HL incident on 2019-07-15 — TX
Operator
Anadarko Petroleum Corp
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$30,000
Incident datetime
2019-07-15 17:23
Report number
Location
TX
Narrative
On july 15th 2019 at approximately 7:23 pm, we received a phone call from an individual reporting a spill. This person called the phone number on the pipeline marker. We dispatched personnel to the area and confirmed the leak at approximately 8:45pm. The first valve was closed at 9:00 pm and then the second and final valve was closed at 9:30pm. The area was deemed safe and we contacted our third party clean up crew to come out the following morning to initiate clean up. The next morning the emergency one call was initiated prior to digging. By 10:30am the one call's were cleared and clean up began. This appears to be a pin hole leak on a previously out of service pipeline, so some details requested in this report are not known. We are land-farming the remaining oil under the direction of the wydeq, and these efforts will continue for some time. After discussing with PHMSA's aid team, it was decided that we can count the oil which is being land-farmed under the direction of the wydeq as recovered (part a). Part e questions 2, 3 and 5f: established mop unknown, thus making the determination of exceeding mop and % of smys unknown. The 950 mop number in part e is based on the set point of the relief valve after discussing with PHMSA's aid team.
Detailed record list
Report Received Date
2019-11-22 00:00:00
Iyear
2019
Report Number
20190352
Supplemental Number
36203
Report Type
Supplemental Final
Operator Id
Name
Anadarko Petroleum Corp
Operator Street Address
9950 Woodloch Forest Dr Suite 2800
Operator City Name
The Woodlands
Operator State Abbreviation
TX
Operator Postal Code
77380
Local Datetime
2019-07-15 19:23:00
Location Latitude
41.61568
Location Longitude
-108.38449
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2250
Recovered Bbls
2250
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2019-07-15 17:23:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-07-15 21:30:00
Still Shutdown Ind
Yes
On Site Datetime
2019-07-15 20:45:00
Nrc Rpt Datetime
2019-07-16 10:27:00
Nrc Rpt Num
1252130
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Wamsutter
Segment Name
Trunkline C
Onshore State Abbreviation
Wy
Onshore Postal Code
82901
Onshore City Name
Not Within A Municipality
Onshore County Name
Sweetwater
Designated Location
Milepost/valve Station
Designated Name
A/c Tie In
Federal
Yes
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
60
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6
Pipe Wall Thickness
0.188
Pipe Smys
Unknown
Pipe Specification
Unknown
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
Unknown
Pipe Coating Type
Cold Applied Tape
Installation Year
1962
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
112000
Est Cost Prop Damage
30000
Est Cost Emergency
400
Est Cost Environmental
100000
Est Cost Other
0
Est Cost Other Details
Ongoing Environmental Remediation Costs, Landfarming Remaining Oil
Prpty
242400
Accident Psig
300
Mop Psig
950
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
31680
Internal Inspection Ind
No
Diameter Change Ind
Yes
Unsuitable Mainline Ind
Yes
Tight Mitered Ind
Yes
Other Restrictions Ind
Yes
Extra Thick Wall Ind
Yes
Operation Complications Ind
Yes
Low Op Pressure Ind
Yes
Other Complications Ind
Yes
Inspect Comp Details
Multiple Pipe Dimensions
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No contributing factors from incident review. Controllers cannot control valves or pressure on pipe.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
No
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
B******* M******
Preparer Title
Staff Hse Representative
Preparer Email
B***************@w***************.com
Preparer Telephone
7209296732
Prepared Date
2022-01-05 00:00:00
Authorizer Name
M*** M****
Authorizer Telephone
307-352-3305
Authorizer Title
Field Foreman
Authorizer Email
M*********@w***************.com
Narrative
On july 15th 2019 at approximately 7:23 pm, we received a phone call from an individual reporting a spill. This person called the phone number on the pipeline marker. We dispatched personnel to the area and confirmed the leak at approximately 8:45pm. The first valve was closed at 9:00 pm and then the second and final valve was closed at 9:30pm. The area was deemed safe and we contacted our third party clean up crew to come out the following morning to initiate clean up. The next morning the emergency one call was initiated prior to digging. By 10:30am the one call's were cleared and clean up began. This appears to be a pin hole leak on a previously out of service pipeline, so some details requested in this report are not known. We are land-farming the remaining oil under the direction of the wydeq, and these efforts will continue for some time. After discussing with PHMSA's aid team, it was decided that we can count the oil which is being land-farmed under the direction of the wydeq as recovered (part a). Part e questions 2, 3 and 5f: established mop unknown, thus making the determination of exceeding mop and % of smys unknown. The 950 mop number in part e is based on the set point of the relief valve after discussing with PHMSA's aid team.
