GD incident on 2020-06-18 — AR

Operator
Centerpoint Energy Resources Corp.
Cause
Notification Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 2 injuries
Property damage (nominal)
$58,472
Incident datetime
2020-06-18 10:17
Report number
Location
AR, PULASKI
Narrative
Contractor installing communications cable was boring perpendicular to 2 inch plastic gas main. Excavator (subcontractor) did not have a valid ticket in their name. Arkups (contract line locator) had noted that further locate activity should be performed on 2 inch plastic prior to excavation and left a sign at the location to be called before excavating in the affected area. Excavator (subcontractor) pot-holed on marks to verify that gas line was located where marks indicated, but mis-identified a different cable as gas piping. Boring head damaged pipe resulting in separation of 2 inch plastic main. Cnp repair crews were excavating in remote location to isolate system and replace damaged main when ignition occurred. Additional cnp crews were called to the site to isolate the system and shut off gas feed to the 2 inch plastic main. The investigation is ongoing.
Detailed record list
Occurred At
2020-06-18 10:17:00
Year
2020
Report Received Date
2020-07-09 00:00:00
Iyear
2020.0
Report Number
20200062.0
Supplemental Number
34129.0
Report Type
Supplemental Final
Operator Id
Name
Centerpoint Energy Resources Corp.
Operator Street Address
10825 E Geddes Ave Suite 410
Operator City Name
Centennial
Operator State Abbreviation
CO
Operator Postal Code
80112
Local Datetime
2020-06-18 10:17:00
Location Street Address
Edgewood Dr & Windwood Ln
Location City Name
Maumelle
Location County Name
Pulaski
Location State Abbreviation
AR
Location Postal Code
72113
Location Latitude
Location Longitude
Nrc Rpt Datetime
2020-06-18 13:25:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
1177.0
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
2
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
0
Num Gp Injuries
0
Injure
2
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
1.0
Incident Identified Datetime
2020-06-18 10:17:00
On Site Datetime
2020-06-18 10:22:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
30.0
Crossing
No
Pipe Facility Type
Other
Pipe Type Other
Publicly Traded Ldc
System Part Involved
Main
Installation Year
1978.0
Pipe Diameter
2.0
Pipe Specification
Astm D2513
Pipe Manufacturer
Unknown
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Plastic Sdr
11
Material Pe Pipe Code
2306
Release Type
Other
Release Type Details
Complete Separation
Class Location Type
Class 3 Location
Est Cost Oper Paid
3000.0
Est Cost Prop Damage
58472.0
Est Cost Emergency
10208.0
Est Cost Other
0.0
Est Cost Unintentional Release
4413.0
Prpty
76093.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
14.0
Accident Psig
35.0
Normal Psig
35.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
Yes
Num Employees Tested
8
Num Employees Failed
0
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Contractor
Excavator Equipment
Boring
Work Performed
Telecommunications
One Call Notified Ind
Yes
One Call Ticket Num
2006040605
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
56.0
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
V***** M******
Preparer Title
District Operations Manager
Preparer Email
V*************@c****************.com
Preparer Telephone
501-377-4633
Authorizer Name
K**** K********
Authorizer Title
Regional Operations Director
Authorizer Telephone
501-377-4669
Authorizer Email
K**************@c*******************
Narrative
Contractor installing communications cable was boring perpendicular to 2 inch plastic gas main. Excavator (subcontractor) did not have a valid ticket in their name. Arkups (contract line locator) had noted that further locate activity should be performed on 2 inch plastic prior to excavation and left a sign at the location to be called before excavating in the affected area. Excavator (subcontractor) pot-holed on marks to verify that gas line was located where marks indicated, but mis-identified a different cable as gas piping. Boring head damaged pipe resulting in separation of 2 inch plastic main. Cnp repair crews were excavating in remote location to isolate system and replace damaged main when ignition occurred. Additional cnp crews were called to the site to isolate the system and shut off gas feed to the 2 inch plastic main. The investigation is ongoing.
Occurred At 2020-06-18 10:17:00
Year 2020
Report Received Date 2020-07-09 00:00:00
Iyear 2020.0
Report Number 20200062.0
Supplemental Number 34129.0
Report Type Supplemental Final
Operator Id 603 PHMSA Enforcement
Name Centerpoint Energy Resources Corp.
Operator Street Address 10825 E Geddes Ave Suite 410
Operator City Name Centennial
Operator State Abbreviation CO
Operator Postal Code 80112
Local Datetime 2020-06-18 10:17:00
Location Street Address Edgewood Dr & Windwood Ln
Location City Name Maumelle
Location County Name Pulaski
Location State Abbreviation AR
Location Postal Code 72113
Location Latitude 34.866436 Google Maps OpenStreetMap
Location Longitude -92.405425 Google Maps OpenStreetMap
Nrc Rpt Datetime 2020-06-18 13:25:00
Nrc Rpt Num 1279885 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 1177.0
Fatality Ind No
Fatal 0
Injury Ind Yes
Num Emp Injuries 2
Num Contr Injuries 0
Num Er Injuries 0
Num Worker Injuries 0
Num Gp Injuries 0
Injure 2
Ignite Ind Yes
Explode Ind No
Num Pub Evacuated 1.0
Incident Identified Datetime 2020-06-18 10:17:00
On Site Datetime 2020-06-18 10:22:00
Federal No
Location Type Public Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 30.0
Crossing No
Pipe Facility Type Other
Pipe Type Other Publicly Traded Ldc
System Part Involved Main
Installation Year 1978.0
Pipe Diameter 2.0
Pipe Specification Astm D2513
Pipe Manufacturer Unknown
Material Involved Plastic
Plastic Type Polyethylene (Pe)
Plastic Sdr 11
Material Pe Pipe Code 2306
Release Type Other
Release Type Details Complete Separation
Class Location Type Class 3 Location
Est Cost Oper Paid 3000.0
Est Cost Prop Damage 58472.0
Est Cost Emergency 10208.0
Est Cost Other 0.0
Est Cost Unintentional Release 4413.0
Prpty 76093.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 14.0
Accident Psig 35.0
Normal Psig 35.0
Mop Psig 60.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind Yes
Num Employees Tested 8
Num Employees Failed 0
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype City Street
Excavator Type Contractor
Excavator Equipment Boring
Work Performed Telecommunications
One Call Notified Ind Yes
One Call Ticket Num 2006040605
Locator Type Contract Locator
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 56.0
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name V***** M******
Preparer Title District Operations Manager
Preparer Email V*************@c****************.com
Preparer Telephone 501-377-4633
Authorizer Name K**** K********
Authorizer Title Regional Operations Director
Authorizer Telephone 501-377-4669
Authorizer Email K**************@c*******************
Narrative Contractor installing communications cable was boring perpendicular to 2 inch plastic gas main. Excavator (subcontractor) did not have a valid ticket in their name. Arkups (contract line locator) had noted that further locate activity should be performed on 2 inch plastic prior to excavation and left a sign at the location to be called before excavating in the affected area. Excavator (subcontractor) pot-holed on marks to verify that gas line was located where marks indicated, but mis-identified a different cable as gas piping. Boring head damaged pipe resulting in separation of 2 inch plastic main. Cnp repair crews were excavating in remote location to isolate system and replace damaged main when ignition occurred. Additional cnp crews were called to the site to isolate the system and shut off gas feed to the 2 inch plastic main. The investigation is ongoing.

All rights reserved. Copyright © by ClearPHMSA