HL incident on 2019-06-02 — TX

Operator
Dcp Midstream
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$50
Incident datetime
2019-06-02 05:11
Report number
Location
TX
Narrative
Scada alarmed that the brackettville pump station gas detector alarm had gone off and activated an emergency shutdown at the station. Upon arrival, the techs discovered that the 3/8" tubing, connected to pit-312, sheared off. The pit was isolated and the fitting was replaced. The 3/8" tubing sheared at the fitting above the ferrule and was sent to stress engineering for metallurgical review. Our current root cause analysis and metallurgical review indicates we have elevated vibration at brackettville pump station produced by pump vane pass frequency and motor critical frequency aligned. Our next step in verification of vibration requires that we get a second opinion outside of the initial post component failure vibration report. This will be performed on august 19, 2019 and expect the final report analysis approximately 2 weeks after that. O with the extended services (motion amplification & physical sensor placement) our goal is to rule out any other possibilities I.E. Piping design, motor alone, etc. O test results will visually indicate elevated vibration points and provide a basis for temporary for permanent structural support. O the combined data will help provide justification for pump overhaul to mitigate vane pass frequency. O this visual indicator will assist in pin-pointing exact bracing locations for instrumentation piping support and include all station piping.
Detailed record list
Report Received Date
2019-06-25 00:00:00
Iyear
2019
Report Number
20190199
Supplemental Number
32514
Report Type
Supplemental Final
Operator Id
Name
Dcp Midstream
Operator Street Address
2331 Citywest Blvd. Hq-08-S812-02
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2019-06-02 05:11:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
13
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2019-06-02 05:11:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-06-02 05:11:00
Restart Datetime
2019-06-02 06:00:00
On Site Datetime
2019-06-02 06:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Brackettville Pump Station
Segment Name
Brackettville Pump Station
Onshore State Abbreviation
Tx
Onshore Postal Code
78832
Onshore City Name
Not Within A Municipality
Onshore County Name
Kinney
Designated Location
Survey Station No.
Designated Name
Pump Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Tubing
Installation Year
2018
Material Involved
Material Other Than Carbon Steel
Material Details
Stainless Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Tubing Sheared Off
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
220
Est Cost Prop Damage
50
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
2000
Est Cost Other Details
Cost For Stress Engineering Services Metallurgical Report.
Prpty
2270
Accident Psig
951
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Gas detector alarm was promptly acknowledged by controller and immediately dispatched operations to brackettville pump station
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Defective Or Loose Tubing Or Fitting
Eq Failure Type
Defective Or Loose Tubing Or Fitting
Additional Vibration Ind
Yes
Preparer Name
C**** L****
Preparer Title
Sr. Pipeline Compliance Specialist
Preparer Email
C******@d***********.com
Preparer Telephone
361-584-8518
Prepared Date
2019-08-05 00:00:00
Authorizer Name
J*** D* P*******
Authorizer Telephone
405-605-3859
Authorizer Title
Mgr Pipeline Compliance
Authorizer Email
J*********@d***********.com
Narrative
Scada alarmed that the brackettville pump station gas detector alarm had gone off and activated an emergency shutdown at the station. Upon arrival, the techs discovered that the 3/8" tubing, connected to pit-312, sheared off. The pit was isolated and the fitting was replaced. The 3/8" tubing sheared at the fitting above the ferrule and was sent to stress engineering for metallurgical review. Our current root cause analysis and metallurgical review indicates we have elevated vibration at brackettville pump station produced by pump vane pass frequency and motor critical frequency aligned. Our next step in verification of vibration requires that we get a second opinion outside of the initial post component failure vibration report. This will be performed on august 19, 2019 and expect the final report analysis approximately 2 weeks after that. O with the extended services (motion amplification & physical sensor placement) our goal is to rule out any other possibilities I.E. Piping design, motor alone, etc. O test results will visually indicate elevated vibration points and provide a basis for temporary for permanent structural support. O the combined data will help provide justification for pump overhaul to mitigate vane pass frequency. O this visual indicator will assist in pin-pointing exact bracing locations for instrumentation piping support and include all station piping.
Report Received Date 2019-06-25 00:00:00
Iyear 2019
Report Number 20190199
Supplemental Number 32514
Report Type Supplemental Final
Operator Id 31130 PHMSA Enforcement
Name Dcp Midstream
Operator Street Address 2331 Citywest Blvd. Hq-08-S812-02
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77042
Local Datetime 2019-06-02 05:11:00
Location Latitude 29.34572 Google Maps OpenStreetMap
Location Longitude -100.562198 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 13
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime 2019-06-02 05:11:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2019-06-02 05:11:00
Restart Datetime 2019-06-02 06:00:00
On Site Datetime 2019-06-02 06:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Brackettville Pump Station
Segment Name Brackettville Pump Station
Onshore State Abbreviation Tx
Onshore Postal Code 78832
Onshore City Name Not Within A Municipality
Onshore County Name Kinney
Designated Location Survey Station No.
Designated Name Pump Station
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Tubing
Installation Year 2018
Material Involved Material Other Than Carbon Steel
Material Details Stainless Steel
Release Type Leak
Leak Type Other
Leak Type Other Tubing Sheared Off
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 220
Est Cost Prop Damage 50
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 2000
Est Cost Other Details Cost For Stress Engineering Services Metallurgical Report.
Prpty 2270
Accident Psig 951
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Gas detector alarm was promptly acknowledged by controller and immediately dispatched operations to brackettville pump station
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Defective Or Loose Tubing Or Fitting
Eq Failure Type Defective Or Loose Tubing Or Fitting
Additional Vibration Ind Yes
Preparer Name C**** L****
Preparer Title Sr. Pipeline Compliance Specialist
Preparer Email C******@d***********.com
Preparer Telephone 361-584-8518
Prepared Date 2019-08-05 00:00:00
Authorizer Name J*** D* P*******
Authorizer Telephone 405-605-3859
Authorizer Title Mgr Pipeline Compliance
Authorizer Email J*********@d***********.com
Narrative Scada alarmed that the brackettville pump station gas detector alarm had gone off and activated an emergency shutdown at the station. Upon arrival, the techs discovered that the 3/8" tubing, connected to pit-312, sheared off. The pit was isolated and the fitting was replaced. The 3/8" tubing sheared at the fitting above the ferrule and was sent to stress engineering for metallurgical review. Our current root cause analysis and metallurgical review indicates we have elevated vibration at brackettville pump station produced by pump vane pass frequency and motor critical frequency aligned. Our next step in verification of vibration requires that we get a second opinion outside of the initial post component failure vibration report. This will be performed on august 19, 2019 and expect the final report analysis approximately 2 weeks after that. O with the extended services (motion amplification & physical sensor placement) our goal is to rule out any other possibilities I.E. Piping design, motor alone, etc. O test results will visually indicate elevated vibration points and provide a basis for temporary for permanent structural support. O the combined data will help provide justification for pump overhaul to mitigate vane pass frequency. O this visual indicator will assist in pin-pointing exact bracing locations for instrumentation piping support and include all station piping.

All rights reserved. Copyright © by ClearPHMSA