GD incident on 2019-10-11 — WA
Operator
Puget Sound Energy
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
1 injury
Property damage (nominal)
$5,010
Incident datetime
2019-10-11 10:38
Report number
Location
WA, KING
Narrative
Pse responded to a call from the seattle fire department on a broken 2" pe gas main on october 11, 2019 at 10:38. Pse's gas first response (gfr) personnel arrived onsite at 10:55 and found that a contractor (seattle public utilities) had dug into the 2"pe pipeline with excavator. At 11:07, while gfr technicians were in the process of squeezing the pipeline to stop the flow of gas, ignition occurred. Three fitters sustained burns and were taken to harborview medical center and one was admitted to the hospital. Another gfr fitter that was already on site, controlled the situation at 12:10 by squeezing the pipeline in a separate hole on the north side of the damaged main and by turning off the valve on the south side. As a result, 18 customers lost service. Approximately 24 people were evacuated out of 4 structures. The buildings were cleared for re-entry at 13:13. Pse's contractor infrasource completed the repair at 18:25. Pse notified the washington utilities and transportation commission (wutc) at 11:44 on 10/11/2019 and the nrc at 14:57. A 48 hour follow up contact to the nrc was made on 10/14/2019 at 16:50 (nrc 1261117).
Detailed record list
Occurred At
2019-10-11 10:38:00
Year
2019
Report Received Date
2019-11-07 00:00:00
Iyear
2019.0
Report Number
20190127.0
Supplemental Number
32929.0
Report Type
Supplemental Final
Operator Id
22189
Name
Puget Sound Energy
Operator Street Address
355 110th Ave Ne
Operator City Name
Bellevue
Operator State Abbreviation
WA
Operator Postal Code
98004
Local Datetime
2019-10-11 10:38:00
Location Street Address
10315 Midvale Ave N
Location City Name
Seattle
Location County Name
King
Location State Abbreviation
WA
Location Postal Code
98133
Location Latitude
47.703736
Location Longitude
-122.343314
Nrc Rpt Datetime
2019-10-11 14:57:00
Nrc Rpt Num
1260896
Commodity Released Type
Natural Gas
Unintentional Release
110.16
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
1
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
0
Num Gp Injuries
0
Injure
1
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
24.0
Incident Identified Datetime
2019-10-11 10:38:00
On Site Datetime
2019-10-11 10:55:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
36.0
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
2008.0
Pipe Diameter
2.375
Pipe Specification
Astm D2513
Pipe Manufacturer
Performance Pipe
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Plastic Sdr
11
Material Pe Pipe Code
2708
Release Type
Mechanical Puncture
Puncture Axial
2.0
Puncture Circum
2.0
Class Location Type
Class 4 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
5010.0
Est Cost Emergency
3748.0
Est Cost Other
0.0
Est Cost Unintentional Release
980.0
Prpty
9738.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
18.0
Accident Psig
39.5
Normal Psig
39.8
Mop Psig
45.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Emergency Responder
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The injury occurred during the emergency response to damage caused by a third party contractor with excavator
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Utility
Excavator Equipment
Backhoe/trackhoe
Work Performed
Drainage
One Call Notified Ind
Yes
One Call Ticket Num
19445690
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
6.0
Root Cause Category
Excavation Issue
Root Cause Type
Improper Excavation Practice Not Listed Above
Preparer Name
M****** S*********
Preparer Title
Regulatory Compliance Analyst
Preparer Email
M*****************@p**.com
Preparer Telephone
425-457-5752
Authorizer Name
K***** D********
Authorizer Title
Manager Compliance And Quality Management
Authorizer Telephone
425-462-3748
Authorizer Email
K***************@p**.com
Narrative
Pse responded to a call from the seattle fire department on a broken 2" pe gas main on october 11, 2019 at 10:38. Pse's gas first response (gfr) personnel arrived onsite at 10:55 and found that a contractor (seattle public utilities) had dug into the 2"pe pipeline with excavator. At 11:07, while gfr technicians were in the process of squeezing the pipeline to stop the flow of gas, ignition occurred. Three fitters sustained burns and were taken to harborview medical center and one was admitted to the hospital. Another gfr fitter that was already on site, controlled the situation at 12:10 by squeezing the pipeline in a separate hole on the north side of the damaged main and by turning off the valve on the south side. As a result, 18 customers lost service. Approximately 24 people were evacuated out of 4 structures. The buildings were cleared for re-entry at 13:13. Pse's contractor infrasource completed the repair at 18:25. Pse notified the washington utilities and transportation commission (wutc) at 11:44 on 10/11/2019 and the nrc at 14:57. A 48 hour follow up contact to the nrc was made on 10/14/2019 at 16:50 (nrc 1261117).
