HL incident on 2019-06-03 — OK
Operator
Bkep Crude, Llc
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$250
Incident datetime
2019-06-03 09:40
Report number
Location
OK
Narrative
During pipeline startup the backpressure valve diaphragm failed. Eddy hobbs from bkep was onsite and discovered the release. Scout (fain plant owner) called out red j services, llc (po box 52408 amarillo, tx 79159) to handle cleanup as they are the site owner. Cleanup was completed on the same day as the release. Bkep replaced the ruptured diaphragm and returned the line to service. Bkep has evaluated the need for more frequent inspections. Going forward, valves in the system with this type of diaphragm will have a more frequent inspection schedule.
Detailed record list
Report Received Date
2019-06-13 00:00:00
Iyear
2019
Report Number
20190184
Supplemental Number
32663
Report Type
Supplemental Final
Operator Id
32481
Name
Bkep Crude, Llc
Operator Street Address
6060 American Plaza Suite 600
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74135
Local Datetime
2019-06-03 09:40:00
Location Latitude
35.51847
Location Longitude
-101.91335
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Other
Commodity Details
Condensate
Unintentional Release Bbls
1.08
Recovered Bbls
0.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2019-06-03 09:40:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-06-03 09:42:00
Restart Datetime
2019-06-03 11:00:00
On Site Datetime
2019-06-03 10:20:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Masterson System
Segment Name
Masterson 3"
Onshore State Abbreviation
Tx
Onshore Postal Code
79029
Onshore City Name
Not Within A Municipality
Onshore County Name
Potter
Designated Location
Milepost/valve Station
Designated Name
Fain Plant
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2016
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
71
Est Cost Prop Damage
250
Est Cost Emergency
0
Est Cost Environmental
500
Est Cost Other
0
Prpty
821
Accident Psig
134
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Diaphragm
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Control Valve Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Diaphragm On Back Pressure Valve Ruptured.
Preparer Name
G*** M*****
Preparer Title
Manager Of Dot Compliance
Preparer Email
G******@b***.com
Preparer Telephone
405-590-2035
Prepared Date
2019-07-03 00:00:00
Authorizer Name
S**** R*********
Authorizer Telephone
903-576-3706
Authorizer Title
Operations Manager
Authorizer Email
S***********@b***.com
Narrative
During pipeline startup the backpressure valve diaphragm failed. Eddy hobbs from bkep was onsite and discovered the release. Scout (fain plant owner) called out red j services, llc (po box 52408 amarillo, tx 79159) to handle cleanup as they are the site owner. Cleanup was completed on the same day as the release. Bkep replaced the ruptured diaphragm and returned the line to service. Bkep has evaluated the need for more frequent inspections. Going forward, valves in the system with this type of diaphragm will have a more frequent inspection schedule.
| Report Received Date | 2019-06-13 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190184 |
| Supplemental Number | 32663 |
| Report Type | Supplemental Final |
| Operator Id | 32481 PHMSA Enforcement |
| Name | Bkep Crude, Llc |
| Operator Street Address | 6060 American Plaza Suite 600 |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74135 |
| Local Datetime | 2019-06-03 09:40:00 |
| Location Latitude | 35.51847 Google Maps OpenStreetMap |
| Location Longitude | -101.91335 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Other |
| Commodity Details | Condensate |
| Unintentional Release Bbls | 1.08 |
| Recovered Bbls | 0.5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2019-06-03 09:40:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2019-06-03 09:42:00 |
| Restart Datetime | 2019-06-03 11:00:00 |
| On Site Datetime | 2019-06-03 10:20:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Masterson System |
| Segment Name | Masterson 3" |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79029 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Potter |
| Designated Location | Milepost/valve Station |
| Designated Name | Fain Plant |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | 2016 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 71 |
| Est Cost Prop Damage | 250 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 500 |
| Est Cost Other | 0 |
| Prpty | 821 |
| Accident Psig | 134 |
| Mop Psig | 285 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Diaphragm |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Control Valve Ind | Yes |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Diaphragm On Back Pressure Valve Ruptured. |
| Preparer Name | G*** M***** |
| Preparer Title | Manager Of Dot Compliance |
| Preparer Email | G******@b***.com |
| Preparer Telephone | 405-590-2035 |
| Prepared Date | 2019-07-03 00:00:00 |
| Authorizer Name | S**** R********* |
| Authorizer Telephone | 903-576-3706 |
| Authorizer Title | Operations Manager |
| Authorizer Email | S***********@b***.com |
| Narrative | During pipeline startup the backpressure valve diaphragm failed. Eddy hobbs from bkep was onsite and discovered the release. Scout (fain plant owner) called out red j services, llc (po box 52408 amarillo, tx 79159) to handle cleanup as they are the site owner. Cleanup was completed on the same day as the release. Bkep replaced the ruptured diaphragm and returned the line to service. Bkep has evaluated the need for more frequent inspections. Going forward, valves in the system with this type of diaphragm will have a more frequent inspection schedule. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA