HL incident on 2019-10-29 — TX

Operator
Rose Rock Midstream L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$23,676
Incident datetime
2019-10-29 07:20
Report number
Location
TX
Narrative
Rose rock employee arrived at hudson station to do a station check on the morning of 10/29/2019 at 7:00. He drove up to the pumps and noticed oil on the ground and contacted the control center and his supervisor to notify them of the release. The control center shut the pumps down and the rose rock employee performed a lock-out of the upstream and downstream valves to isolate the release. The release was contained on rose rock property and did not impact water.
Detailed record list
Report Received Date
2019-11-25 00:00:00
Iyear
2019
Report Number
20190353
Supplemental Number
33133
Report Type
Supplemental Final
Operator Id
Name
Rose Rock Midstream L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2019-10-29 07:20:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
5
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2019-10-29 07:20:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-10-29 07:20:00
Restart Datetime
2019-10-30 16:30:00
On Site Datetime
2019-10-29 07:20:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Hudson Station
Segment Name
Station Piping
Onshore State Abbreviation
Ks
Onshore Postal Code
67578
Onshore City Name
Not Within A Municipality
Onshore County Name
Stafford
Designated Location
Milepost/valve Station
Designated Name
Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12
Pipe Wall Thickness
0.375
Pipe Smys
42000
Pipe Specification
Api 5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Pangan Group Chendu Iron And Steel Co
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
2012
Manufactured Year
2004
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
235
Est Cost Prop Damage
23676
Est Cost Emergency
7056
Est Cost Environmental
5900
Est Cost Other
1000
Est Cost Other Details
Estimated $1000 For Microbial Corrosion Analysis.
Prpty
37867
Accident Psig
12
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Corrosion related leak on low pressure tank suction piping.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
L*** V******
Preparer Title
Compliance Manager
Preparer Email
L*******@s*******.com
Preparer Telephone
9185248109
Prepared Date
2019-12-30 00:00:00
Authorizer Name
D**** Y****
Authorizer Telephone
6202686004
Authorizer Title
District Manager
Authorizer Email
D******@s*******.com
Narrative
Rose rock employee arrived at hudson station to do a station check on the morning of 10/29/2019 at 7:00. He drove up to the pumps and noticed oil on the ground and contacted the control center and his supervisor to notify them of the release. The control center shut the pumps down and the rose rock employee performed a lock-out of the upstream and downstream valves to isolate the release. The release was contained on rose rock property and did not impact water.
Report Received Date 2019-11-25 00:00:00
Iyear 2019
Report Number 20190353
Supplemental Number 33133
Report Type Supplemental Final
Operator Id 31476 PHMSA Enforcement
Name Rose Rock Midstream L.p.
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2019-10-29 07:20:00
Location Latitude 38.09338 Google Maps OpenStreetMap
Location Longitude -98.58172 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 5
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2019-10-29 07:20:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2019-10-29 07:20:00
Restart Datetime 2019-10-30 16:30:00
On Site Datetime 2019-10-29 07:20:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Hudson Station
Segment Name Station Piping
Onshore State Abbreviation Ks
Onshore Postal Code 67578
Onshore City Name Not Within A Municipality
Onshore County Name Stafford
Designated Location Milepost/valve Station
Designated Name Station
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 36
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 12
Pipe Wall Thickness 0.375
Pipe Smys 42000
Pipe Specification Api 5l
Pipe Seam Type Seamless
Pipe Manufacturer Pangan Group Chendu Iron And Steel Co
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Installation Year 2012
Manufactured Year 2004
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 235
Est Cost Prop Damage 23676
Est Cost Emergency 7056
Est Cost Environmental 5900
Est Cost Other 1000
Est Cost Other Details Estimated $1000 For Microbial Corrosion Analysis.
Prpty 37867
Accident Psig 12
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Corrosion related leak on low pressure tank suction piping.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Yes
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name L*** V******
Preparer Title Compliance Manager
Preparer Email L*******@s*******.com
Preparer Telephone 9185248109
Prepared Date 2019-12-30 00:00:00
Authorizer Name D**** Y****
Authorizer Telephone 6202686004
Authorizer Title District Manager
Authorizer Email D******@s*******.com
Narrative Rose rock employee arrived at hudson station to do a station check on the morning of 10/29/2019 at 7:00. He drove up to the pumps and noticed oil on the ground and contacted the control center and his supervisor to notify them of the release. The control center shut the pumps down and the rose rock employee performed a lock-out of the upstream and downstream valves to isolate the release. The release was contained on rose rock property and did not impact water.

All rights reserved. Copyright © by ClearPHMSA