HL incident on 2019-10-21 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$155,000
Incident datetime
2019-10-21 13:52
Report number
Location
TX
Narrative
At 13:04 central time on 10/21/2019, a third party called about a crude oil leak at enterprise's pasadena delivery station. An enterprise technician responded to the site at 13:52 central time and found crude oil bubbling through rock above an 8" pig trap kicker line. The line was immediately isolated and shutdown. The leaking pipe was removed and associated connections blind flanged. It is estimated that 40 barrels were released. Metallurgical analysis of the failed pipe determined the cause as internal corrosion. To prevent recurrence, a flushing plan will be implemented once the kicker line is reinstalled. Flushing will occur during maintenance pigging. The nrc#1261798 call was made 10/21/2019 at 19:05 central time due to repair costs being determined to exceed $50k. The nrc#1261997 48-hour update call was made 10/23/2019 at 16:56 central time.
Detailed record list
Report Received Date
2019-11-20 00:00:00
Iyear
2019
Report Number
20190345
Supplemental Number
33541
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2019-10-21 13:04:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
40
Recovered Bbls
40
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2019-10-21 13:52:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-10-21 13:18:00
Restart Datetime
2019-10-25 13:00:00
On Site Datetime
2019-10-21 13:52:00
Nrc Rpt Datetime
2019-10-21 19:05:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Pasadena Delivery - Shell
Segment Name
C108
Onshore State Abbreviation
Tx
Onshore Postal Code
77509
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
30
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8
Pipe Wall Thickness
0.322
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Seamless
Pipe Manufacturer
United States Steel
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
2015
Manufactured Year
2013
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
180000
Est Cost Gas Released
2500
Est Cost Prop Damage
155000
Est Cost Emergency
225000
Est Cost Environmental
230000
Est Cost Other
0
Prpty
792500
Accident Psig
496
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
32
Internal Inspection Ind
No
Tight Mitered Ind
Yes
Other Inspection Ind
Yes
Internal Inspection Details
Facility Piping
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Actions of controller did not contribute to the accident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Microbiological Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
R*** T********
Preparer Title
Pipeline Compliance Engineer
Preparer Email
R*********@e****.com
Preparer Telephone
713-381-4659
Prepared Date
2020-03-31 00:00:00
Authorizer Name
S**** D****
Authorizer Telephone
713-381-5585
Authorizer Title
Manager Compliance
Authorizer Email
S******@e****.com
Narrative
At 13:04 central time on 10/21/2019, a third party called about a crude oil leak at enterprise's pasadena delivery station. An enterprise technician responded to the site at 13:52 central time and found crude oil bubbling through rock above an 8" pig trap kicker line. The line was immediately isolated and shutdown. The leaking pipe was removed and associated connections blind flanged. It is estimated that 40 barrels were released. Metallurgical analysis of the failed pipe determined the cause as internal corrosion. To prevent recurrence, a flushing plan will be implemented once the kicker line is reinstalled. Flushing will occur during maintenance pigging. The nrc#1261798 call was made 10/21/2019 at 19:05 central time due to repair costs being determined to exceed $50k. The nrc#1261997 48-hour update call was made 10/23/2019 at 16:56 central time.
Report Received Date 2019-11-20 00:00:00
Iyear 2019
Report Number 20190345
Supplemental Number 33541
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2019-10-21 13:04:00
Location Latitude 29.70691 Google Maps OpenStreetMap
Location Longitude -95.2232 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 40
Recovered Bbls 40
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Public
Incident Identified Datetime 2019-10-21 13:52:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2019-10-21 13:18:00
Restart Datetime 2019-10-25 13:00:00
On Site Datetime 2019-10-21 13:52:00
Nrc Rpt Datetime 2019-10-21 19:05:00
Nrc Rpt Num 1261798 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Pasadena Delivery - Shell
Segment Name C108
Onshore State Abbreviation Tx
Onshore Postal Code 77509
Onshore City Name Pasadena
Onshore County Name Harris
Designated Location Milepost/valve Station
Designated Name 0
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 30
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8
Pipe Wall Thickness 0.322
Pipe Smys 52000
Pipe Specification Api 5l
Pipe Seam Type Seamless
Pipe Manufacturer United States Steel
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Installation Year 2015
Manufactured Year 2013
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 180000
Est Cost Gas Released 2500
Est Cost Prop Damage 155000
Est Cost Emergency 225000
Est Cost Environmental 230000
Est Cost Other 0
Prpty 792500
Accident Psig 496
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 32
Internal Inspection Ind No
Tight Mitered Ind Yes
Other Inspection Ind Yes
Internal Inspection Details Facility Piping
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind Yes
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Actions of controller did not contribute to the accident.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Water Acid Ind Yes
Int Microbiological Ind Yes
Int Metallurgical Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name R*** T********
Preparer Title Pipeline Compliance Engineer
Preparer Email R*********@e****.com
Preparer Telephone 713-381-4659
Prepared Date 2020-03-31 00:00:00
Authorizer Name S**** D****
Authorizer Telephone 713-381-5585
Authorizer Title Manager Compliance
Authorizer Email S******@e****.com
Narrative At 13:04 central time on 10/21/2019, a third party called about a crude oil leak at enterprise's pasadena delivery station. An enterprise technician responded to the site at 13:52 central time and found crude oil bubbling through rock above an 8" pig trap kicker line. The line was immediately isolated and shutdown. The leaking pipe was removed and associated connections blind flanged. It is estimated that 40 barrels were released. Metallurgical analysis of the failed pipe determined the cause as internal corrosion. To prevent recurrence, a flushing plan will be implemented once the kicker line is reinstalled. Flushing will occur during maintenance pigging. The nrc#1261798 call was made 10/21/2019 at 19:05 central time due to repair costs being determined to exceed $50k. The nrc#1261997 48-hour update call was made 10/23/2019 at 16:56 central time.

All rights reserved. Copyright © by ClearPHMSA