| Report Received Date | 2019-11-22 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190352 |
| Supplemental Number | 36203 |
| Report Type | Supplemental Final |
| Operator Id | 473 PHMSA Enforcement |
| Name | Anadarko Petroleum Corp |
| Operator Street Address | 9950 Woodloch Forest Dr Suite 2800 |
| Operator City Name | The Woodlands |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77380 |
| Local Datetime | 2019-07-15 19:23:00 |
| Location Latitude | 41.61568 Google Maps OpenStreetMap |
| Location Longitude | -108.38449 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 2250 |
| Recovered Bbls | 2250 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2019-07-15 17:23:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2019-07-15 21:30:00 |
| Still Shutdown Ind | Yes |
| On Site Datetime | 2019-07-15 20:45:00 |
| Nrc Rpt Datetime | 2019-07-16 10:27:00 |
| Nrc Rpt Num | 1252130 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Wamsutter |
| Segment Name | Trunkline C |
| Onshore State Abbreviation | Wy |
| Onshore Postal Code | 82901 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Sweetwater |
| Designated Location | Milepost/valve Station |
| Designated Name | A/c Tie In |
| Federal | Yes |
| Location Type | Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 60 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 6 |
| Pipe Wall Thickness | 0.188 |
| Pipe Smys | Unknown |
| Pipe Specification | Unknown |
| Pipe Seam Type | Other |
| Pipe Seam Details | Unknown |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Cold Applied Tape |
| Installation Year | 1962 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 112000 |
| Est Cost Prop Damage | 30000 |
| Est Cost Emergency | 400 |
| Est Cost Environmental | 100000 |
| Est Cost Other | 0 |
| Est Cost Other Details | Ongoing Environmental Remediation Costs, Landfarming Remaining Oil |
| Prpty | 242400 |
| Accident Psig | 300 |
| Mop Psig | 950 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 31680 |
| Internal Inspection Ind | No |
| Diameter Change Ind | Yes |
| Unsuitable Mainline Ind | Yes |
| Tight Mitered Ind | Yes |
| Other Restrictions Ind | Yes |
| Extra Thick Wall Ind | Yes |
| Operation Complications Ind | Yes |
| Low Op Pressure Ind | Yes |
| Other Complications Ind | Yes |
| Inspect Comp Details | Multiple Pipe Dimensions |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No contributing factors from incident review. Controllers cannot control valves or pressure on pipe. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Water Acid Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | No |
| Corrosion Lining | No |
| Cleaning Dewatering | No |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | B******* M****** |
| Preparer Title | Staff Hse Representative |
| Preparer Email | B***************@w***************.com |
| Preparer Telephone | 7209296732 |
| Prepared Date | 2022-01-05 00:00:00 |
| Authorizer Name | M*** M**** |
| Authorizer Telephone | 307-352-3305 |
| Authorizer Title | Field Foreman |
| Authorizer Email | M*********@w***************.com |
| Narrative | On july 15th 2019 at approximately 7:23 pm, we received a phone call from an individual reporting a spill. This person called the phone number on the pipeline marker. We dispatched personnel to the area and confirmed the leak at approximately 8:45pm. The first valve was closed at 9:00 pm and then the second and final valve was closed at 9:30pm. The area was deemed safe and we contacted our third party clean up crew to come out the following morning to initiate clean up. The next morning the emergency one call was initiated prior to digging. By 10:30am the one call's were cleared and clean up began. This appears to be a pin hole leak on a previously out of service pipeline, so some details requested in this report are not known. We are land-farming the remaining oil under the direction of the wydeq, and these efforts will continue for some time. After discussing with PHMSA's aid team, it was decided that we can count the oil which is being land-farmed under the direction of the wydeq as recovered (part a). Part e questions 2, 3 and 5f: established mop unknown, thus making the determination of exceeding mop and % of smys unknown. The 950 mop number in part e is based on the set point of the relief valve after discussing with PHMSA's aid team. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA