Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2019-08-23 — CA
Operator
Paramount Pipeline Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$95,500
Incident datetime
2019-08-23 08:54
Report number
Location
CA
Narrative
Line 3 was idled in water with corrosion inhibitor. The line has not been used for multiple years. It took a month after initial release for chevron, paramount pipelines and crimson to identify 3 lines in the area as the drawings showed conflicting ownership as well as all three lines being electrically bonded, mostly like to prevent cathodic protection interference. This made identifying the lines difficult. Once paramount pipeline took over ownership of the dig site, the release site was discovered and a temporary clamp placed on the pinhole leak. The was no external corrosion at the release site, which indicated an internal corrosion anomaly. The line was inspected by applus+ rtd. They performed ultrasonic thickness testing at 12 inch intervals in a 6 inch band. All indications point to localized internal corrosion due to a mix of water, crude and corrosion inhibitor which would result in microbiologically influence corrosion as no biocide was put in the line. The line will be repaired with a full encirclement b-sleeve, hydrotested to 675 psi and then maintenance pigged to remove all water. Lastly the line will be placed in nitrogen.
Detailed record list
Report Received Date
2019-11-14 00:00:00
Iyear
2019
Report Number
20190339
Supplemental Number
32943
Report Type
Original Final
Operator Id
39837
Name
Paramount Pipeline Llc
Operator Street Address
14700 Downey Ave Suite 100
Operator City Name
Paramount
Operator State Abbreviation
CA
Operator Postal Code
90723
Local Datetime
2019-09-23 12:29:00
Location Latitude
33.8045274
Location Longitude
-118.2210989
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1
Recovered Bbls
1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Emergency Responder
Incident Identified Datetime
2019-08-23 08:54:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Line Was Idled Filled With Water And Corrosion Inhibitor
On Site Datetime
2019-08-23 09:34:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Line 3
Segment Name
Csfm 1192
Onshore State Abbreviation
Ca
Onshore Postal Code
90810
Onshore City Name
Long Beach
Onshore County Name
Los Angeles County
Designated Location
Milepost/valve Station
Designated Name
Ictf Manifold
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
72
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.28
Pipe Smys
Unknown
Pipe Specification
Api 5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Extruded Polyehylene
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
95500
Est Cost Emergency
30000
Est Cost Environmental
10000
Est Cost Other
0
Est Cost Other Details
The Initial Response Was $40,000. Repairs Will Be $95,500.
Prpty
135500
Accident Psig
25
Mop Psig
748
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
6529
Internal Inspection Ind
No
Diameter Change Ind
Yes
Unsuitable Mainline Ind
Yes
Tight Mitered Ind
Yes
Other Restrictions Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
No
Corrosion Coupons
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2014
Hydrtst Most Rcnt Pressure
955
Direct Asmnt Conducted
Yes, And An Investigative Dig Was Cunducted At The Point Of The Accident
Direct Asmnt At Pnt Accdnt Yr
2019
Non Destructive Exam Ind
Yes
Exm Radiography Rcnt Year
2019
Exm Radiography Rcnt Ind
Yes
Preparer Name
J****** E****
Preparer Title
Manager Pipeline Compliance
Preparer Email
J*****@w**********.net
Preparer Telephone
562-788-0555
Prepared Date
2019-11-14 00:00:00
Authorizer Name
J****** E****
Authorizer Telephone
562-788-0555
Authorizer Title
Manager Pipeline Compliance
Authorizer Email
J*****@w**********.net
Narrative
Line 3 was idled in water with corrosion inhibitor. The line has not been used for multiple years. It took a month after initial release for chevron, paramount pipelines and crimson to identify 3 lines in the area as the drawings showed conflicting ownership as well as all three lines being electrically bonded, mostly like to prevent cathodic protection interference. This made identifying the lines difficult. Once paramount pipeline took over ownership of the dig site, the release site was discovered and a temporary clamp placed on the pinhole leak. The was no external corrosion at the release site, which indicated an internal corrosion anomaly. The line was inspected by applus+ rtd. They performed ultrasonic thickness testing at 12 inch intervals in a 6 inch band. All indications point to localized internal corrosion due to a mix of water, crude and corrosion inhibitor which would result in microbiologically influence corrosion as no biocide was put in the line. The line will be repaired with a full encirclement b-sleeve, hydrotested to 675 psi and then maintenance pigged to remove all water. Lastly the line will be placed in nitrogen.
