Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2019-10-15 — IL
Operator
Bp Pipeline (North America) Inc.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$832,471
Incident datetime
2019-10-15 09:30
Report number
Location
IL
Narrative
On october 15, 2019, a company employee was conducting a routine facility inspection at the monticello station on the chicap pipeline system. The employee identified free standing crude oil in the pump manifold area around 09:30 and the line was immediately shut down. The site was excavated and a tightness test of the station piping was conducted. A leak was found on the two inch drain line near the low point of the system. The two inch line is a drain line to the sump off of a 16 inch by-pass line for the station pumps. A total of ten feet of pipe was replaced to repair the leak at convenient tie-in and isolation points (six feet of 2" and four feet of 16"). The leak was due to internal corrosion. The mitigating actions to prevent recurrence are to apply learnings to supplement dead leg management and the facility inspection program.
Detailed record list
Report Received Date
2019-11-14 00:00:00
Iyear
2019
Report Number
20190336
Supplemental Number
33256
Report Type
Supplemental Final
Operator Id
31189
Name
Bp Pipeline (North America) Inc.
Operator Street Address
30 S. Wacker Drive
Operator City Name
Chicago
Operator State Abbreviation
IL
Operator Postal Code
60606
Local Datetime
2019-10-15 09:30:00
Location Latitude
40.1054834
Location Longitude
-88.577522
Commodity Released Type
Crude Oil
Unintentional Release Bbls
30
Recovered Bbls
30
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2019-10-15 09:30:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-10-15 09:30:00
Restart Datetime
2019-10-20 17:20:00
On Site Datetime
2019-10-15 09:30:00
Nrc Rpt Datetime
2019-10-15 10:18:00
Nrc Rpt Num
1261158
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Monticello Station
Segment Name
Chicap System
Onshore State Abbreviation
Il
Onshore Postal Code
61856
Onshore City Name
Monticello
Onshore County Name
Piatt
Designated Location
Milepost/valve Station
Designated Name
Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
120
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
2
Pipe Wall Thickness
Unknown
Pipe Smys
Unknown
Pipe Specification
Unknown
Pipe Seam Type
Other
Pipe Seam Details
Unknown At This Time
Pipe Manufacturer
Unknown
Pipe Coating Type
Other
Pipe Coating Details
Unknown At This Time
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1800
Est Cost Prop Damage
832471
Est Cost Emergency
484442
Est Cost Environmental
0
Est Cost Other
0
Prpty
1318713
Accident Psig
330
Mop Psig
641
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The controller(s) actions did not cause or contribute to the leak.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Other Corrosion Ind
Yes
Int Corrosion Type Details
Not Known At This Time.
Int Other Basis Ind
Yes
Int Corrosion Basis Details
Not Known At This Time.
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
No
Corrosion Coupons
No
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
J*** N*******
Preparer Title
Dot Compliance Advisor
Preparer Email
J************@b*.com
Preparer Telephone
(872) 245-2320
Prepared Date
2020-01-31 00:00:00
Authorizer Name
D*** B*****
Authorizer Telephone
(331) 809-3002
Authorizer Title
Compliance Manager
Authorizer Email
D***********@b*.com
Narrative
On october 15, 2019, a company employee was conducting a routine facility inspection at the monticello station on the chicap pipeline system. The employee identified free standing crude oil in the pump manifold area around 09:30 and the line was immediately shut down. The site was excavated and a tightness test of the station piping was conducted. A leak was found on the two inch drain line near the low point of the system. The two inch line is a drain line to the sump off of a 16 inch by-pass line for the station pumps. A total of ten feet of pipe was replaced to repair the leak at convenient tie-in and isolation points (six feet of 2" and four feet of 16"). The leak was due to internal corrosion. The mitigating actions to prevent recurrence are to apply learnings to supplement dead leg management and the facility inspection program.
| Report Received Date | 2019-11-14 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190336 |
| Supplemental Number | 33256 |
| Report Type | Supplemental Final |
| Operator Id | 31189 PHMSA Enforcement |
| Name | Bp Pipeline (North America) Inc. |
| Operator Street Address | 30 S. Wacker Drive |
| Operator City Name | Chicago |
| Operator State Abbreviation | IL |
| Operator Postal Code | 60606 |
| Local Datetime | 2019-10-15 09:30:00 |
| Location Latitude | 40.1054834 Google Maps OpenStreetMap |
| Location Longitude | -88.577522 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 30 |
| Recovered Bbls | 30 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2019-10-15 09:30:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2019-10-15 09:30:00 |
| Restart Datetime | 2019-10-20 17:20:00 |
| On Site Datetime | 2019-10-15 09:30:00 |
| Nrc Rpt Datetime | 2019-10-15 10:18:00 |
| Nrc Rpt Num | 1261158 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Monticello Station |
| Segment Name | Chicap System |
| Onshore State Abbreviation | Il |
| Onshore Postal Code | 61856 |
| Onshore City Name | Monticello |
| Onshore County Name | Piatt |
| Designated Location | Milepost/valve Station |
| Designated Name | Station |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 120 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 2 |
| Pipe Wall Thickness | Unknown |
| Pipe Smys | Unknown |
| Pipe Specification | Unknown |
| Pipe Seam Type | Other |
| Pipe Seam Details | Unknown At This Time |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Other |
| Pipe Coating Details | Unknown At This Time |
| Installation Year | Unknown |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1800 |
| Est Cost Prop Damage | 832471 |
| Est Cost Emergency | 484442 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 1318713 |
| Accident Psig | 330 |
| Mop Psig | 641 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The controller(s) actions did not cause or contribute to the leak. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Other Corrosion Ind | Yes |
| Int Corrosion Type Details | Not Known At This Time. |
| Int Other Basis Ind | Yes |
| Int Corrosion Basis Details | Not Known At This Time. |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | No |
| Corrosion Lining | No |
| Cleaning Dewatering | No |
| Corrosion Coupons | No |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | J*** N******* |
| Preparer Title | Dot Compliance Advisor |
| Preparer Email | J************@b*.com |
| Preparer Telephone | (872) 245-2320 |
| Prepared Date | 2020-01-31 00:00:00 |
| Authorizer Name | D*** B***** |
| Authorizer Telephone | (331) 809-3002 |
| Authorizer Title | Compliance Manager |
| Authorizer Email | D***********@b*.com |
| Narrative | On october 15, 2019, a company employee was conducting a routine facility inspection at the monticello station on the chicap pipeline system. The employee identified free standing crude oil in the pump manifold area around 09:30 and the line was immediately shut down. The site was excavated and a tightness test of the station piping was conducted. A leak was found on the two inch drain line near the low point of the system. The two inch line is a drain line to the sump off of a 16 inch by-pass line for the station pumps. A total of ten feet of pipe was replaced to repair the leak at convenient tie-in and isolation points (six feet of 2" and four feet of 16"). The leak was due to internal corrosion. The mitigating actions to prevent recurrence are to apply learnings to supplement dead leg management and the facility inspection program. |