GD incident on 2020-01-06 — TX

Operator
Atmos Energy Corporation - Mid-Tex
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$80,780
Incident datetime
2020-01-06 16:30
Report number
Location
TX, TARRANT
Narrative
At 4:30 pm on january 6, 2020, a 2nd party contractor was boring a hole at the intersection of e. Main st. And s. Crowley rd. In crowley, tx. The contractor exposed the wrong facility, which resulted in boring into an atmos energy 6" poly main. Atmos energy, using squeeze tools and line stoppers, was able to shut down the line at 9:20 am on january 7, 2020. The cost of repairs for this line has exceeded $50,000. The facility was placed back in service on april 9, 2020.
Detailed record list
Occurred At
2020-01-06 16:30:00
Year
2020
Report Received Date
2020-02-05 00:00:00
Iyear
2020.0
Report Number
20200018.0
Supplemental Number
34374.0
Report Type
Supplemental Final
Operator Id
Name
Atmos Energy Corporation - Mid-Tex
Operator Street Address
5430 Lbj Freeway Suite 1800
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75240
Local Datetime
2020-01-06 16:30:00
Location Street Address
E. Main And S. Crowley Rd.
Location City Name
Crowley
Location County Name
Tarrant
Location State Abbreviation
TX
Location Postal Code
76036
Location Latitude
Location Longitude
-97.35308635
Nrc Rpt Datetime
2020-01-07 18:21:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
66.6
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2020-01-06 16:30:00
On Site Datetime
2020-01-06 18:00:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
132.0
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Bored/drilled
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
2006.0
Pipe Diameter
6.0
Pipe Specification
Astm D2513
Pipe Manufacturer
Performance
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Plastic Sdr
11.5
Material Pe Pipe Code
2306
Release Type
Mechanical Puncture
Puncture Axial
2.0
Puncture Circum
2.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
80780.0
Est Cost Emergency
0.0
Est Cost Other
0.0
Est Cost Unintentional Release
300.0
Prpty
81080.0
Commercial Affected
2.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
25.0
Normal Psig
25.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type
Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Contractor
Excavator Equipment
Boring
Work Performed
Natural Gas
One Call Notified Ind
Yes
One Call Ticket Num
2050249433
One Call Center Name
Texas811
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
1.0
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
T*** M*****
Preparer Title
Operations Supervisor
Preparer Email
T**********@a**********.com
Preparer Telephone
817-207-2870
Authorizer Name
M**** S*****
Authorizer Title
Vice President Technical Services
Authorizer Telephone
214-206-2033
Authorizer Email
M***********@a**********.com
Narrative
At 4:30 pm on january 6, 2020, a 2nd party contractor was boring a hole at the intersection of e. Main st. And s. Crowley rd. In crowley, tx. The contractor exposed the wrong facility, which resulted in boring into an atmos energy 6" poly main. Atmos energy, using squeeze tools and line stoppers, was able to shut down the line at 9:20 am on january 7, 2020. The cost of repairs for this line has exceeded $50,000. The facility was placed back in service on april 9, 2020.
Occurred At 2020-01-06 16:30:00
Year 2020
Report Received Date 2020-02-05 00:00:00
Iyear 2020.0
Report Number 20200018.0
Supplemental Number 34374.0
Report Type Supplemental Final
Operator Id 31348 PHMSA Enforcement
Name Atmos Energy Corporation - Mid-Tex
Operator Street Address 5430 Lbj Freeway Suite 1800
Operator City Name Dallas
Operator State Abbreviation TX
Operator Postal Code 75240
Local Datetime 2020-01-06 16:30:00
Location Street Address E. Main And S. Crowley Rd.
Location City Name Crowley
Location County Name Tarrant
Location State Abbreviation TX
Location Postal Code 76036
Location Latitude 32.57850952 Google Maps OpenStreetMap
Location Longitude -97.35308635 Google Maps OpenStreetMap
Nrc Rpt Datetime 2020-01-07 18:21:00
Nrc Rpt Num 1268177 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 66.6
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2020-01-06 16:30:00
On Site Datetime 2020-01-06 18:00:00
Federal No
Location Type Public Property
Incident Area Type Underground
Incident Area Subtype Under Pavement
Depth Of Cover 132.0
Crossing Yes
Road Crossing Ind Yes
Road Type Bored/drilled
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 2006.0
Pipe Diameter 6.0
Pipe Specification Astm D2513
Pipe Manufacturer Performance
Material Involved Plastic
Plastic Type Polyethylene (Pe)
Plastic Sdr 11.5
Material Pe Pipe Code 2306
Release Type Mechanical Puncture
Puncture Axial 2.0
Puncture Circum 2.0
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 80780.0
Est Cost Emergency 0.0
Est Cost Other 0.0
Est Cost Unintentional Release 300.0
Prpty 81080.0
Commercial Affected 2.0
Industrial Affected 0.0
Residences Affected 0.0
Accident Psig 25.0
Normal Psig 25.0
Mop Psig 60.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype City Street
Excavator Type Contractor
Excavator Equipment Boring
Work Performed Natural Gas
One Call Notified Ind Yes
One Call Ticket Num 2050249433
One Call Center Name Texas811
Locator Type Contract Locator
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 1.0
Root Cause Category Excavation Issue
Root Cause Type Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name T*** M*****
Preparer Title Operations Supervisor
Preparer Email T**********@a**********.com
Preparer Telephone 817-207-2870
Authorizer Name M**** S*****
Authorizer Title Vice President Technical Services
Authorizer Telephone 214-206-2033
Authorizer Email M***********@a**********.com
Narrative At 4:30 pm on january 6, 2020, a 2nd party contractor was boring a hole at the intersection of e. Main st. And s. Crowley rd. In crowley, tx. The contractor exposed the wrong facility, which resulted in boring into an atmos energy 6" poly main. Atmos energy, using squeeze tools and line stoppers, was able to shut down the line at 9:20 am on january 7, 2020. The cost of repairs for this line has exceeded $50,000. The facility was placed back in service on april 9, 2020.

All rights reserved. Copyright © by ClearPHMSA