GD incident on 2020-05-19 — MI

Operator
Consumers Energy Co
Cause
Natural Force Damage
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$3,965,252
Incident datetime
2020-05-19 22:41
Report number
Location
MI, MIDLAND
Narrative
On monday, may 19, 2020 at approximately 22:41hours consumers energy (ce) was notified of an odor of gas near m-30 highway and cedar road, edenville township, michigan. A distribution crew was dispatched and arrived on-site at approximately 23:16 hours. Due to extreme weather conditions and flooding in the area, ce personnel was staged throughout the area to assess natural gas facilities and respond to gas emergencies. An investigation confirmed a 4" steel mp pipeline damaged. The pipeline was severed when significant flooding in the area caused a road wash-out. A mueller fitting was installed to contain the blowing gas. Because the pipeline was a one feed, a loss of service to approximately 360 customers occurred. A plan was developed to utilize compresses natural gas (cng) to provide temporary service to the majority of the impacted customers until a permanent plan could be coordinated with the gladwin and midland county roadway commissions. On june 16, 2020 service was reinstated to the majority of impacted customers by completing the installation of approximately 6.25 miles of new gas distribution main. Additional main installation is needed to reinstate the remaining customers (approximately eight customer remaining). The anticipated completion date is july, 15, 2020. The pipeline construction necessary to serve the remaining eight customers was completed on july 24, 2020.
Detailed record list
Occurred At
2020-05-19 22:41:00
Year
2020
Report Received Date
2020-06-18 00:00:00
Iyear
2020.0
Report Number
20200058.0
Supplemental Number
34698.0
Report Type
Supplemental Final
Operator Id
Name
Consumers Energy Co
Operator Street Address
One Energy Plaza
Operator City Name
Jackson
Operator State Abbreviation
MI
Operator Postal Code
49201
Local Datetime
2020-05-19 22:41:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Street Address
M-30 Highway And Cedar Street
Location City Name
Edenville Township
Location County Name
Midland
Location State Abbreviation
MI
Location Postal Code
48628
Location Latitude
Location Longitude
Flow Cont Squeeze Off Ind
Yes
Flow Cont Stopple Fitng Ind
Yes
Nrc Rpt Datetime
2020-05-21 20:02:00
Nrc Rpt Num
Additional Nrc Report Numbers
1277853
Commodity Released Type
Natural Gas
Unintentional Release
447.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2020-05-19 22:41:00
On Site Datetime
2020-05-19 22:16:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36.0
Other Underground Facilities
No
Crossing
Yes
Bridge Crossing Ind
Yes
Bridge Type
Uncased
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1968.0
Pipe Diameter
4.0
Pipe Specification
Api 5l
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Release Type
Leak
Leak Type
Other
Leak Type Other
Severed-Erosion/debris
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
3965252.0
Est Cost Emergency
996.0
Est Cost Other
0.0
Gas Cost In Mcf
2.0
Est Cost Unintentional Release
894.0
Est Cost Intentional Release
0.0
Prpty
3967142.0
Commercial Affected
26.0
Industrial Affected
0.0
Residences Affected
450.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
450.0
Num Business Building Affctd
26.0
Accident Psig
55.0
Normal Psig
55.0
Mop Psig
60.0
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1968-01-01 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Injection Pump
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Emergency Responder
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Heavy Rains/floods
Natural Force Type
Heavy Rains/floods
Heavy Rains Subtype
Washouts/scouring
Nf Extreme Weather Ind
Yes
Nf Other Ind
Yes
Nf Extreme Weather Details
Considerable Rainfall Over Multiple Days Caused A Levee Breach Resulting In Significant Flooding In Mid-Michigan Area.
Preparer Name
C******* K***
Preparer Title
Senior Engineering Technical Analyst Ii
Preparer Email
C************@c********.com
Preparer Telephone
4192905737
Local Contact Name
C******* K***
Local Contact Email
C************@c********.com
Local Contact Telephone
989-280-2963
Authorizer Name
J**** P****
Authorizer Title
Gas Compliance Manager
Authorizer Telephone
989-791-5749
Authorizer Email
J**********@c********.com
Narrative
On monday, may 19, 2020 at approximately 22:41hours consumers energy (ce) was notified of an odor of gas near m-30 highway and cedar road, edenville township, michigan. A distribution crew was dispatched and arrived on-site at approximately 23:16 hours. Due to extreme weather conditions and flooding in the area, ce personnel was staged throughout the area to assess natural gas facilities and respond to gas emergencies. An investigation confirmed a 4" steel mp pipeline damaged. The pipeline was severed when significant flooding in the area caused a road wash-out. A mueller fitting was installed to contain the blowing gas. Because the pipeline was a one feed, a loss of service to approximately 360 customers occurred. A plan was developed to utilize compresses natural gas (cng) to provide temporary service to the majority of the impacted customers until a permanent plan could be coordinated with the gladwin and midland county roadway commissions. On june 16, 2020 service was reinstated to the majority of impacted customers by completing the installation of approximately 6.25 miles of new gas distribution main. Additional main installation is needed to reinstate the remaining customers (approximately eight customer remaining). The anticipated completion date is july, 15, 2020. The pipeline construction necessary to serve the remaining eight customers was completed on july 24, 2020.
