Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2019-05-11 — TX
Operator
Permian Express Partners Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$4,000
Incident datetime
2019-05-11 09:49
Report number
Location
TX
Narrative
On 5/11/19 at approximately 9:49 am, field personnel found oil on the surface near the pe2 outbound/inbound meter. The control room was notified at 9:50 am and the pipeline was shutdown. The meter relief line was determined to be the source of the release. The line was isolated for repairs and remediation of surrounding soil. Upon excavation it was discovered that the failure was due to an internal corrosion pinhole at the 6 o'clock position. A plidco clamp was installed and on 5/12/18 at 3:35 am, the pipeline was returned to service. All free product was recovered and contaminated soil is being remediated on-site. Clean backfill and gravel was brought in. Failed section will be cut out and replaced at a later date.
Detailed record list
Report Received Date
2019-06-06 00:00:00
Iyear
2019
Report Number
20190178
Supplemental Number
32246
Report Type
Original Final
Operator Id
39596
Name
Permian Express Partners Llc
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2019-05-11 09:30:00
Location Latitude
32.5303
Location Longitude
-100.8297
Commodity Released Type
Crude Oil
Unintentional Release Bbls
20
Recovered Bbls
20
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2019-05-11 09:49:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2019-05-11 09:50:00
Restart Datetime
2019-05-12 03:35:00
On Site Datetime
2019-05-11 09:49:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Colorado City Station
Segment Name
Pe2 Colorado City Station
Onshore State Abbreviation
Tx
Onshore Postal Code
79526
Onshore City Name
Hermleigh
Onshore County Name
Scurry
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
96
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
20
Pipe Wall Thickness
0.375
Pipe Smys
65000
Pipe Specification
Api 5l
Pipe Seam Type
Dsaw
Pipe Manufacturer
Stupp
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
2015
Manufactured Year
2015
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1200
Est Cost Prop Damage
4000
Est Cost Emergency
20000
Est Cost Environmental
1000
Est Cost Other
0
Prpty
26200
Accident Psig
45
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Not Cut Open
Int Water Acid Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T*** N*******
Preparer Title
Sr. Manager - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Preparer Fax
877-917-0448
Prepared Date
2019-05-31 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Sr. Manager - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 5/11/19 at approximately 9:49 am, field personnel found oil on the surface near the pe2 outbound/inbound meter. The control room was notified at 9:50 am and the pipeline was shutdown. The meter relief line was determined to be the source of the release. The line was isolated for repairs and remediation of surrounding soil. Upon excavation it was discovered that the failure was due to an internal corrosion pinhole at the 6 o'clock position. A plidco clamp was installed and on 5/12/18 at 3:35 am, the pipeline was returned to service. All free product was recovered and contaminated soil is being remediated on-site. Clean backfill and gravel was brought in. Failed section will be cut out and replaced at a later date.
| Report Received Date | 2019-06-06 00:00:00 |
|---|---|
| Iyear | 2019 |
| Report Number | 20190178 |
| Supplemental Number | 32246 |
| Report Type | Original Final |
| Operator Id | 39596 PHMSA Enforcement |
| Name | Permian Express Partners Llc |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2019-05-11 09:30:00 |
| Location Latitude | 32.5303 Google Maps OpenStreetMap |
| Location Longitude | -100.8297 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 20 |
| Recovered Bbls | 20 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2019-05-11 09:49:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2019-05-11 09:50:00 |
| Restart Datetime | 2019-05-12 03:35:00 |
| On Site Datetime | 2019-05-11 09:49:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Colorado City Station |
| Segment Name | Pe2 Colorado City Station |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79526 |
| Onshore City Name | Hermleigh |
| Onshore County Name | Scurry |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 96 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 20 |
| Pipe Wall Thickness | 0.375 |
| Pipe Smys | 65000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Dsaw |
| Pipe Manufacturer | Stupp |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Installation Year | 2015 |
| Manufactured Year | 2015 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1200 |
| Est Cost Prop Damage | 4000 |
| Est Cost Emergency | 20000 |
| Est Cost Environmental | 1000 |
| Est Cost Other | 0 |
| Prpty | 26200 |
| Accident Psig | 45 |
| Mop Psig | 285 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | A review of the accident determined there were no control room actions that contributed to the event. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Not Cut Open |
| Int Water Acid Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | No |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | T*** N******* |
| Preparer Title | Sr. Manager - Dot Compliance |
| Preparer Email | T************@e*************.com |
| Preparer Telephone | 713-989-7126 |
| Preparer Fax | 877-917-0448 |
| Prepared Date | 2019-05-31 00:00:00 |
| Authorizer Name | T*** N******* |
| Authorizer Telephone | 713-989-7126 |
| Authorizer Title | Sr. Manager - Dot Compliance |
| Authorizer Email | T************@e*************.com |
| Narrative | On 5/11/19 at approximately 9:49 am, field personnel found oil on the surface near the pe2 outbound/inbound meter. The control room was notified at 9:50 am and the pipeline was shutdown. The meter relief line was determined to be the source of the release. The line was isolated for repairs and remediation of surrounding soil. Upon excavation it was discovered that the failure was due to an internal corrosion pinhole at the 6 o'clock position. A plidco clamp was installed and on 5/12/18 at 3:35 am, the pipeline was returned to service. All free product was recovered and contaminated soil is being remediated on-site. Clean backfill and gravel was brought in. Failed section will be cut out and replaced at a later date. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA