Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2019-05-14 — TX
Operator
Exxonmobil Oil Corporation
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$2,000
Incident datetime
2019-05-14 07:30
Report number
Location
TX
Narrative
At 7:30am, exxonmobil pipeline company (empco) hca personnel were conducting unrelated maintenance work in the area, when they detected lower explosive level (lel) readings at the facility fence line and noticed ice forming on the 12" flange at the demarcation of the mc-41 connection site. Hca personnel contacted local operations of their findings, resulting in facility personnel arrival at around 7:50am. Local operations instructed occ to shutdown, accordingly, coordinating efforts with the third party operator. The affected pipeline segment was completely isolated at 9:06am. The release originated from a slight misalignment of flanges at the interface with the third party. The third party flange bolts were torqued to a level above the torque at the flange where the leak occurred. The empco flange bolts were torqued to gasket manufacturer's specifications. A series of actions were conducted to recommission the pipeline. A total of 200 lbs. (1.63 bbls) of ethylene were released to the atmosphere. Agency notifications were made to the texas spill reporting hotline at 8:07am (confirmation # 2019-1672), reaching texas railroad commission and texas commission of environmental quality, and the national response center (confirmation #1245579) at 8:20am cst.
Detailed record list
Report Received Date
2019-06-13 00:00:00
Iyear
2019
Report Number
20190186
Supplemental Number
32277
Report Type
Original Final
Operator Id
12634
Name
Exxonmobil Oil Corporation
Operator Street Address
2775 Gulf States Road
Operator City Name
Beaumont
Operator State Abbreviation
TX
Operator Postal Code
77704
Local Datetime
2019-05-14 07:30:00
Location Latitude
30.02811
Location Longitude
-94.082223
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Ethylene
Unintentional Release Bbls
1.63
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2019-05-14 07:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-05-14 08:16:00
Restart Datetime
2019-05-16 18:25:00
On Site Datetime
2019-05-14 07:50:00
Nrc Rpt Datetime
2019-05-14 08:20:00
Nrc Rpt Num
1245579
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Spindletop Surveillance Site
Segment Name
Mc-41 Connection Site
Onshore State Abbreviation
Tx
Onshore Postal Code
77701
Onshore City Name
Beaumont
Onshore County Name
Jefferson
Designated Location
Milepost/valve Station
Designated Name
Esd 15130
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Flange Assembly
Installation Year
2018
Material Involved
Material Other Than Carbon Steel
Material Details
Gasket Of Stainless Steel And Composite
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
1681
Est Cost Prop Damage
2000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
30000
Est Cost Other Details
Permitted Flaring, Labor Cost
Prpty
33681
Accident Psig
1226
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
9
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
This Is A Small Facility Connection Spool To A Third Party Teed Into Multiple Systems.
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No abnormal pressure changes or activity were detected.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Ief Addl Misalignment Ind
Yes
Preparer Name
D**** R* S*****
Preparer Title
Pipeline Safety Advisor
Preparer Email
D*************@e*********.com
Preparer Telephone
832-624-7531
Prepared Date
2019-06-13 00:00:00
Authorizer Name
C******* B* H********
Authorizer Telephone
832-624-7920
Authorizer Title
Exxonmobil Pipeline Company Sshe Manager
Authorizer Email
C*******************@e*********.com
Narrative
At 7:30am, exxonmobil pipeline company (empco) hca personnel were conducting unrelated maintenance work in the area, when they detected lower explosive level (lel) readings at the facility fence line and noticed ice forming on the 12" flange at the demarcation of the mc-41 connection site. Hca personnel contacted local operations of their findings, resulting in facility personnel arrival at around 7:50am. Local operations instructed occ to shutdown, accordingly, coordinating efforts with the third party operator. The affected pipeline segment was completely isolated at 9:06am. The release originated from a slight misalignment of flanges at the interface with the third party. The third party flange bolts were torqued to a level above the torque at the flange where the leak occurred. The empco flange bolts were torqued to gasket manufacturer's specifications. A series of actions were conducted to recommission the pipeline. A total of 200 lbs. (1.63 bbls) of ethylene were released to the atmosphere. Agency notifications were made to the texas spill reporting hotline at 8:07am (confirmation # 2019-1672), reaching texas railroad commission and texas commission of environmental quality, and the national response center (confirmation #1245579) at 8:20am cst.
| Report Received Date | 2019-06-13 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190186 |
| Supplemental Number | 32277 |
| Report Type | Original Final |
| Operator Id | 12634 PHMSA Enforcement |
| Name | Exxonmobil Oil Corporation |
| Operator Street Address | 2775 Gulf States Road |
| Operator City Name | Beaumont |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77704 |
| Local Datetime | 2019-05-14 07:30:00 |
| Location Latitude | 30.02811 Google Maps OpenStreetMap |
| Location Longitude | -94.082223 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Other Hvl |
| Commodity Details | Ethylene |
| Unintentional Release Bbls | 1.63 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2019-05-14 07:30:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2019-05-14 08:16:00 |
| Restart Datetime | 2019-05-16 18:25:00 |
| On Site Datetime | 2019-05-14 07:50:00 |
| Nrc Rpt Datetime | 2019-05-14 08:20:00 |
| Nrc Rpt Num | 1245579 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Spindletop Surveillance Site |
| Segment Name | Mc-41 Connection Site |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77701 |
| Onshore City Name | Beaumont |
| Onshore County Name | Jefferson |
| Designated Location | Milepost/valve Station |
| Designated Name | Esd 15130 |
| Federal | No |
| Location Type | Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Flange Assembly |
| Installation Year | 2018 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Gasket Of Stainless Steel And Composite |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1681 |
| Est Cost Prop Damage | 2000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 30000 |
| Est Cost Other Details | Permitted Flaring, Labor Cost |
| Prpty | 33681 |
| Accident Psig | 1226 |
| Mop Psig | 1440 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 9 |
| Internal Inspection Ind | No |
| Other Inspection Ind | Yes |
| Internal Inspection Details | This Is A Small Facility Connection Spool To A Third Party Teed Into Multiple Systems. |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No abnormal pressure changes or activity were detected. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Gasket |
| Ief Addl Misalignment Ind | Yes |
| Preparer Name | D**** R* S***** |
| Preparer Title | Pipeline Safety Advisor |
| Preparer Email | D*************@e*********.com |
| Preparer Telephone | 832-624-7531 |
| Prepared Date | 2019-06-13 00:00:00 |
| Authorizer Name | C******* B* H******** |
| Authorizer Telephone | 832-624-7920 |
| Authorizer Title | Exxonmobil Pipeline Company Sshe Manager |
| Authorizer Email | C*******************@e*********.com |
| Narrative | At 7:30am, exxonmobil pipeline company (empco) hca personnel were conducting unrelated maintenance work in the area, when they detected lower explosive level (lel) readings at the facility fence line and noticed ice forming on the 12" flange at the demarcation of the mc-41 connection site. Hca personnel contacted local operations of their findings, resulting in facility personnel arrival at around 7:50am. Local operations instructed occ to shutdown, accordingly, coordinating efforts with the third party operator. The affected pipeline segment was completely isolated at 9:06am. The release originated from a slight misalignment of flanges at the interface with the third party. The third party flange bolts were torqued to a level above the torque at the flange where the leak occurred. The empco flange bolts were torqued to gasket manufacturer's specifications. A series of actions were conducted to recommission the pipeline. A total of 200 lbs. (1.63 bbls) of ethylene were released to the atmosphere. Agency notifications were made to the texas spill reporting hotline at 8:07am (confirmation # 2019-1672), reaching texas railroad commission and texas commission of environmental quality, and the national response center (confirmation #1245579) at 8:20am cst. |