HL incident on 2019-08-21 — TX

Operator
Plains Pipeline, L.p.
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$450
Incident datetime
2019-08-21 10:58
Report number
Location
TX
Narrative
Approximately 0.5 barrels of crude oil were released within facility boundaries at ingleside station. Employees were onsite on the date and time of the release and immediately identified that a release had begun. Equipment failure in part g was selected due to the swage failing as a result of high-cycle reverse bending fatigue, as determined by third party analysis. To prevent future releases, paa removed and replaced 4 of 6 swages with swage lock fittings at the station as a precautionary measure, and the swage that failed (and an additional swage) were removed and plugged.
Detailed record list
Report Received Date
2019-09-20 00:00:00
Iyear
2019
Report Number
20190294
Supplemental Number
32735
Report Type
Original Final
Operator Id
Name
Plains Pipeline, L.p.
Operator Street Address
333 Clay Street, Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2019-08-21 10:58:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.5
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2019-08-21 10:58:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-08-21 11:09:00
Restart Datetime
2019-08-21 13:22:00
On Site Datetime
2019-08-21 10:58:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Ingleside
Segment Name
Pump Station Piping
Onshore State Abbreviation
Tx
Onshore Postal Code
78362
Onshore City Name
Ingleside
Onshore County Name
San Patricio
Designated Location
Milepost/valve Station
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
2019
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
27
Est Cost Prop Damage
450
Est Cost Emergency
2000
Est Cost Environmental
0
Est Cost Other
0
Prpty
2477
Accident Psig
540
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind
Yes
Invest No Schedule Ind Details
Scada Did Not Sound Any Alarms Associated With The Release.
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Threaded Fitting
Additional Vibration Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
High-Cycle Reverse Bending Fatigue
Preparer Name
N****** G*******
Preparer Title
Erc Compliance Speciliast
Preparer Email
N*********@p****.com
Preparer Telephone
7136464376
Prepared Date
2019-09-20 00:00:00
Authorizer Name
N***** G*****
Authorizer Telephone
7136464336
Authorizer Title
Erc Mgr Director
Authorizer Email
N******@p****.com
Narrative
Approximately 0.5 barrels of crude oil were released within facility boundaries at ingleside station. Employees were onsite on the date and time of the release and immediately identified that a release had begun. Equipment failure in part g was selected due to the swage failing as a result of high-cycle reverse bending fatigue, as determined by third party analysis. To prevent future releases, paa removed and replaced 4 of 6 swages with swage lock fittings at the station as a precautionary measure, and the swage that failed (and an additional swage) were removed and plugged.
Report Received Date 2019-09-20 00:00:00
Iyear 2019
Report Number 20190294
Supplemental Number 32735
Report Type Original Final
Operator Id 300 PHMSA Enforcement
Name Plains Pipeline, L.p.
Operator Street Address 333 Clay Street, Suite 1900
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2019-08-21 10:58:00
Location Latitude 27.8298459 Google Maps OpenStreetMap
Location Longitude -97.1975004 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.5
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2019-08-21 10:58:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2019-08-21 11:09:00
Restart Datetime 2019-08-21 13:22:00
On Site Datetime 2019-08-21 10:58:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Ingleside
Segment Name Pump Station Piping
Onshore State Abbreviation Tx
Onshore Postal Code 78362
Onshore City Name Ingleside
Onshore County Name San Patricio
Designated Location Milepost/valve Station
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year 2019
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 27
Est Cost Prop Damage 450
Est Cost Emergency 2000
Est Cost Environmental 0
Est Cost Other 0
Prpty 2477
Accident Psig 540
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind Yes
Invest No Schedule Ind Details Scada Did Not Sound Any Alarms Associated With The Release.
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Other Stripped Ind Threaded Fitting
Additional Vibration Ind Yes
Eq Additional Other Ind Yes
Eq Additional Other Details High-Cycle Reverse Bending Fatigue
Preparer Name N****** G*******
Preparer Title Erc Compliance Speciliast
Preparer Email N*********@p****.com
Preparer Telephone 7136464376
Prepared Date 2019-09-20 00:00:00
Authorizer Name N***** G*****
Authorizer Telephone 7136464336
Authorizer Title Erc Mgr Director
Authorizer Email N******@p****.com
Narrative Approximately 0.5 barrels of crude oil were released within facility boundaries at ingleside station. Employees were onsite on the date and time of the release and immediately identified that a release had begun. Equipment failure in part g was selected due to the swage failing as a result of high-cycle reverse bending fatigue, as determined by third party analysis. To prevent future releases, paa removed and replaced 4 of 6 swages with swage lock fittings at the station as a precautionary measure, and the swage that failed (and an additional swage) were removed and plugged.