HL incident on 2019-05-20 — TX

Operator
Hiland Crude, Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,250
Incident datetime
2019-05-20 11:24
Report number
Location
TX
Narrative
05/20/2019, 11:24-hours, hiland crude contracted aerial patrol observed a possible leak and reported the observation to local operations; 11:25-hours, operations dispatched staff to investigate. Upon arrival at the site at approximately 11:30-hours, staff identified a leak which was occurring from a pin hole in a 2-inch elbow in the drain pipe of the pig trap. At 11:35-hours, valves either side of the leak within the 2-inch drain pipe were closed to terminate the leak and the spill was contained. At 12:46-hours, the operations supervisor was on site to assess the situation and confirmed discovery of an estimated 22 barrels of spill quantity. There were no pipeline interruptions to customers nor throughput based on this isolation of the 2-inch drain pipe. With the pin-hole leak located in the 2-inch drain pipe, it was not necessary to shut-in the pipeline. Spill cleanup and disposal began promptly. The spill was recovered with a recovery volume of 22 barrels as estimated. As part of this investigation, operations estimated the leak began 05/15/2019, reaching five gallons qunatity at 19:45 hours. The pipeline routinely operates between 50 psig and 100 psig. The 2-inch elbow was removed and delivered to a laboratory for metallurgical analysis. Spill remediation was completed 7/09/2019. Field repair of the piping was completed 7/19/2019. Argen laboratories, houston, texas provided analysis for kinder morgan metallurgy staff. The pinhole leak in the 2-inch elbow was located in the 6:00 position; said elbow was part of the pig trap drain line pipe. The 2-inch elbow was stamped with the following: 2 std wpb mak 1 11 96. Said elbow was installed in 1995 but the manufacturer, grade, and coating are unknown. The pinhole leak was the results of corrosion involving chlorination and sulfidation reactions. Metallographic evaluation did not reveal injurious microstructural features. The chemical analysis results of the 2-inch elbow were consistent with astm a234 grade b.
Detailed record list
Report Received Date
2019-06-18 00:00:00
Iyear
2019
Report Number
20190196
Supplemental Number
32808
Report Type
Supplemental Final
Operator Id
Name
Hiland Crude, Llc
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2019-05-20 11:24:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
22
Recovered Bbls
22
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Air Patrol
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2019-05-20 11:24:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Leak Was In 2-Inch Drain At Pig Trap; Not In Main Pipeline;
On Site Datetime
2019-05-20 11:30:00
Nrc Rpt Datetime
2019-05-20 13:13:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Kay Ctb Junction To Tara 1-25 Junction
Segment Name
Kay Ctb Junction To Tara 1-25 Junction
Onshore State Abbreviation
Nd
Onshore Postal Code
58643
Onshore City Name
Not Within A Municipality
Onshore County Name
Bowman
Designated Location
Milepost/valve Station
Designated Name
Mp 0 0+00
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
1995
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
26460
Est Cost Gas Released
840
Est Cost Prop Damage
1250
Est Cost Emergency
500
Est Cost Environmental
185175
Est Cost Other
515
Est Cost Other Details
Metallurgical Analysis;
Prpty
214740
Accident Psig
100
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
6
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
Leak Was In 2-Inch Drain At Pig Trap; Not In Main Pipeline;
Operation Complications Ind
Yes
Other Complications Ind
Yes
Inspect Comp Details
Leak Was In 2-Inch Drain At Pig Trap
Pipeline Function
> 20% Smys Regulated Gathering
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Leak was in 2-inch drain at pig trap; not in main pipeline;
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Elbow Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Preparer Name
W****** M***** M*****
Preparer Title
Specialist - Pipeline Technical
Preparer Email
M************@k***********.com
Preparer Telephone
205 325 3863
Preparer Fax
205 325 3508
Prepared Date
2019-10-11 00:00:00
Authorizer Name
J**** H********
Authorizer Telephone
713 369 9443
Authorizer Title
Director Engineering Codes And Standards
Authorizer Email
J**************@k***********.com
Narrative
05/20/2019, 11:24-hours, hiland crude contracted aerial patrol observed a possible leak and reported the observation to local operations; 11:25-hours, operations dispatched staff to investigate. Upon arrival at the site at approximately 11:30-hours, staff identified a leak which was occurring from a pin hole in a 2-inch elbow in the drain pipe of the pig trap. At 11:35-hours, valves either side of the leak within the 2-inch drain pipe were closed to terminate the leak and the spill was contained. At 12:46-hours, the operations supervisor was on site to assess the situation and confirmed discovery of an estimated 22 barrels of spill quantity. There were no pipeline interruptions to customers nor throughput based on this isolation of the 2-inch drain pipe. With the pin-hole leak located in the 2-inch drain pipe, it was not necessary to shut-in the pipeline. Spill cleanup and disposal began promptly. The spill was recovered with a recovery volume of 22 barrels as estimated. As part of this investigation, operations estimated the leak began 05/15/2019, reaching five gallons qunatity at 19:45 hours. The pipeline routinely operates between 50 psig and 100 psig. The 2-inch elbow was removed and delivered to a laboratory for metallurgical analysis. Spill remediation was completed 7/09/2019. Field repair of the piping was completed 7/19/2019. Argen laboratories, houston, texas provided analysis for kinder morgan metallurgy staff. The pinhole leak in the 2-inch elbow was located in the 6:00 position; said elbow was part of the pig trap drain line pipe. The 2-inch elbow was stamped with the following: 2 std wpb mak 1 11 96. Said elbow was installed in 1995 but the manufacturer, grade, and coating are unknown. The pinhole leak was the results of corrosion involving chlorination and sulfidation reactions. Metallographic evaluation did not reveal injurious microstructural features. The chemical analysis results of the 2-inch elbow were consistent with astm a234 grade b.
Report Received Date 2019-06-18 00:00:00
Iyear 2019
Report Number 20190196
Supplemental Number 32808
Report Type Supplemental Final
Operator Id 32619 PHMSA Enforcement
Name Hiland Crude, Llc
Operator Street Address 1001 Louisiana St, Suite 1000
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2019-05-20 11:24:00
Location Latitude 46.192304 Google Maps OpenStreetMap
Location Longitude -103.953154 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 22
Recovered Bbls 22
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Air Patrol
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2019-05-20 11:24:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Leak Was In 2-Inch Drain At Pig Trap; Not In Main Pipeline;
On Site Datetime 2019-05-20 11:30:00
Nrc Rpt Datetime 2019-05-20 13:13:00
Nrc Rpt Num 1246247 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Kay Ctb Junction To Tara 1-25 Junction
Segment Name Kay Ctb Junction To Tara 1-25 Junction
Onshore State Abbreviation Nd
Onshore Postal Code 58643
Onshore City Name Not Within A Municipality
Onshore County Name Bowman
Designated Location Milepost/valve Station
Designated Name Mp 0 0+00
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year 1995
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 26460
Est Cost Gas Released 840
Est Cost Prop Damage 1250
Est Cost Emergency 500
Est Cost Environmental 185175
Est Cost Other 515
Est Cost Other Details Metallurgical Analysis;
Prpty 214740
Accident Psig 100
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 6
Internal Inspection Ind No
Other Inspection Ind Yes
Internal Inspection Details Leak Was In 2-Inch Drain At Pig Trap; Not In Main Pipeline;
Operation Complications Ind Yes
Other Complications Ind Yes
Inspect Comp Details Leak Was In 2-Inch Drain At Pig Trap
Pipeline Function > 20% Smys Regulated Gathering
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Leak was in 2-inch drain at pig trap; not in main pipeline;
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Water Acid Ind Yes
Int Metallurgical Basis Ind Yes
Int Elbow Loc Ind Yes
Corrosion Inhibitors No
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Preparer Name W****** M***** M*****
Preparer Title Specialist - Pipeline Technical
Preparer Email M************@k***********.com
Preparer Telephone 205 325 3863
Preparer Fax 205 325 3508
Prepared Date 2019-10-11 00:00:00
Authorizer Name J**** H********
Authorizer Telephone 713 369 9443
Authorizer Title Director Engineering Codes And Standards
Authorizer Email J**************@k***********.com
Narrative 05/20/2019, 11:24-hours, hiland crude contracted aerial patrol observed a possible leak and reported the observation to local operations; 11:25-hours, operations dispatched staff to investigate. Upon arrival at the site at approximately 11:30-hours, staff identified a leak which was occurring from a pin hole in a 2-inch elbow in the drain pipe of the pig trap. At 11:35-hours, valves either side of the leak within the 2-inch drain pipe were closed to terminate the leak and the spill was contained. At 12:46-hours, the operations supervisor was on site to assess the situation and confirmed discovery of an estimated 22 barrels of spill quantity. There were no pipeline interruptions to customers nor throughput based on this isolation of the 2-inch drain pipe. With the pin-hole leak located in the 2-inch drain pipe, it was not necessary to shut-in the pipeline. Spill cleanup and disposal began promptly. The spill was recovered with a recovery volume of 22 barrels as estimated. As part of this investigation, operations estimated the leak began 05/15/2019, reaching five gallons qunatity at 19:45 hours. The pipeline routinely operates between 50 psig and 100 psig. The 2-inch elbow was removed and delivered to a laboratory for metallurgical analysis. Spill remediation was completed 7/09/2019. Field repair of the piping was completed 7/19/2019. Argen laboratories, houston, texas provided analysis for kinder morgan metallurgy staff. The pinhole leak in the 2-inch elbow was located in the 6:00 position; said elbow was part of the pig trap drain line pipe. The 2-inch elbow was stamped with the following: 2 std wpb mak 1 11 96. Said elbow was installed in 1995 but the manufacturer, grade, and coating are unknown. The pinhole leak was the results of corrosion involving chlorination and sulfidation reactions. Metallographic evaluation did not reveal injurious microstructural features. The chemical analysis results of the 2-inch elbow were consistent with astm a234 grade b.

All rights reserved. Copyright © by ClearPHMSA