HL incident on 2018-04-11 — TX

Operator
Harvest Midstream Company
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$6,821
Incident datetime
2018-04-11 12:20
Report number
Location
TX
Narrative
At the time of this release harvest viewed it as related to a pipeline maintenance activity (pigging), and originally believed that the reporting exception in 195.50(b) applied. After discussing this release with the txrrc and reviewing the rulemaking history for the rule, harvest now believes that the intent of the rule is to exempt planned or reasonably expected releases from maintenance activity (for example, releases from a pig trap during pigging). The release in this instance was associated with a pigging activity, but ultimately was caused by internal corrosion on the pipe body. Harvest made a good faith mistake and is filing this report to correct it. There were two accidents that were identified on the pearsall pipeline downstream of dilley station on april 11, 2018. This report is associated with the accident that occurred at shiner ranch. This spill was less than 1bbls and associated cost less than $50,000; therefore, immediate notification to the nrc was not required. On april 11th at approximately 11:02 aerial patrol identified signs of a leak on the pearsall pipeline downstream of dilley station near wilson ranch. The pipeline was shut-in at approximately 11:36 based on this information. While in route to investigate, a harvest operator identified signs of a leak near shiner ranch at approximately 12:20. Preventative measure to keep from reoccurring the in-line inspection (ili) scheduled for 2021 was accelerated to 2018 as a result of a leak that occurred on november 14, 2017. These leaks were identified during progressive cleaning operations in preparation for the ili. The line was shut down and temporary repair clamps were installed on the leak locations. Contaminated soils were removed and progressive cleaning operations continued. The ili was completed april 19, 2018. Based on the 2018 ili data, approximately 8.5 miles of pipe was replaced. The line was placed back into service on august 20, 2018. 3f & 3g: this pipeline was acquired from another operator. The pipe manufacturer and year of manufacture is not known
Detailed record list
Report Received Date
2019-05-31 00:00:00
Iyear
2018
Report Number
20190176
Supplemental Number
33219
Report Type
Supplemental Final
Operator Id
Name
Harvest Midstream Company
Operator Street Address
1111 Travis
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-04-11 12:20:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1
Recovered Bbls
1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2018-04-11 12:20:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-04-11 11:36:00
Restart Datetime
2018-08-22 10:56:00
On Site Datetime
2018-04-11 12:20:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Pearsall Pipeline (Downstream Of Dilley Station)
Segment Name
Shiner Ranch
Onshore State Abbreviation
Tx
Onshore Postal Code
78014
Onshore City Name
Not Within A Municipality
Onshore County Name
Frio
Designated Location
Milepost/valve Station
Designated Name
Row
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10
Pipe Wall Thickness
0.188
Pipe Smys
60000
Pipe Specification
Api 5lx
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Other
Pipe Coating Details
Polyken Tape Coating
Installation Year
1990
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
65
Est Cost Prop Damage
6821
Est Cost Emergency
500
Est Cost Environmental
2075
Est Cost Other
0
Prpty
9461
Accident Psig
457
Mop Psig
780
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
114945
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The pin hole leak was caused by internal corrosion
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2018
Geometry Recent Year
2018
Other Recent Year
2018
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2007
Hydrtst Most Rcnt Pressure
1151
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Other Type
Visual
Exm Other Rcnt Year
2018
Exm Other Rcnt Ind
Yes
Preparer Name
T*** S* B****
Preparer Title
Sr. Regulatory Compliance Specialist
Preparer Email
T******@h***************.com
Preparer Telephone
713.289.2688
Prepared Date
2020-01-22 00:00:00
Authorizer Name
T*** S* B****
Authorizer Telephone
713.289.2688
Authorizer Title
Sr. Regulatory Compliance Specialist
Authorizer Email
T******@h***************.com
Narrative
At the time of this release harvest viewed it as related to a pipeline maintenance activity (pigging), and originally believed that the reporting exception in 195.50(b) applied. After discussing this release with the txrrc and reviewing the rulemaking history for the rule, harvest now believes that the intent of the rule is to exempt planned or reasonably expected releases from maintenance activity (for example, releases from a pig trap during pigging). The release in this instance was associated with a pigging activity, but ultimately was caused by internal corrosion on the pipe body. Harvest made a good faith mistake and is filing this report to correct it. There were two accidents that were identified on the pearsall pipeline downstream of dilley station on april 11, 2018. This report is associated with the accident that occurred at shiner ranch. This spill was less than 1bbls and associated cost less than $50,000; therefore, immediate notification to the nrc was not required. On april 11th at approximately 11:02 aerial patrol identified signs of a leak on the pearsall pipeline downstream of dilley station near wilson ranch. The pipeline was shut-in at approximately 11:36 based on this information. While in route to investigate, a harvest operator identified signs of a leak near shiner ranch at approximately 12:20. Preventative measure to keep from reoccurring the in-line inspection (ili) scheduled for 2021 was accelerated to 2018 as a result of a leak that occurred on november 14, 2017. These leaks were identified during progressive cleaning operations in preparation for the ili. The line was shut down and temporary repair clamps were installed on the leak locations. Contaminated soils were removed and progressive cleaning operations continued. The ili was completed april 19, 2018. Based on the 2018 ili data, approximately 8.5 miles of pipe was replaced. The line was placed back into service on august 20, 2018. 3f & 3g: this pipeline was acquired from another operator. The pipe manufacturer and year of manufacture is not known
Report Received Date 2019-05-31 00:00:00
Iyear 2018
Report Number 20190176
Supplemental Number 33219
Report Type Supplemental Final
Operator Id 30782 PHMSA Enforcement
Name Harvest Midstream Company
Operator Street Address 1111 Travis
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2018-04-11 12:20:00
Location Latitude 28.659741 Google Maps OpenStreetMap
Location Longitude -99.049428 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 1
Recovered Bbls 1
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2018-04-11 12:20:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2018-04-11 11:36:00
Restart Datetime 2018-08-22 10:56:00
On Site Datetime 2018-04-11 12:20:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Pearsall Pipeline (Downstream Of Dilley Station)
Segment Name Shiner Ranch
Onshore State Abbreviation Tx
Onshore Postal Code 78014
Onshore City Name Not Within A Municipality
Onshore County Name Frio
Designated Location Milepost/valve Station
Designated Name Row
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 36
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 10
Pipe Wall Thickness 0.188
Pipe Smys 60000
Pipe Specification Api 5lx
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Other
Pipe Coating Details Polyken Tape Coating
Installation Year 1990
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 65
Est Cost Prop Damage 6821
Est Cost Emergency 500
Est Cost Environmental 2075
Est Cost Other 0
Prpty 9461
Accident Psig 457
Mop Psig 780
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 114945
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The pin hole leak was caused by internal corrosion
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Water Acid Ind Yes
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Yes
Corrosion Coupons Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2018
Geometry Recent Year 2018
Other Recent Year 2018
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2007
Hydrtst Most Rcnt Pressure 1151
Direct Asmnt Conducted No
Non Destructive Exam Ind Yes
Exm Other Type Visual
Exm Other Rcnt Year 2018
Exm Other Rcnt Ind Yes
Preparer Name T*** S* B****
Preparer Title Sr. Regulatory Compliance Specialist
Preparer Email T******@h***************.com
Preparer Telephone 713.289.2688
Prepared Date 2020-01-22 00:00:00
Authorizer Name T*** S* B****
Authorizer Telephone 713.289.2688
Authorizer Title Sr. Regulatory Compliance Specialist
Authorizer Email T******@h***************.com
Narrative At the time of this release harvest viewed it as related to a pipeline maintenance activity (pigging), and originally believed that the reporting exception in 195.50(b) applied. After discussing this release with the txrrc and reviewing the rulemaking history for the rule, harvest now believes that the intent of the rule is to exempt planned or reasonably expected releases from maintenance activity (for example, releases from a pig trap during pigging). The release in this instance was associated with a pigging activity, but ultimately was caused by internal corrosion on the pipe body. Harvest made a good faith mistake and is filing this report to correct it. There were two accidents that were identified on the pearsall pipeline downstream of dilley station on april 11, 2018. This report is associated with the accident that occurred at shiner ranch. This spill was less than 1bbls and associated cost less than $50,000; therefore, immediate notification to the nrc was not required. On april 11th at approximately 11:02 aerial patrol identified signs of a leak on the pearsall pipeline downstream of dilley station near wilson ranch. The pipeline was shut-in at approximately 11:36 based on this information. While in route to investigate, a harvest operator identified signs of a leak near shiner ranch at approximately 12:20. Preventative measure to keep from reoccurring the in-line inspection (ili) scheduled for 2021 was accelerated to 2018 as a result of a leak that occurred on november 14, 2017. These leaks were identified during progressive cleaning operations in preparation for the ili. The line was shut down and temporary repair clamps were installed on the leak locations. Contaminated soils were removed and progressive cleaning operations continued. The ili was completed april 19, 2018. Based on the 2018 ili data, approximately 8.5 miles of pipe was replaced. The line was placed back into service on august 20, 2018. 3f & 3g: this pipeline was acquired from another operator. The pipe manufacturer and year of manufacture is not known