HL incident on 2019-10-03 — TX

Operator
Delek Crude Logistics, Llc.
Cause
Excavation Issue
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$100,000
Incident datetime
2019-10-03 15:11
Report number
Location
TX
Narrative
On 10/3/19 a delek aerial patrol reported the potential presence of free product in the pipeline row between sulfur springs and greenville, tx. At the time of the routine aerial survey, the pipeline was being filled with diesel fuel following the recent completion of repairs on portions of the pipeline at locations identified in an earlier ili assessment in 2017. The pipeline filling operations were shutdown, mov's closed, and personnel dispatched to investigate and, upon confirmation of a release, to further isolate the line section. The failure site was located, the release was confirmed and an area near the observed release was excavated to expose the failed segment and a clamp was installed. The failed section of pipe was removed and sent to a laboratory for metallurgical analysis. The lab identified the failure cause to be excavation damage. The failed pipe section was replaced with new pipe and the complete pipeline system subjected to a hydrotest.
Detailed record list
Report Received Date
2019-11-02 00:00:00
Iyear
2019
Report Number
20190331
Supplemental Number
34629
Report Type
Supplemental Final
Operator Id
Name
Delek Crude Logistics, Llc.
Operator Street Address
5850 Granite Parkway #450
Operator City Name
Plano
Operator State Abbreviation
TX
Operator Postal Code
75024
Local Datetime
2019-10-03 15:11:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
11437
Recovered Bbls
9056
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Air Patrol
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2019-10-03 15:11:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-10-03 13:50:00
Restart Datetime
2020-03-17 07:43:00
On Site Datetime
2019-10-03 15:11:00
Nrc Rpt Datetime
2019-10-03 16:04:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Greenville To Mt. Pleasant 6"
Segment Name
Greenville To Mt. Pleasant
Onshore State Abbreviation
Tx
Onshore Postal Code
75433
Onshore City Name
Not Within A Municipality
Onshore County Name
Hopkins
Designated Location
Milepost/valve Station
Designated Name
20.8
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6
Pipe Wall Thickness
0.156
Pipe Smys
42000
Pipe Specification
5l
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Lone Star
Pipe Coating Type
Cold Applied Tape
Installation Year
1961
Manufactured Year
1961
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
8
Puncture Circum
3
Wildlife Impact Ind
Yes
Fish Aquatic Impact Ind
Yes
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Surface Water Remed Ind
Yes
Soil Remed Ind
Yes
Vegetation Remed Ind
Yes
Wildlife Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
9000
Rel Water Name
East Fork Of Turkey Creek
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
5000000
Est Cost Gas Released
850000
Est Cost Prop Damage
100000
Est Cost Emergency
600000
Est Cost Environmental
850000
Est Cost Other
0
Prpty
7400000
Accident Psig
73
Mop Psig
384
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
38913
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type
Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt
No
Private Row Ind
Yes
Private Subtype
Private Landowner
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
1974873516
One Call Center Name
811
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
3978
Root Cause Category
Excavation Issue
Root Cause Type
Improper Backfilling Practices
Preparer Name
M****** S******
Preparer Title
Director Regulatory Compliance And Row
Preparer Email
M**************@d*************.com
Preparer Telephone
6306498016
Prepared Date
2020-12-16 00:00:00
Authorizer Name
M****** S******
Authorizer Telephone
6306498016
Authorizer Title
Director Regulatory Compliance And Row Management
Authorizer Email
M**************@d*************.com
Narrative
On 10/3/19 a delek aerial patrol reported the potential presence of free product in the pipeline row between sulfur springs and greenville, tx. At the time of the routine aerial survey, the pipeline was being filled with diesel fuel following the recent completion of repairs on portions of the pipeline at locations identified in an earlier ili assessment in 2017. The pipeline filling operations were shutdown, mov's closed, and personnel dispatched to investigate and, upon confirmation of a release, to further isolate the line section. The failure site was located, the release was confirmed and an area near the observed release was excavated to expose the failed segment and a clamp was installed. The failed section of pipe was removed and sent to a laboratory for metallurgical analysis. The lab identified the failure cause to be excavation damage. The failed pipe section was replaced with new pipe and the complete pipeline system subjected to a hydrotest.
Report Received Date 2019-11-02 00:00:00
Iyear 2019
Report Number 20190331
Supplemental Number 34629
Report Type Supplemental Final
Operator Id 26061 PHMSA Enforcement
Name Delek Crude Logistics, Llc.
Operator Street Address 5850 Granite Parkway #450
Operator City Name Plano
Operator State Abbreviation TX
Operator Postal Code 75024
Local Datetime 2019-10-03 15:11:00
Location Latitude 33.06677 Google Maps OpenStreetMap
Location Longitude -95.856941 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 11437
Recovered Bbls 9056
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Air Patrol
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2019-10-03 15:11:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2019-10-03 13:50:00
Restart Datetime 2020-03-17 07:43:00
On Site Datetime 2019-10-03 15:11:00
Nrc Rpt Datetime 2019-10-03 16:04:00
Nrc Rpt Num 1260166 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Greenville To Mt. Pleasant 6"
Segment Name Greenville To Mt. Pleasant
Onshore State Abbreviation Tx
Onshore Postal Code 75433
Onshore City Name Not Within A Municipality
Onshore County Name Hopkins
Designated Location Milepost/valve Station
Designated Name 20.8
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 36
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 6
Pipe Wall Thickness 0.156
Pipe Smys 42000
Pipe Specification 5l
Pipe Seam Type Erw - Low Frequency
Pipe Manufacturer Lone Star
Pipe Coating Type Cold Applied Tape
Installation Year 1961
Manufactured Year 1961
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 8
Puncture Circum 3
Wildlife Impact Ind Yes
Fish Aquatic Impact Ind Yes
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Surface Water Remed Ind Yes
Soil Remed Ind Yes
Vegetation Remed Ind Yes
Wildlife Remed Ind Yes
Water Contam Ind Yes
Surface Contam Ind Yes
Amount Released 9000
Rel Water Name East Fork Of Turkey Creek
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 5000000
Est Cost Gas Released 850000
Est Cost Prop Damage 100000
Est Cost Emergency 600000
Est Cost Environmental 850000
Est Cost Other 0
Prpty 7400000
Accident Psig 73
Mop Psig 384
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 38913
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt No
Private Row Ind Yes
Private Subtype Private Landowner
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Liquid Pipeline
One Call Notified Ind Yes
One Call Ticket Num 1974873516
One Call Center Name 811
Locator Type Utility Owner
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 3978
Root Cause Category Excavation Issue
Root Cause Type Improper Backfilling Practices
Preparer Name M****** S******
Preparer Title Director Regulatory Compliance And Row
Preparer Email M**************@d*************.com
Preparer Telephone 6306498016
Prepared Date 2020-12-16 00:00:00
Authorizer Name M****** S******
Authorizer Telephone 6306498016
Authorizer Title Director Regulatory Compliance And Row Management
Authorizer Email M**************@d*************.com
Narrative On 10/3/19 a delek aerial patrol reported the potential presence of free product in the pipeline row between sulfur springs and greenville, tx. At the time of the routine aerial survey, the pipeline was being filled with diesel fuel following the recent completion of repairs on portions of the pipeline at locations identified in an earlier ili assessment in 2017. The pipeline filling operations were shutdown, mov's closed, and personnel dispatched to investigate and, upon confirmation of a release, to further isolate the line section. The failure site was located, the release was confirmed and an area near the observed release was excavated to expose the failed segment and a clamp was installed. The failed section of pipe was removed and sent to a laboratory for metallurgical analysis. The lab identified the failure cause to be excavation damage. The failed pipe section was replaced with new pipe and the complete pipeline system subjected to a hydrotest.

All rights reserved. Copyright © by ClearPHMSA