will be submitted. A supplemental final report was submitted on 12/10/2020 due to an increase in property damage exceeding 20% of the previously submitted amount. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA