Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2019-05-29 — TX
Operator
Holly Energy Partners - Operating, L.p.
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$40
Incident datetime
2019-05-29 01:22
Report number
Location
TX
Narrative
During normal operations, the holly energy partners control center received an lel vapor monitor alarm at hawley station at 00:22 mt via the scada system. The pipeline was immediately shut down and blocked in at 00:22 mt. A technician was dispatched to the location to investigate further. Once holly energy partners personnel arrived on-site at 01:05 mt, they were able to confirm that a piece of steel tubing had failed on hawley stations pumping unit #2. Holly energy partners personnel on location also reported that there was a release of product from the failed tubing. During a root cause investigation, it was determined that the failure was a result of high-frequency vibration.
Detailed record list
Report Received Date
2019-06-26 00:00:00
Iyear
2019
Report Number
20190201
Supplemental Number
33955
Report Type
Supplemental Final
Operator Id
32011
Name
Holly Energy Partners - Operating, L.p.
Operator Street Address
2323 Victory Ave. Suite 1400
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75219
Local Datetime
2019-05-29 01:22:00
Location Latitude
32.56314783
Location Longitude
-99.78808901
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
0.4
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2019-05-29 01:22:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-05-29 01:22:00
Restart Datetime
2019-05-29 11:34:00
On Site Datetime
2019-05-29 02:05:00
Nrc Rpt Datetime
2019-05-29 03:07:00
Nrc Rpt Num
1247097
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Trust 6/8 Hawley Station
Segment Name
Hawley Station
Onshore State Abbreviation
Tx
Onshore Postal Code
79525
Onshore City Name
Not Within A Municipality
Onshore County Name
Jones
Designated Location
Milepost/valve Station
Designated Name
Pump Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Tubing
Installation Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
25
Est Cost Prop Damage
40
Est Cost Emergency
0
Est Cost Environmental
20000
Est Cost Other
0
Prpty
20065
Accident Psig
385
Mop Psig
1150
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Actions of the control room personnel did not contribute to the failure of the tubing. Control room personnel were operating the pipeline well below mop and the line was in a steady-state.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Threaded Fitting
Additional Vibration Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
High Frequency Vibration
Preparer Name
C****** C***
Preparer Title
Manager Pipeline Regulatory
Preparer Email
C***********@h**********.com
Preparer Telephone
2148713574
Prepared Date
2020-06-26 00:00:00
Authorizer Name
C****** C***
Authorizer Telephone
2148713574
Authorizer Title
Manager Pipeline Regulatory
Authorizer Email
C***********@h**********.com
Narrative
During normal operations, the holly energy partners control center received an lel vapor monitor alarm at hawley station at 00:22 mt via the scada system. The pipeline was immediately shut down and blocked in at 00:22 mt. A technician was dispatched to the location to investigate further. Once holly energy partners personnel arrived on-site at 01:05 mt, they were able to confirm that a piece of steel tubing had failed on hawley stations pumping unit #2. Holly energy partners personnel on location also reported that there was a release of product from the failed tubing. During a root cause investigation, it was determined that the failure was a result of high-frequency vibration.
| Report Received Date | 2019-06-26 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190201 |
| Supplemental Number | 33955 |
| Report Type | Supplemental Final |
| Operator Id | 32011 PHMSA Enforcement |
| Name | Holly Energy Partners - Operating, L.p. |
| Operator Street Address | 2323 Victory Ave. Suite 1400 |
| Operator City Name | Dallas |
| Operator State Abbreviation | TX |
| Operator Postal Code | 75219 |
| Local Datetime | 2019-05-29 01:22:00 |
| Location Latitude | 32.56314783 Google Maps OpenStreetMap |
| Location Longitude | -99.78808901 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 0.4 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2019-05-29 01:22:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2019-05-29 01:22:00 |
| Restart Datetime | 2019-05-29 11:34:00 |
| On Site Datetime | 2019-05-29 02:05:00 |
| Nrc Rpt Datetime | 2019-05-29 03:07:00 |
| Nrc Rpt Num | 1247097 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Trust 6/8 Hawley Station |
| Segment Name | Hawley Station |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79525 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Jones |
| Designated Location | Milepost/valve Station |
| Designated Name | Pump Station |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Tubing |
| Installation Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 25 |
| Est Cost Prop Damage | 40 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 20000 |
| Est Cost Other | 0 |
| Prpty | 20065 |
| Accident Psig | 385 |
| Mop Psig | 1150 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Actions of the control room personnel did not contribute to the failure of the tubing. Control room personnel were operating the pipeline well below mop and the line was in a steady-state. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Threaded Connection/coupling Failure |
| Eq Failure Type | Threaded Connection/coupling Failure |
| Other Stripped Ind | Threaded Fitting |
| Additional Vibration Ind | Yes |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | High Frequency Vibration |
| Preparer Name | C****** C*** |
| Preparer Title | Manager Pipeline Regulatory |
| Preparer Email | C***********@h**********.com |
| Preparer Telephone | 2148713574 |
| Prepared Date | 2020-06-26 00:00:00 |
| Authorizer Name | C****** C*** |
| Authorizer Telephone | 2148713574 |
| Authorizer Title | Manager Pipeline Regulatory |
| Authorizer Email | C***********@h**********.com |
| Narrative | During normal operations, the holly energy partners control center received an lel vapor monitor alarm at hawley station at 00:22 mt via the scada system. The pipeline was immediately shut down and blocked in at 00:22 mt. A technician was dispatched to the location to investigate further. Once holly energy partners personnel arrived on-site at 01:05 mt, they were able to confirm that a piece of steel tubing had failed on hawley stations pumping unit #2. Holly energy partners personnel on location also reported that there was a release of product from the failed tubing. During a root cause investigation, it was determined that the failure was a result of high-frequency vibration. |