| Report Received Date | 2019-11-14 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190339 |
| Supplemental Number | 32943 |
| Report Type | Original Final |
| Operator Id | 39837 PHMSA Enforcement |
| Name | Paramount Pipeline Llc |
| Operator Street Address | 14700 Downey Ave Suite 100 |
| Operator City Name | Paramount |
| Operator State Abbreviation | CA |
| Operator Postal Code | 90723 |
| Local Datetime | 2019-09-23 12:29:00 |
| Location Latitude | 33.8045274 Google Maps OpenStreetMap |
| Location Longitude | -118.2210989 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 1 |
| Recovered Bbls | 1 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Emergency Responder |
| Incident Identified Datetime | 2019-08-23 08:54:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | The Line Was Idled Filled With Water And Corrosion Inhibitor |
| On Site Datetime | 2019-08-23 09:34:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Line 3 |
| Segment Name | Csfm 1192 |
| Onshore State Abbreviation | Ca |
| Onshore Postal Code | 90810 |
| Onshore City Name | Long Beach |
| Onshore County Name | Los Angeles County |
| Designated Location | Milepost/valve Station |
| Designated Name | Ictf Manifold |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 72 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.28 |
| Pipe Smys | Unknown |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Extruded Polyehylene |
| Installation Year | Unknown |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 95500 |
| Est Cost Emergency | 30000 |
| Est Cost Environmental | 10000 |
| Est Cost Other | 0 |
| Est Cost Other Details | The Initial Response Was $40,000. Repairs Will Be $95,500. |
| Prpty | 135500 |
| Accident Psig | 25 |
| Mop Psig | 748 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 6529 |
| Internal Inspection Ind | No |
| Diameter Change Ind | Yes |
| Unsuitable Mainline Ind | Yes |
| Tight Mitered Ind | Yes |
| Other Restrictions Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the accident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Microbiological Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | No |
| Corrosion Coupons | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2014 |
| Hydrtst Most Rcnt Pressure | 955 |
| Direct Asmnt Conducted | Yes, And An Investigative Dig Was Cunducted At The Point Of The Accident |
| Direct Asmnt At Pnt Accdnt Yr | 2019 |
| Non Destructive Exam Ind | Yes |
| Exm Radiography Rcnt Year | 2019 |
| Exm Radiography Rcnt Ind | Yes |
| Preparer Name | J****** E**** |
| Preparer Title | Manager Pipeline Compliance |
| Preparer Email | J*****@w**********.net |
| Preparer Telephone | 562-788-0555 |
| Prepared Date | 2019-11-14 00:00:00 |
| Authorizer Name | J****** E**** |
| Authorizer Telephone | 562-788-0555 |
| Authorizer Title | Manager Pipeline Compliance |
| Authorizer Email | J*****@w**********.net |
| Narrative | Line 3 was idled in water with corrosion inhibitor. The line has not been used for multiple years. It took a month after initial release for chevron, paramount pipelines and crimson to identify 3 lines in the area as the drawings showed conflicting ownership as well as all three lines being electrically bonded, mostly like to prevent cathodic protection interference. This made identifying the lines difficult. Once paramount pipeline took over ownership of the dig site, the release site was discovered and a temporary clamp placed on the pinhole leak. The was no external corrosion at the release site, which indicated an internal corrosion anomaly. The line was inspected by applus+ rtd. They performed ultrasonic thickness testing at 12 inch intervals in a 6 inch band. All indications point to localized internal corrosion due to a mix of water, crude and corrosion inhibitor which would result in microbiologically influence corrosion as no biocide was put in the line. The line will be repaired with a full encirclement b-sleeve, hydrotested to 675 psi and then maintenance pigged to remove all water. Lastly the line will be placed in nitrogen. |