GD incident on 2020-05-29 — OH

Operator
Northeast Ohio Natural Gas Corp
Cause
Other Outside Force Damage
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$12,439
Incident datetime
2020-05-29 06:11
Report number
Location
OH, TRUMBULL
Narrative
Friday, may 29, 2020 6:11 am received a call from our after hours call servicer about damage from a vehicle accident that resulted in blowing gas. 6:45 arrive on scene to find a farm tap in pieces an blowing gas and that st rt 45 is closed to thru traffic. Both trumbull county sheriff and ohio state highway patrol are on scene. He found out that the homeowner had shut the blowing valve on the 1" steel riser but could still hear gas blowing. 6:55 second employee arrives on scene. Identifies that the damage is to the tap feeding a farm tap that is on our line known as mcflow, a 3" coated steel mainline he identifies the valve to the south at the bloomfield tbs and to the north, hanies rd. And flagg rd. As the valves needed to isolate the damaged tap. 7:15 the occupants of 9347 painesville have left the property. 8:30 the tap is exposed and we can see the size of the crack in the riser. 12:15 pm gas has stopped blowing at damaged tap. While this is all going on buckeye pipeline is contacted and is requested to send a welder and crew to assist in the repair. 1:15 pm contract construction personnel start arriving on scene. An attempt is made to turn in the tap cutter head with the idea of sealing up the tap. But the hole in the mainline that is normally made with the tap cutting head was burned in by a torch at the time the mainline was built and therefore it was larger than the cutting head and would not line up and seal. Ultimately it was decided that additional material would be needed to cut out the tap and replace a section of mainline. The riser was sealed with a plug and the tap cap was sealed, the excavation was backfilled for the night to be continued in the morning with the final repair. Saturday, may 30, 2020 7:00 the section of pipe between the bloomfield tbs to the south and flagg road tbs to the west and pvp / penniman rd. To the east is blown down to prepare for the tap repair. 7:30 am buckeye pipeline begins welding on four taps, two on either side of the damaged tap to be used as air movers. A 15' piece of the 3" main containing the tap is cut out and is replaced. Taps are turned in and sealed. The valve at the bloomfield station is cracked open so the section of mainline can be purged at the flagg rd. Tbs as well as at pvp industries. The welds are soaped to check for leaks and the entire section of pipe is coated and wrapped. 1:00 pm the damaged section of mainline is put back in service.
Detailed record list
Occurred At
2020-05-29 06:11:00
Year
2020
Report Received Date
2020-06-26 00:00:00
Iyear
2020.0
Report Number
20200060.0
Supplemental Number
34034.0
Report Type
Supplemental Final
Operator Id
Name
Northeast Ohio Natural Gas Corp
Operator Street Address
5640 Lancaster Newark Rd Ne
Operator City Name
Pleasantville
Operator State Abbreviation
OH
Operator Postal Code
43148
Local Datetime
2020-05-29 11:26:00
Location Street Address
9347 Sr 45
Location City Name
Bloomfield Township
Location County Name
Trumbull
Location State Abbreviation
OH
Location Postal Code
44450
Location Latitude
Location Longitude
Nrc Rpt Datetime
2020-05-29 11:26:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
97.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
1.0
Incident Identified Datetime
2020-05-29 06:11:00
On Site Datetime
2020-05-29 06:45:00
Federal
No
Location Type
Private Property
Incident Area Type
Transition Area
Incident Area Subtype
Soil/air Interface
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Outside Meter/regulator Set
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Release Type
Other
Release Type Details
Vehicle Damage Caused By An Intoxicated Driver.
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
12439.0
Est Cost Emergency
9653.0
Est Cost Other
0.0
Est Cost Unintentional Release
473.0
Prpty
22565.0
Commercial Affected
0.0
Industrial Affected
1.0
Residences Affected
1.0
Accident Psig
200.0
Normal Psig
200.0
Mop Psig
300.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Outside Force Type
Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Vehicle Subtype
Third Party
Preparer Name
K**** A*******
Preparer Title
Pipeline Safety Compliance Manager
Preparer Email
K********@e***.net
Preparer Telephone
740-400-4314
Preparer Fax
740-862-6330
Authorizer Name
K**** A*******
Authorizer Title
Pipeline Safety Compliance Manager
Authorizer Telephone
6149805858
Authorizer Email
K********@e***.net
Narrative
Friday, may 29, 2020 6:11 am received a call from our after hours call servicer about damage from a vehicle accident that resulted in blowing gas. 6:45 arrive on scene to find a farm tap in pieces an blowing gas and that st rt 45 is closed to thru traffic. Both trumbull county sheriff and ohio state highway patrol are on scene. He found out that the homeowner had shut the blowing valve on the 1" steel riser but could still hear gas blowing. 6:55 second employee arrives on scene. Identifies that the damage is to the tap feeding a farm tap that is on our line known as mcflow, a 3" coated steel mainline he identifies the valve to the south at the bloomfield tbs and to the north, hanies rd. And flagg rd. As the valves needed to isolate the damaged tap. 7:15 the occupants of 9347 painesville have left the property. 8:30 the tap is exposed and we can see the size of the crack in the riser. 12:15 pm gas has stopped blowing at damaged tap. While this is all going on buckeye pipeline is contacted and is requested to send a welder and crew to assist in the repair. 1:15 pm contract construction personnel start arriving on scene. An attempt is made to turn in the tap cutter head with the idea of sealing up the tap. But the hole in the mainline that is normally made with the tap cutting head was burned in by a torch at the time the mainline was built and therefore it was larger than the cutting head and would not line up and seal. Ultimately it was decided that additional material would be needed to cut out the tap and replace a section of mainline. The riser was sealed with a plug and the tap cap was sealed, the excavation was backfilled for the night to be continued in the morning with the final repair. Saturday, may 30, 2020 7:00 the section of pipe between the bloomfield tbs to the south and flagg road tbs to the west and pvp / penniman rd. To the east is blown down to prepare for the tap repair. 7:30 am buckeye pipeline begins welding on four taps, two on either side of the damaged tap to be used as air movers. A 15' piece of the 3" main containing the tap is cut out and is replaced. Taps are turned in and sealed. The valve at the bloomfield station is cracked open so the section of mainline can be purged at the flagg rd. Tbs as well as at pvp industries. The welds are soaped to check for leaks and the entire section of pipe is coated and wrapped. 1:00 pm the damaged section of mainline is put back in service.
Occurred At 2020-05-29 06:11:00
Year 2020
Report Received Date 2020-06-26 00:00:00
Iyear 2020.0
Report Number 20200060.0
Supplemental Number 34034.0
Report Type Supplemental Final
Operator Id 13635 PHMSA Enforcement
Name Northeast Ohio Natural Gas Corp
Operator Street Address 5640 Lancaster Newark Rd Ne
Operator City Name Pleasantville
Operator State Abbreviation OH
Operator Postal Code 43148
Local Datetime 2020-05-29 11:26:00
Location Street Address 9347 Sr 45
Location City Name Bloomfield Township
Location County Name Trumbull
Location State Abbreviation OH
Location Postal Code 44450
Location Latitude 41.283554 Google Maps OpenStreetMap
Location Longitude -80.527737 Google Maps OpenStreetMap
Nrc Rpt Datetime 2020-05-29 11:26:00
Nrc Rpt Num 1278361 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 97.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Num Pub Evacuated 1.0
Incident Identified Datetime 2020-05-29 06:11:00
On Site Datetime 2020-05-29 06:45:00
Federal No
Location Type Private Property
Incident Area Type Transition Area
Incident Area Subtype Soil/air Interface
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Outside Meter/regulator Set
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Unknown
Release Type Other
Release Type Details Vehicle Damage Caused By An Intoxicated Driver.
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 12439.0
Est Cost Emergency 9653.0
Est Cost Other 0.0
Est Cost Unintentional Release 473.0
Prpty 22565.0
Commercial Affected 0.0
Industrial Affected 1.0
Residences Affected 1.0
Accident Psig 200.0
Normal Psig 200.0
Mop Psig 300.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Notification From Public
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Other Outside Force Damage
Cause Details Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Outside Force Type Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Vehicle Subtype Third Party
Preparer Name K**** A*******
Preparer Title Pipeline Safety Compliance Manager
Preparer Email K********@e***.net
Preparer Telephone 740-400-4314
Preparer Fax 740-862-6330
Authorizer Name K**** A*******
Authorizer Title Pipeline Safety Compliance Manager
Authorizer Telephone 6149805858
Authorizer Email K********@e***.net
Narrative Friday, may 29, 2020 6:11 am received a call from our after hours call servicer about damage from a vehicle accident that resulted in blowing gas. 6:45 arrive on scene to find a farm tap in pieces an blowing gas and that st rt 45 is closed to thru traffic. Both trumbull county sheriff and ohio state highway patrol are on scene. He found out that the homeowner had shut the blowing valve on the 1" steel riser but could still hear gas blowing. 6:55 second employee arrives on scene. Identifies that the damage is to the tap feeding a farm tap that is on our line known as mcflow, a 3" coated steel mainline he identifies the valve to the south at the bloomfield tbs and to the north, hanies rd. And flagg rd. As the valves needed to isolate the damaged tap. 7:15 the occupants of 9347 painesville have left the property. 8:30 the tap is exposed and we can see the size of the crack in the riser. 12:15 pm gas has stopped blowing at damaged tap. While this is all going on buckeye pipeline is contacted and is requested to send a welder and crew to assist in the repair. 1:15 pm contract construction personnel start arriving on scene. An attempt is made to turn in the tap cutter head with the idea of sealing up the tap. But the hole in the mainline that is normally made with the tap cutting head was burned in by a torch at the time the mainline was built and therefore it was larger than the cutting head and would not line up and seal. Ultimately it was decided that additional material would be needed to cut out the tap and replace a section of mainline. The riser was sealed with a plug and the tap cap was sealed, the excavation was backfilled for the night to be continued in the morning with the final repair. Saturday, may 30, 2020 7:00 the section of pipe between the bloomfield tbs to the south and flagg road tbs to the west and pvp / penniman rd. To the east is blown down to prepare for the tap repair. 7:30 am buckeye pipeline begins welding on four taps, two on either side of the damaged tap to be used as air movers. A 15' piece of the 3" main containing the tap is cut out and is replaced. Taps are turned in and sealed. The valve at the bloomfield station is cracked open so the section of mainline can be purged at the flagg rd. Tbs as well as at pvp industries. The welds are soaped to check for leaks and the entire section of pipe is coated and wrapped. 1:00 pm the damaged section of mainline is put back in service.