Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2019-09-17 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Other Outside Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2019-09-17 09:55
Report number
Location
OK
Narrative
While preparing to pour a concrete pipe support footing near tank 2504 at the colorado city terminal, the contractor's concrete chute was not pinned in place which resulted in the chute swinging loose and contacting the 1" piping for a thermal relief system. The contact resulted in a crack at the threaded fitting on the upstream isolation valve on the thermal relief system. Local operations personnel were notified and the release was stopped by closing the isolation valve on the thermal relief system. Cleanup activities were initiated and impacted gravel and dirt were collected and containerized for proper disposal. The piping was replaced by the contractor. Safety discussions were conducted with the contractor on checking and following proper equipment procedures.
Detailed record list
Report Received Date
2019-10-17 00:00:00
Iyear
2019
Report Number
20190315
Supplemental Number
32840
Report Type
Original Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2019-09-17 09:55:00
Location Latitude
32.530162
Location Longitude
-100.849262
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.36
Recovered Bbls
0.36
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2019-09-17 09:55:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Release Location Was Isolated From Facility Operations
On Site Datetime
2019-09-17 09:56:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Colorado City
Segment Name
Sta. No. 850
Onshore State Abbreviation
Tx
Onshore Postal Code
79526
Onshore City Name
Not Within A Municipality
Onshore County Name
Scurry
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
2017
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Environmental
1000
Est Cost Other
0
Prpty
1000
Accident Psig
15
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The accident was not associated with the mainline operations; therefore, was not controlled by ops control
Employee Drug Test Ind
No
Contractor Drug Test Ind
Yes
Num Contractors Tested
2
Num Contractors Failed
0
Cause
Other Outside Force Damage
Cause Details
Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Outside Force Type
Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Vehicle Subtype
Operator's Contractor
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
918-574-7327
Preparer Fax
918-574-7376
Prepared Date
2019-10-17 00:00:00
Authorizer Name
S**** H******
Authorizer Telephone
918-574-7173
Authorizer Title
Supervisor Integrity Management
Authorizer Email
S************@m*********.com
Narrative
While preparing to pour a concrete pipe support footing near tank 2504 at the colorado city terminal, the contractor's concrete chute was not pinned in place which resulted in the chute swinging loose and contacting the 1" piping for a thermal relief system. The contact resulted in a crack at the threaded fitting on the upstream isolation valve on the thermal relief system. Local operations personnel were notified and the release was stopped by closing the isolation valve on the thermal relief system. Cleanup activities were initiated and impacted gravel and dirt were collected and containerized for proper disposal. The piping was replaced by the contractor. Safety discussions were conducted with the contractor on checking and following proper equipment procedures.
| Report Received Date | 2019-10-17 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190315 |
| Supplemental Number | 32840 |
| Report Type | Original Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2019-09-17 09:55:00 |
| Location Latitude | 32.530162 Google Maps OpenStreetMap |
| Location Longitude | -100.849262 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.36 |
| Recovered Bbls | 0.36 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2019-09-17 09:55:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Release Location Was Isolated From Facility Operations |
| On Site Datetime | 2019-09-17 09:56:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Colorado City |
| Segment Name | Sta. No. 850 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79526 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Scurry |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Auxiliary Piping (E.g. Drain Lines) |
| Installation Year | 2017 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 1000 |
| Est Cost Other | 0 |
| Prpty | 1000 |
| Accident Psig | 15 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The accident was not associated with the mainline operations; therefore, was not controlled by ops control |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | Yes |
| Num Contractors Tested | 2 |
| Num Contractors Failed | 0 |
| Cause | Other Outside Force Damage |
| Cause Details | Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation |
| Outside Force Type | Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation |
| Vehicle Subtype | Operator's Contractor |
| Preparer Name | S****** L****** |
| Preparer Title | Ai Analyst |
| Preparer Email | S**************@m*********.com |
| Preparer Telephone | 918-574-7327 |
| Preparer Fax | 918-574-7376 |
| Prepared Date | 2019-10-17 00:00:00 |
| Authorizer Name | S**** H****** |
| Authorizer Telephone | 918-574-7173 |
| Authorizer Title | Supervisor Integrity Management |
| Authorizer Email | S************@m*********.com |
| Narrative | While preparing to pour a concrete pipe support footing near tank 2504 at the colorado city terminal, the contractor's concrete chute was not pinned in place which resulted in the chute swinging loose and contacting the 1" piping for a thermal relief system. The contact resulted in a crack at the threaded fitting on the upstream isolation valve on the thermal relief system. Local operations personnel were notified and the release was stopped by closing the isolation valve on the thermal relief system. Cleanup activities were initiated and impacted gravel and dirt were collected and containerized for proper disposal. The piping was replaced by the contractor. Safety discussions were conducted with the contractor on checking and following proper equipment procedures. |