Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2019-07-08 — WY
Operator
Bridger Pipeline Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$10,962
Incident datetime
2019-07-08 12:45
Report number
Location
WY
Narrative
On august 8, 2019 a gasket failure on the downstream flange of regulated rural gathering 8" line from marmarth station to baker station occurred. A third party truck driver notified the company of the incident. Operator personnel and controllers worked together to get the pipeline shut in and isolated. The gasket was investigated for cause and no defects or misalignments were noted. A small piece of the gasket was missing between the five and six o'clock positions. The worn gasket was removed and then replaced with a new gasket.
Detailed record list
Report Received Date
2019-08-07 00:00:00
Iyear
2019
Report Number
20190245
Supplemental Number
32593
Report Type
Supplemental Final
Operator Id
31878
Name
Bridger Pipeline Llc
Operator Street Address
455 N. Poplar St.
Operator City Name
Casper
Operator State Abbreviation
WY
Operator Postal Code
82602
Local Datetime
2019-07-08 12:45:00
Location Latitude
46.191125
Location Longitude
-103.952295
Commodity Released Type
Crude Oil
Unintentional Release Bbls
5
Recovered Bbls
3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Third Party Truck Driver
Incident Identified Datetime
2019-07-08 12:45:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-07-08 01:30:00
Restart Datetime
2019-07-08 19:00:00
On Site Datetime
2019-07-08 12:45:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Marmarth Station
Segment Name
Bowman Gathering
Onshore State Abbreviation
Nd
Onshore Postal Code
58643
Onshore City Name
Not Within A Municipality
Onshore County Name
Bowman
Designated Location
Milepost/valve Station
Designated Name
Marmarth
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Gasket
Installation Year
2012
Material Involved
Material Other Than Carbon Steel
Material Details
Paper Gasket Failure
Release Type
Other
Release Type Details
Gasket Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
500
Est Cost Prop Damage
10962
Est Cost Emergency
8296
Est Cost Environmental
5000
Est Cost Other
0
Prpty
24758
Accident Psig
1053
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Gathering
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
After trending the pipeline pressures it was determined that an over-pressure did not occur. Due to the small volume and the location of the leak the controller would not have reasonably been expected to see the leak. The controller did an excellent job getting things shut in/shutdown and working with field personnel.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Eq Additional Other Ind
Yes
Eq Additional Other Details
Worn Gasket
Preparer Name
J**** R*********
Preparer Title
Compliance Coordinator
Preparer Email
J***************@t******.com
Preparer Telephone
3072660250
Prepared Date
2019-08-22 00:00:00
Authorizer Name
J**** R*********
Authorizer Telephone
3072660250
Authorizer Title
Compliance Coordinator
Authorizer Email
J***************@t******.com
Narrative
On august 8, 2019 a gasket failure on the downstream flange of regulated rural gathering 8" line from marmarth station to baker station occurred. A third party truck driver notified the company of the incident. Operator personnel and controllers worked together to get the pipeline shut in and isolated. The gasket was investigated for cause and no defects or misalignments were noted. A small piece of the gasket was missing between the five and six o'clock positions. The worn gasket was removed and then replaced with a new gasket.
| Report Received Date | 2019-08-07 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190245 |
| Supplemental Number | 32593 |
| Report Type | Supplemental Final |
| Operator Id | 31878 PHMSA Enforcement |
| Name | Bridger Pipeline Llc |
| Operator Street Address | 455 N. Poplar St. |
| Operator City Name | Casper |
| Operator State Abbreviation | WY |
| Operator Postal Code | 82602 |
| Local Datetime | 2019-07-08 12:45:00 |
| Location Latitude | 46.191125 Google Maps OpenStreetMap |
| Location Longitude | -103.952295 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 5 |
| Recovered Bbls | 3 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Other |
| Accident Details | Third Party Truck Driver |
| Incident Identified Datetime | 2019-07-08 12:45:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2019-07-08 01:30:00 |
| Restart Datetime | 2019-07-08 19:00:00 |
| On Site Datetime | 2019-07-08 12:45:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Marmarth Station |
| Segment Name | Bowman Gathering |
| Onshore State Abbreviation | Nd |
| Onshore Postal Code | 58643 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Bowman |
| Designated Location | Milepost/valve Station |
| Designated Name | Marmarth |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Other |
| Item Involved Details | Gasket |
| Installation Year | 2012 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Paper Gasket Failure |
| Release Type | Other |
| Release Type Details | Gasket Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 500 |
| Est Cost Prop Damage | 10962 |
| Est Cost Emergency | 8296 |
| Est Cost Environmental | 5000 |
| Est Cost Other | 0 |
| Prpty | 24758 |
| Accident Psig | 1053 |
| Mop Psig | 1440 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Gathering |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | After trending the pipeline pressures it was determined that an over-pressure did not occur. Due to the small volume and the location of the leak the controller would not have reasonably been expected to see the leak. The controller did an excellent job getting things shut in/shutdown and working with field personnel. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Gasket |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Worn Gasket |
| Preparer Name | J**** R********* |
| Preparer Title | Compliance Coordinator |
| Preparer Email | J***************@t******.com |
| Preparer Telephone | 3072660250 |
| Prepared Date | 2019-08-22 00:00:00 |
| Authorizer Name | J**** R********* |
| Authorizer Telephone | 3072660250 |
| Authorizer Title | Compliance Coordinator |
| Authorizer Email | J***************@t******.com |
| Narrative | On august 8, 2019 a gasket failure on the downstream flange of regulated rural gathering 8" line from marmarth station to baker station occurred. A third party truck driver notified the company of the incident. Operator personnel and controllers worked together to get the pipeline shut in and isolated. The gasket was investigated for cause and no defects or misalignments were noted. A small piece of the gasket was missing between the five and six o'clock positions. The worn gasket was removed and then replaced with a new gasket. |