HL incident on 2019-05-03 — TX

Operator
Kinder Morgan Liquid Terminals, Llc
Cause
Incorrect Operation
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2019-05-03 16:30
Report number
Location
TX
Narrative
On 5/3/2019, contractors had just completed a project to install two new valves and remove slip blinds that had been installed to isolate a new section of a header at the valve connection point. Upon completion of the installation, the contractor was going to pressure test a segment of pipe that had been slacked in preparation for making the connections. Even though, the newly installed valve connecting to the new section of the header appeared to be closed (flag on valve signaled closed), it was later found it had not seated properly. When the contractor applied nitrogen to the line in an attempt to do the pressure test, residual product in the slacked line was pushed through the unseated valve and onto the header where a slip blind had been removed. Unfortunately, the flange was still in the process of being reconnected so the bolts remained untightened, thereby allowing product to leak into secondary containment below. The inspector did not anticipate the valve leaking through, therefore, was not unduly concerned that the flange had not been reconnected to ensure a closed system. Plan to prevent reoccurrence: inspector has been suspended and will be retrained prior to returning to work. Process has been updated to include a requirement to fully close a system prior to pressure testing any installation on a regulated pipeline.
Detailed record list
Report Received Date
2019-05-31 00:00:00
Iyear
2019
Report Number
20190175
Supplemental Number
32227
Report Type
Original Final
Operator Id
Name
Kinder Morgan Liquid Terminals, Llc
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2019-05-03 16:30:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls
64
Recovered Bbls
64
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2019-05-03 16:30:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Release Did Not Impact The Operation Of The Facility
On Site Datetime
2019-05-03 16:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Pasadena Terminal
Segment Name
20b Tie-In At Nd Manifold
Onshore State Abbreviation
Tx
Onshore Postal Code
77506
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Flange Assembly
Installation Year
2019
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Commercially Nav Ind
Yes
Commercially Nav Yes No
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
6720
Est Cost Prop Damage
0
Est Cost Emergency
8000
Est Cost Environmental
0
Est Cost Other
0
Prpty
14720
Accident Psig
150
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
No
Scada Functional Ind
No
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Scada was disconnected from assets at the time for the installation of new valves.
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
Yes
Num Employees Tested
1
Num Employees Failed
0
Num Contractors Tested
1
Num Contractors Failed
0
Cause
Incorrect Operation
Cause Details
Equipment Not Installed Properly
Operation Type
Equipment Not Installed Properly
Related Failure Follow Ind
Yes
Category Type
Construction
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
D******* S*******
Preparer Title
Director Of Compliance Codes And Standards
Preparer Email
D****************@k***********.com
Preparer Telephone
7134206496
Prepared Date
2019-05-31 00:00:00
Authorizer Name
D******* S*******
Authorizer Telephone
7134206496
Authorizer Title
Director Of Compliance Codes And Standards
Authorizer Email
D****************@k***********.com
Narrative
On 5/3/2019, contractors had just completed a project to install two new valves and remove slip blinds that had been installed to isolate a new section of a header at the valve connection point. Upon completion of the installation, the contractor was going to pressure test a segment of pipe that had been slacked in preparation for making the connections. Even though, the newly installed valve connecting to the new section of the header appeared to be closed (flag on valve signaled closed), it was later found it had not seated properly. When the contractor applied nitrogen to the line in an attempt to do the pressure test, residual product in the slacked line was pushed through the unseated valve and onto the header where a slip blind had been removed. Unfortunately, the flange was still in the process of being reconnected so the bolts remained untightened, thereby allowing product to leak into secondary containment below. The inspector did not anticipate the valve leaking through, therefore, was not unduly concerned that the flange had not been reconnected to ensure a closed system. Plan to prevent reoccurrence: inspector has been suspended and will be retrained prior to returning to work. Process has been updated to include a requirement to fully close a system prior to pressure testing any installation on a regulated pipeline.
Report Received Date 2019-05-31 00:00:00
Iyear 2019
Report Number 20190175
Supplemental Number 32227
Report Type Original Final
Operator Id 26041 PHMSA Enforcement
Name Kinder Morgan Liquid Terminals, Llc
Operator Street Address 1001 Louisiana St, Suite 1000
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2019-05-03 16:30:00
Location Latitude 29.72536 Google Maps OpenStreetMap
Location Longitude -95.20334 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls 64
Recovered Bbls 64
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2019-05-03 16:30:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The Release Did Not Impact The Operation Of The Facility
On Site Datetime 2019-05-03 16:30:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Pasadena Terminal
Segment Name 20b Tie-In At Nd Manifold
Onshore State Abbreviation Tx
Onshore Postal Code 77506
Onshore City Name Pasadena
Onshore County Name Harris
Designated Location Milepost/valve Station
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Flange Assembly
Installation Year 2019
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Commercially Nav Ind Yes
Commercially Nav Yes No Yes
High Pop Ind Yes
High Pop Yes No Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 6720
Est Cost Prop Damage 0
Est Cost Emergency 8000
Est Cost Environmental 0
Est Cost Other 0
Prpty 14720
Accident Psig 150
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind No
Scada Functional Ind No
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Scada was disconnected from assets at the time for the installation of new valves.
Employee Drug Test Ind Yes
Contractor Drug Test Ind Yes
Num Employees Tested 1
Num Employees Failed 0
Num Contractors Tested 1
Num Contractors Failed 0
Cause Incorrect Operation
Cause Details Equipment Not Installed Properly
Operation Type Equipment Not Installed Properly
Related Failure Follow Ind Yes
Category Type Construction
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Preparer Name D******* S*******
Preparer Title Director Of Compliance Codes And Standards
Preparer Email D****************@k***********.com
Preparer Telephone 7134206496
Prepared Date 2019-05-31 00:00:00
Authorizer Name D******* S*******
Authorizer Telephone 7134206496
Authorizer Title Director Of Compliance Codes And Standards
Authorizer Email D****************@k***********.com
Narrative On 5/3/2019, contractors had just completed a project to install two new valves and remove slip blinds that had been installed to isolate a new section of a header at the valve connection point. Upon completion of the installation, the contractor was going to pressure test a segment of pipe that had been slacked in preparation for making the connections. Even though, the newly installed valve connecting to the new section of the header appeared to be closed (flag on valve signaled closed), it was later found it had not seated properly. When the contractor applied nitrogen to the line in an attempt to do the pressure test, residual product in the slacked line was pushed through the unseated valve and onto the header where a slip blind had been removed. Unfortunately, the flange was still in the process of being reconnected so the bolts remained untightened, thereby allowing product to leak into secondary containment below. The inspector did not anticipate the valve leaking through, therefore, was not unduly concerned that the flange had not been reconnected to ensure a closed system. Plan to prevent reoccurrence: inspector has been suspended and will be retrained prior to returning to work. Process has been updated to include a requirement to fully close a system prior to pressure testing any installation on a regulated pipeline.