Incident details
Operator, cause, commodity and consequences with raw source fields.
GD incident on 2019-08-14 — MI
Operator
Consumers Energy Co
Cause
Locating Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$294,600
Incident datetime
2019-08-14 15:56
Report number
Location
MI, SAGINAW
Narrative
On august 14, 2019 at approximately 15:56 hours consumers energy (ce) was notified of damage to a 12" steel medium pressure natural gas pipeline. The pipeline was struck by a trenching machine being used to install drain tile in a farm field. The damage occurred near 4675 hackett road, saginaw (saginaw county) michigan. A gas service worker (gsw) and distribution crew arrived at approximately 16:35 and 16:41 hours respectively. The gsw monitored the site continuously until the damaged pipeline segment was isolated and the blowing gas contained. Police and fire personnel were onsite and portions of the road were closed as a safety precaution. There were no fatalities or injuries as a result of the damage. The pipeline was isolated at approximately 19:17 hours by squeezing an 8" plastic pipeline at the consumers energy's zilwaukee city gate (cut and cap north of the damage) and closing valve m1312 to the south of the damage location. Once the pipeline was isolated and blowing gas contained, a location upstream of valve m1312 was cut and capped. An incident investigation determined the root cause as a third party damage. Several factors that may have contributed to the damage were also identified as follows (1) facility not located or marked - the one call ticket positive response 001(no conflict) was provided by the staking contractor following a conversation with a representative of the company installing drain tiles. (2) unclear communication between the ce staking contractor and the contractor installing the drainage tile. The staking technician spoke with contractor and was advised (per documented notes) the entire square doesn't need to be marked he needs the field east of hackett that isn't planted marked. Approximately 40' of 12" steel medium pressure pipeline was replaced between the zilwaukee city gate (north isolation point) and the southerly isolation point near valve m1312. Following the pipeline installation, temporary odorization equipment was installed to ensure adequate odor intensity as a result of derating from transmission pipeline. On july 20th at approximately 15:00 hours, crews turned the odorization equipment on and opened valves to introduce gas flow on the pipeline, returning the pipeline to normal operations.
Detailed record list
Occurred At
2019-08-14 15:56:00
Year
2019
Report Received Date
2019-09-13 00:00:00
Iyear
2019.0
Report Number
20190101.0
Supplemental Number
34389.0
Report Type
Supplemental Final
Operator Id
2748
Name
Consumers Energy Co
Operator Street Address
One Energy Plaza
Operator City Name
Jackson
Operator State Abbreviation
MI
Operator Postal Code
49201
Local Datetime
2019-08-14 15:56:00
Location Street Address
4675 Hackett Road
Location City Name
Saginaw
Location County Name
Saginaw
Location State Abbreviation
MI
Location Postal Code
48603
Location Latitude
43.47672
Location Longitude
-84.069948
Nrc Rpt Datetime
2019-08-16 12:10:00
Nrc Rpt Num
1255353
Commodity Released Type
Natural Gas
Unintentional Release
2511.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2019-08-14 15:56:00
On Site Datetime
2019-08-14 16:35:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
55.0
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1942.0
Pipe Diameter
12.0
Pipe Specification
Api 5l
Pipe Manufacturer
National Tube
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Wt Steel
0.203
Release Type
Mechanical Puncture
Puncture Axial
12.0
Puncture Circum
6.0
Class Location Type
Class 2 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
294600.0
Est Cost Emergency
167.0
Est Cost Other
0.0
Est Cost Unintentional Release
5750.0
Prpty
300517.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
55.0
Normal Psig
55.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Landowner
Excavator Type
Contractor
Excavator Equipment
Trencher
Work Performed
Drainage
One Call Notified Ind
Yes
One Call Ticket Num
91981987
Locator Type
Contract Locator
Visible Marks
No
Service Interruption
No
Root Cause Category
Locating Issue
Root Cause Type
Facility Not Marked Due To Locator Error
Preparer Name
C******* K***
Preparer Title
Senior Engineering Technical Analyst Ii
Preparer Email
C************@c********.com
Preparer Telephone
989-280-2963
Authorizer Name
J**** P****
Authorizer Title
Gas Compliance Lead
Authorizer Telephone
989-791-5749
Authorizer Email
J**********@c********.com
Narrative
On august 14, 2019 at approximately 15:56 hours consumers energy (ce) was notified of damage to a 12" steel medium pressure natural gas pipeline. The pipeline was struck by a trenching machine being used to install drain tile in a farm field. The damage occurred near 4675 hackett road, saginaw (saginaw county) michigan. A gas service worker (gsw) and distribution crew arrived at approximately 16:35 and 16:41 hours respectively. The gsw monitored the site continuously until the damaged pipeline segment was isolated and the blowing gas contained. Police and fire personnel were onsite and portions of the road were closed as a safety precaution. There were no fatalities or injuries as a result of the damage. The pipeline was isolated at approximately 19:17 hours by squeezing an 8" plastic pipeline at the consumers energy's zilwaukee city gate (cut and cap north of the damage) and closing valve m1312 to the south of the damage location. Once the pipeline was isolated and blowing gas contained, a location upstream of valve m1312 was cut and capped. An incident investigation determined the root cause as a third party damage. Several factors that may have contributed to the damage were also identified as follows (1) facility not located or marked - the one call ticket positive response 001(no conflict) was provided by the staking contractor following a conversation with a representative of the company installing drain tiles. (2) unclear communication between the ce staking contractor and the contractor installing the drainage tile. The staking technician spoke with contractor and was advised (per documented notes) the entire square doesn't need to be marked he needs the field east of hackett that isn't planted marked. Approximately 40' of 12" steel medium pressure pipeline was replaced between the zilwaukee city gate (north isolation point) and the southerly isolation point near valve m1312. Following the pipeline installation, temporary odorization equipment was installed to ensure adequate odor intensity as a result of derating from transmission pipeline. On july 20th at approximately 15:00 hours, crews turned the odorization equipment on and opened valves to introduce gas flow on the pipeline, returning the pipeline to normal operations.
| Occurred At | 2019-08-14 15:56:00 |
|---|---|
| Year | 2019 |
| Report Received Date | 2019-09-13 00:00:00 |
| Iyear | 2019.0 |
| Report Number | 20190101.0 |
| Supplemental Number | 34389.0 |
| Report Type | Supplemental Final |
| Operator Id | 2748 PHMSA Enforcement |
| Name | Consumers Energy Co |
| Operator Street Address | One Energy Plaza |
| Operator City Name | Jackson |
| Operator State Abbreviation | MI |
| Operator Postal Code | 49201 |
| Local Datetime | 2019-08-14 15:56:00 |
| Location Street Address | 4675 Hackett Road |
| Location City Name | Saginaw |
| Location County Name | Saginaw |
| Location State Abbreviation | MI |
| Location Postal Code | 48603 |
| Location Latitude | 43.47672 Google Maps OpenStreetMap |
| Location Longitude | -84.069948 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2019-08-16 12:10:00 |
| Nrc Rpt Num | 1255353 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 2511.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2019-08-14 15:56:00 |
| On Site Datetime | 2019-08-14 16:35:00 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 55.0 |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Main |
| Installation Year | 1942.0 |
| Pipe Diameter | 12.0 |
| Pipe Specification | Api 5l |
| Pipe Manufacturer | National Tube |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Unknown |
| Wt Steel | 0.203 |
| Release Type | Mechanical Puncture |
| Puncture Axial | 12.0 |
| Puncture Circum | 6.0 |
| Class Location Type | Class 2 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 294600.0 |
| Est Cost Emergency | 167.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 5750.0 |
| Prpty | 300517.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Accident Psig | 55.0 |
| Normal Psig | 55.0 |
| Mop Psig | 60.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | No |
| Accident Identifier | Notification From Third Party That Caused The Incident |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the incident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| Notify Cga Dirt | Yes |
| Private Row Ind | Yes |
| Private Subtype | Private Landowner |
| Excavator Type | Contractor |
| Excavator Equipment | Trencher |
| Work Performed | Drainage |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 91981987 |
| Locator Type | Contract Locator |
| Visible Marks | No |
| Service Interruption | No |
| Root Cause Category | Locating Issue |
| Root Cause Type | Facility Not Marked Due To Locator Error |
| Preparer Name | C******* K*** |
| Preparer Title | Senior Engineering Technical Analyst Ii |
| Preparer Email | C************@c********.com |
| Preparer Telephone | 989-280-2963 |
| Authorizer Name | J**** P**** |
| Authorizer Title | Gas Compliance Lead |
| Authorizer Telephone | 989-791-5749 |
| Authorizer Email | J**********@c********.com |
| Narrative | On august 14, 2019 at approximately 15:56 hours consumers energy (ce) was notified of damage to a 12" steel medium pressure natural gas pipeline. The pipeline was struck by a trenching machine being used to install drain tile in a farm field. The damage occurred near 4675 hackett road, saginaw (saginaw county) michigan. A gas service worker (gsw) and distribution crew arrived at approximately 16:35 and 16:41 hours respectively. The gsw monitored the site continuously until the damaged pipeline segment was isolated and the blowing gas contained. Police and fire personnel were onsite and portions of the road were closed as a safety precaution. There were no fatalities or injuries as a result of the damage. The pipeline was isolated at approximately 19:17 hours by squeezing an 8" plastic pipeline at the consumers energy's zilwaukee city gate (cut and cap north of the damage) and closing valve m1312 to the south of the damage location. Once the pipeline was isolated and blowing gas contained, a location upstream of valve m1312 was cut and capped. An incident investigation determined the root cause as a third party damage. Several factors that may have contributed to the damage were also identified as follows (1) facility not located or marked - the one call ticket positive response 001(no conflict) was provided by the staking contractor following a conversation with a representative of the company installing drain tiles. (2) unclear communication between the ce staking contractor and the contractor installing the drainage tile. The staking technician spoke with contractor and was advised (per documented notes) the entire square doesn't need to be marked he needs the field east of hackett that isn't planted marked. Approximately 40' of 12" steel medium pressure pipeline was replaced between the zilwaukee city gate (north isolation point) and the southerly isolation point near valve m1312. Following the pipeline installation, temporary odorization equipment was installed to ensure adequate odor intensity as a result of derating from transmission pipeline. On july 20th at approximately 15:00 hours, crews turned the odorization equipment on and opened valves to introduce gas flow on the pipeline, returning the pipeline to normal operations. |