HL incident on 2019-08-11 — HI

Operator
Island Energy Services
Cause
Corrosion Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$10,000
Incident datetime
2019-08-11 08:18
Report number
Location
HI
Narrative
At 08:18am and 08:20am island energy blending & shipping console operator received two calls regarding a bad odor. The line was down and not pumping at that time. The pipeline team was notified and responded by arriving onsite at 9:10am. Operations pressured up the pipeline upon the pipeline team's request to 275 psi. The pressure settled at 230 psi and held for 35 mins with no indication of leak by scada, but a pipeline team member noticed bubbles coming from the ground. Notification to nrc made at that time (#1254837). Upon excavating and inspecting pipe surface, the pipeline the team noticed a pin hole leak on the top of the pipe in the area of damaged coating, caused by external corrosion. Estimated product loss was 1bbl, all of which was recovered . Spill did not migrate outside the row (excavated area 10"w x 40'l x d4"). The line was prepped for a permanent repair and a clamp was installed. Update was made to nrc (#1254844). The permanent repair was completed on 8/12/19 (type b sleeve). Update 4/21/19: when the initial report was filed, checkbox for "final" report was omitted by mistake (it was original report plus final report). There is no new information since the original report was filed.
Detailed record list
Report Received Date
2019-09-09 00:00:00
Iyear
2019
Report Number
20190285
Supplemental Number
33625
Report Type
Supplemental Final
Operator Id
Name
Island Energy Services
Operator Street Address
91-480 Malakole Street
Operator City Name
Kapolei
Operator State Abbreviation
HI
Operator Postal Code
96707
Local Datetime
2019-08-11 08:18:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
1
Recovered Bbls
1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2019-08-11 08:18:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Line Was Down At The Time Of The Leak
On Site Datetime
2019-08-11 09:10:00
Nrc Rpt Datetime
2019-08-11 10:10:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
White Oil #1
Segment Name
Wo1
Onshore State Abbreviation
Hi
Onshore Postal Code
96706
Onshore City Name
Ewa Beach
Onshore County Name
Honolulu
Designated Location
Milepost/valve Station
Designated Name
Mp 7.8
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
3
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.219
Pipe Smys
42000
Pipe Specification
Api 5lx
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Asphalt
Installation Year
1959
Manufactured Year
1959
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
84
Est Cost Prop Damage
10000
Est Cost Emergency
5000
Est Cost Environmental
5000
Est Cost Other
0
Prpty
20084
Accident Psig
25
Mop Psig
1000
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
28246
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The incident was caused by a small pin-hole corrosion leak, it was not detectable by scada leak detection.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1959
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Close Interval Survey Ind
Yes
Cp Annual Survey Year
2018
Close Interval Survey Year
2002
Prior Damage
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2015
Circ Wave Recent Year
2015
Geometry Recent Year
2015
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2016
Hydrtst Most Rcnt Pressure
1525
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
W***** R*****
Preparer Title
Pipeline Mooring Analyst
Preparer Email
W***@i*******************.com
Preparer Telephone
808-682-2259
Prepared Date
2020-04-21 00:00:00
Authorizer Name
M**** S*****
Authorizer Telephone
808-682-2299
Authorizer Title
Vice President
Authorizer Email
M******@i*******************.com
Narrative
At 08:18am and 08:20am island energy blending & shipping console operator received two calls regarding a bad odor. The line was down and not pumping at that time. The pipeline team was notified and responded by arriving onsite at 9:10am. Operations pressured up the pipeline upon the pipeline team's request to 275 psi. The pressure settled at 230 psi and held for 35 mins with no indication of leak by scada, but a pipeline team member noticed bubbles coming from the ground. Notification to nrc made at that time (#1254837). Upon excavating and inspecting pipe surface, the pipeline the team noticed a pin hole leak on the top of the pipe in the area of damaged coating, caused by external corrosion. Estimated product loss was 1bbl, all of which was recovered . Spill did not migrate outside the row (excavated area 10"w x 40'l x d4"). The line was prepped for a permanent repair and a clamp was installed. Update was made to nrc (#1254844). The permanent repair was completed on 8/12/19 (type b sleeve). Update 4/21/19: when the initial report was filed, checkbox for "final" report was omitted by mistake (it was original report plus final report). There is no new information since the original report was filed.
Report Received Date 2019-09-09 00:00:00
Iyear 2019
Report Number 20190285
Supplemental Number 33625
Report Type Supplemental Final
Operator Id 39556 PHMSA Enforcement
Name Island Energy Services
Operator Street Address 91-480 Malakole Street
Operator City Name Kapolei
Operator State Abbreviation HI
Operator Postal Code 96707
Local Datetime 2019-08-11 08:18:00
Location Latitude 21.360681 Google Maps OpenStreetMap
Location Longitude -158.023051 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 1
Recovered Bbls 1
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Public
Incident Identified Datetime 2019-08-11 08:18:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The Line Was Down At The Time Of The Leak
On Site Datetime 2019-08-11 09:10:00
Nrc Rpt Datetime 2019-08-11 10:10:00
Nrc Rpt Num 1254837 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name White Oil #1
Segment Name Wo1
Onshore State Abbreviation Hi
Onshore Postal Code 96706
Onshore City Name Ewa Beach
Onshore County Name Honolulu
Designated Location Milepost/valve Station
Designated Name Mp 7.8
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 3
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8.625
Pipe Wall Thickness 0.219
Pipe Smys 42000
Pipe Specification Api 5lx
Pipe Seam Type Erw - Low Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Asphalt
Installation Year 1959
Manufactured Year 1959
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 84
Est Cost Prop Damage 10000
Est Cost Emergency 5000
Est Cost Environmental 5000
Est Cost Other 0
Prpty 20084
Accident Psig 25
Mop Psig 1000
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 28246
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The incident was caused by a small pin-hole corrosion leak, it was not detectable by scada leak detection.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results Localized Pitting
Galvanic Corrosion Ind Yes
Field Exam Basis Ind Yes
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year 1959
Shielding Evident No
Cathodic Survey Type Yes
Cp Annual Survey Ind Yes
Close Interval Survey Ind Yes
Cp Annual Survey Year 2018
Close Interval Survey Year 2002
Prior Damage Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Cir Trn Wave Mgn Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2015
Circ Wave Recent Year 2015
Geometry Recent Year 2015
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2016
Hydrtst Most Rcnt Pressure 1525
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name W***** R*****
Preparer Title Pipeline Mooring Analyst
Preparer Email W***@i*******************.com
Preparer Telephone 808-682-2259
Prepared Date 2020-04-21 00:00:00
Authorizer Name M**** S*****
Authorizer Telephone 808-682-2299
Authorizer Title Vice President
Authorizer Email M******@i*******************.com
Narrative At 08:18am and 08:20am island energy blending & shipping console operator received two calls regarding a bad odor. The line was down and not pumping at that time. The pipeline team was notified and responded by arriving onsite at 9:10am. Operations pressured up the pipeline upon the pipeline team's request to 275 psi. The pressure settled at 230 psi and held for 35 mins with no indication of leak by scada, but a pipeline team member noticed bubbles coming from the ground. Notification to nrc made at that time (#1254837). Upon excavating and inspecting pipe surface, the pipeline the team noticed a pin hole leak on the top of the pipe in the area of damaged coating, caused by external corrosion. Estimated product loss was 1bbl, all of which was recovered . Spill did not migrate outside the row (excavated area 10"w x 40'l x d4"). The line was prepped for a permanent repair and a clamp was installed. Update was made to nrc (#1254844). The permanent repair was completed on 8/12/19 (type b sleeve). Update 4/21/19: when the initial report was filed, checkbox for "final" report was omitted by mistake (it was original report plus final report). There is no new information since the original report was filed.

All rights reserved. Copyright © by ClearPHMSA