Occurred At 2020-05-19 22:41:00
Year 2020
Report Received Date 2020-06-18 00:00:00
Iyear 2020.0
Report Number 20200058.0
Supplemental Number 34698.0
Report Type Supplemental Final
Operator Id 2748 PHMSA Enforcement
Name Consumers Energy Co
Operator Street Address One Energy Plaza
Operator City Name Jackson
Operator State Abbreviation MI
Operator Postal Code 49201
Local Datetime 2020-05-19 22:41:00
Time Zone Eastern
Daylight Savings Ind Yes
Location Street Address M-30 Highway And Cedar Street
Location City Name Edenville Township
Location County Name Midland
Location State Abbreviation MI
Location Postal Code 48628
Location Latitude 43.80576 Google Maps OpenStreetMap
Location Longitude -84.386069 Google Maps OpenStreetMap
Flow Cont Squeeze Off Ind Yes
Flow Cont Stopple Fitng Ind Yes
Nrc Rpt Datetime 2020-05-21 20:02:00
Nrc Rpt Num 1277809 NRC Report How to search
Additional Nrc Report Numbers 1277853
Commodity Released Type Natural Gas
Unintentional Release 447.0
Intentional Release 0.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2020-05-19 22:41:00
On Site Datetime 2020-05-19 22:16:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 36.0
Other Underground Facilities No
Crossing Yes
Bridge Crossing Ind Yes
Bridge Type Uncased
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 1968.0
Pipe Diameter 4.0
Pipe Specification Api 5l
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Unknown
Release Type Leak
Leak Type Other
Leak Type Other Severed-Erosion/debris
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 3965252.0
Est Cost Emergency 996.0
Est Cost Other 0.0
Gas Cost In Mcf 2.0
Est Cost Unintentional Release 894.0
Est Cost Intentional Release 0.0
Prpty 3967142.0
Commercial Affected 26.0
Industrial Affected 0.0
Residences Affected 450.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 0.0
Num Resident Building Affctd 450.0
Num Business Building Affctd 26.0
Accident Psig 55.0
Normal Psig 55.0
Mop Psig 60.0
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Maop Established Date 1968-01-01 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type Injection Pump
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind No
Accident Identifier Notification From Emergency Responder
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Natural Force Damage
Cause Details Heavy Rains/floods
Natural Force Type Heavy Rains/floods
Heavy Rains Subtype Washouts/scouring
Nf Extreme Weather Ind Yes
Nf Other Ind Yes
Nf Extreme Weather Details Considerable Rainfall Over Multiple Days Caused A Levee Breach Resulting In Significant Flooding In Mid-Michigan Area.
Preparer Name C******* K***
Preparer Title Senior Engineering Technical Analyst Ii
Preparer Email C************@c********.com
Preparer Telephone 4192905737
Local Contact Name C******* K***
Local Contact Email C************@c********.com
Local Contact Telephone 989-280-2963
Authorizer Name J**** P****
Authorizer Title Gas Compliance Manager
Authorizer Telephone 989-791-5749
Authorizer Email J**********@c********.com
Narrative On monday, may 19, 2020 at approximately 22:41hours consumers energy (ce) was notified of an odor of gas near m-30 highway and cedar road, edenville township, michigan. A distribution crew was dispatched and arrived on-site at approximately 23:16 hours. Due to extreme weather conditions and flooding in the area, ce personnel was staged throughout the area to assess natural gas facilities and respond to gas emergencies. An investigation confirmed a 4" steel mp pipeline damaged. The pipeline was severed when significant flooding in the area caused a road wash-out. A mueller fitting was installed to contain the blowing gas. Because the pipeline was a one feed, a loss of service to approximately 360 customers occurred. A plan was developed to utilize compresses natural gas (cng) to provide temporary service to the majority of the impacted customers until a permanent plan could be coordinated with the gladwin and midland county roadway commissions. On june 16, 2020 service was reinstated to the majority of impacted customers by completing the installation of approximately 6.25 miles of new gas distribution main. Additional main installation is needed to reinstate the remaining customers (approximately eight customer remaining). The anticipated completion date is july, 15, 2020. The pipeline construction necessary to serve the remaining eight customers was completed on july 24, 2020.