| Occurred At | 2019-10-11 10:38:00 |
|---|---|
| Year | 2019 |
| Report Received Date | 2019-11-07 00:00:00 |
| Iyear | 2019.0 |
| Report Number | 20190127.0 |
| Supplemental Number | 32929.0 |
| Report Type | Supplemental Final |
| Operator Id | 22189 PHMSA Enforcement |
| Name | Puget Sound Energy |
| Operator Street Address | 355 110th Ave Ne |
| Operator City Name | Bellevue |
| Operator State Abbreviation | WA |
| Operator Postal Code | 98004 |
| Local Datetime | 2019-10-11 10:38:00 |
| Location Street Address | 10315 Midvale Ave N |
| Location City Name | Seattle |
| Location County Name | King |
| Location State Abbreviation | WA |
| Location Postal Code | 98133 |
| Location Latitude | 47.703736 Google Maps OpenStreetMap |
| Location Longitude | -122.343314 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2019-10-11 14:57:00 |
| Nrc Rpt Num | 1260896 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 110.16 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | Yes |
| Num Emp Injuries | 1 |
| Num Contr Injuries | 0 |
| Num Er Injuries | 0 |
| Num Worker Injuries | 0 |
| Num Gp Injuries | 0 |
| Injure | 1 |
| Ignite Ind | Yes |
| Explode Ind | No |
| Num Pub Evacuated | 24.0 |
| Incident Identified Datetime | 2019-10-11 10:38:00 |
| On Site Datetime | 2019-10-11 10:55:00 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 36.0 |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Main |
| Installation Year | 2008.0 |
| Pipe Diameter | 2.375 |
| Pipe Specification | Astm D2513 |
| Pipe Manufacturer | Performance Pipe |
| Material Involved | Plastic |
| Plastic Type | Polyethylene (Pe) |
| Plastic Sdr | 11 |
| Material Pe Pipe Code | 2708 |
| Release Type | Mechanical Puncture |
| Puncture Axial | 2.0 |
| Puncture Circum | 2.0 |
| Class Location Type | Class 4 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 5010.0 |
| Est Cost Emergency | 3748.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 980.0 |
| Prpty | 9738.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 18.0 |
| Accident Psig | 39.5 |
| Normal Psig | 39.8 |
| Mop Psig | 45.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | No |
| Accident Identifier | Notification From Emergency Responder |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The injury occurred during the emergency response to damage caused by a third party contractor with excavator |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| Notify Cga Dirt | No |
| Public Row Ind | Yes |
| Public Subtype | City Street |
| Excavator Type | Utility |
| Excavator Equipment | Backhoe/trackhoe |
| Work Performed | Drainage |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 19445690 |
| Locator Type | Contract Locator |
| Visible Marks | Yes |
| Service Interruption | Yes |
| Service Interruption Hours | 6.0 |
| Root Cause Category | Excavation Issue |
| Root Cause Type | Improper Excavation Practice Not Listed Above |
| Preparer Name | M****** S********* |
| Preparer Title | Regulatory Compliance Analyst |
| Preparer Email | M*****************@p**.com |
| Preparer Telephone | 425-457-5752 |
| Authorizer Name | K***** D******** |
| Authorizer Title | Manager Compliance And Quality Management |
| Authorizer Telephone | 425-462-3748 |
| Authorizer Email | K***************@p**.com |
| Narrative | Pse responded to a call from the seattle fire department on a broken 2" pe gas main on october 11, 2019 at 10:38. Pse's gas first response (gfr) personnel arrived onsite at 10:55 and found that a contractor (seattle public utilities) had dug into the 2"pe pipeline with excavator. At 11:07, while gfr technicians were in the process of squeezing the pipeline to stop the flow of gas, ignition occurred. Three fitters sustained burns and were taken to harborview medical center and one was admitted to the hospital. Another gfr fitter that was already on site, controlled the situation at 12:10 by squeezing the pipeline in a separate hole on the north side of the damaged main and by turning off the valve on the south side. As a result, 18 customers lost service. Approximately 24 people were evacuated out of 4 structures. The buildings were cleared for re-entry at 13:13. Pse's contractor infrasource completed the repair at 18:25. Pse notified the washington utilities and transportation commission (wutc) at 11:44 on 10/11/2019 and the nrc at 14:57. A 48 hour follow up contact to the nrc was made on 10/14/2019 at 16:50 (nrc 1261117). |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA