GTG incident on 2020-04-14 — TX
Operator
Panhandle Eastern Pipeline Co
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2020-04-14 09:00
Report number
Location
TX
Narrative
While conducting an esd test the station vented 3.8 mmscf of natural gas. During a normal esd, it takes some time to blowdown the yard piping after activation of the system. When the blowdown valve continued to blow, operations personnel began to investigate and found the 300 suction side gate valve to still be open. The isolation valve under the blowdown valve was closed. Operations personnel isolated the suction side gate valve, then tested the valve and it operated as designed. Operations personnel tested the esd system and found there was an air leak on the esd tubing. The air leak was repaired and the system was tested.
Detailed record list
Report Received Date
2020-05-14 00:00:00
Iyear
2020
Report Number
20200051
Supplemental Number
33756
Report Type
Original Final
Operator Id
15105
Name
Panhandle Eastern Pipeline Co
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2020-04-14 09:20:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
39.47196
Location Longitude
-90.9141
Nrc Rpt Num
1275372
Nrc Rpt Datetime
2020-04-14 09:38:00
Additional Nrc Report Numbers
1275497
Commodity Released Type
Natural Gas
Unintentional Release
3800
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Routine Test Was Being Conducted On Esd System.
Communication State Fed Ind
No
Ignite Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2020-04-14 09:00:00
On Site Datetime
2020-04-14 08:00:00
On Off Shore
Onshore
Onshore State Abbreviation
Il
Onshore Postal Code
62366
Onshore City Name
Pleasant Hill
Onshore County Name
Pike
Designated Location
Not Applicable
Pipe Fac Name
Pleasant Hill Compressor Station
Segment Name
300 Discharge Relief
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Compressor Station Equipment And Piping
Item Involved
Esd System, But Excluding Product Drain Lines And Tubing
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Air Leak On Esd Tubing Prevented Esd Signal Pressure From Reaching The Trip Point Of The Valve. The Valve Didn't Close To Isolate The Gas Flow To The Relief Valve.
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
179
Heat Damage Ind
No
Non Heat Damage Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
8664
Est Cost Intentional Release
0
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Other
0
Gas Cost In Mcf
2.28
Prpty
8664
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
500
Gas Flow In Pipe In Mcf
350
Mop Psig
900
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1954-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Operations personnel were conducting an esd test and had notified the control room prior to testing.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Eq Failure Details
An Air Leak On The Esd Signal Tubing Prevented The Pressure From Building Up High Enough To Trip The 300 Suction Side Gate Valve.
Eq Additional Other Ind
Yes
Eq Additional Other Details
O-Ring And Poppets Prematurely Reached End Of Life.
Preparer Name
K***** H*******
Preparer Title
Senior Specialist Regulatory Compliance
Preparer Email
K***************@e*************.com
Preparer Telephone
713-989-7085
Authorizer Name
D**** N******
Authorizer Title
Senior Director Regulatory Compliance
Authorizer Telephone
713-989-7232
Authorizer Email
D************@e*************.com
Narrative
While conducting an esd test the station vented 3.8 mmscf of natural gas. During a normal esd, it takes some time to blowdown the yard piping after activation of the system. When the blowdown valve continued to blow, operations personnel began to investigate and found the 300 suction side gate valve to still be open. The isolation valve under the blowdown valve was closed. Operations personnel isolated the suction side gate valve, then tested the valve and it operated as designed. Operations personnel tested the esd system and found there was an air leak on the esd tubing. The air leak was repaired and the system was tested.
| Report Received Date | 2020-05-14 00:00:00 |
|---|---|
| Iyear | 2020 |
| Report Number | 20200051 |
| Supplemental Number | 33756 |
| Report Type | Original Final |
| Operator Id | 15105 PHMSA Enforcement |
| Name | Panhandle Eastern Pipeline Co |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2020-04-14 09:20:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 39.47196 Google Maps OpenStreetMap |
| Location Longitude | -90.9141 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1275372 NRC Report How to search |
| Nrc Rpt Datetime | 2020-04-14 09:38:00 |
| Additional Nrc Report Numbers | 1275497 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 3800 |
| Intentional Release | 0 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Normal Operation, Includes Pauses During Maintenance |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Routine Test Was Being Conducted On Esd System. |
| Communication State Fed Ind | No |
| Ignite Ind | No |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2020-04-14 09:00:00 |
| On Site Datetime | 2020-04-14 08:00:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Il |
| Onshore Postal Code | 62366 |
| Onshore City Name | Pleasant Hill |
| Onshore County Name | Pike |
| Designated Location | Not Applicable |
| Pipe Fac Name | Pleasant Hill Compressor Station |
| Segment Name | 300 Discharge Relief |
| Federal | No |
| Location Type | Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Compressor Station Equipment And Piping |
| Item Involved | Esd System, But Excluding Product Drain Lines And Tubing |
| Installation Year | Unknown |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Air Leak On Esd Tubing Prevented Esd Signal Pressure From Reaching The Trip Point Of The Valve. The Valve Didn't Close To Isolate The Gas Flow To The Relief Valve. |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 179 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 8664 |
| Est Cost Intentional Release | 0 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 0 |
| Est Cost Other | 0 |
| Gas Cost In Mcf | 2.28 |
| Prpty | 8664 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 500 |
| Gas Flow In Pipe In Mcf | 350 |
| Mop Psig | 900 |
| Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
| Maop Established Date | 1954-01-01 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | No |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Operations personnel were conducting an esd test and had notified the control room prior to testing. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Other Equipment Failure |
| Eq Failure Type | Other Equipment Failure |
| Eq Failure Details | An Air Leak On The Esd Signal Tubing Prevented The Pressure From Building Up High Enough To Trip The 300 Suction Side Gate Valve. |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | O-Ring And Poppets Prematurely Reached End Of Life. |
| Preparer Name | K***** H******* |
| Preparer Title | Senior Specialist Regulatory Compliance |
| Preparer Email | K***************@e*************.com |
| Preparer Telephone | 713-989-7085 |
| Authorizer Name | D**** N****** |
| Authorizer Title | Senior Director Regulatory Compliance |
| Authorizer Telephone | 713-989-7232 |
| Authorizer Email | D************@e*************.com |
| Narrative | While conducting an esd test the station vented 3.8 mmscf of natural gas. During a normal esd, it takes some time to blowdown the yard piping after activation of the system. When the blowdown valve continued to blow, operations personnel began to investigate and found the 300 suction side gate valve to still be open. The isolation valve under the blowdown valve was closed. Operations personnel isolated the suction side gate valve, then tested the valve and it operated as designed. Operations personnel tested the esd system and found there was an air leak on the esd tubing. The air leak was repaired and the system was tested. |