Narrative
On may 21, 2019 at approximately 16:00 hours a consumers energy distribution crew damaged a 2" plastic medium pressure natural gas pipeline during a pipeline lowering project. The pipeline is located near 3369 antigua drive, auburn hills, michigan (oakland county). The incident was reported to the nrc and mpsc as 3355 kassandra way, auburn hills, michigan per consumers energy's sims record(service card record). While attempting to expose the pipeline damage, the operator made contact with the electric service line (located in a joint trench with approximately 19.5" separation) causing the blowing gas to ignite. The employee operating the excavation equipment was injured and the equipment and building under construction were significantly damaged by fire. A gas service worker (gsw) arrived at approximately 16:19 hours and began monitoring the surrounding building for gas migration. The gsw's continuously monitored the site until the fire was extinguished and the pipeline was capped. The distribution crew arrived at approximately 17:18 hours, the pipeline was squeezed at two remote locations stopping gas from blowing. Once the fire was extinguished, the pipeline was cut and capped and the area was secured for further investigation. On may 22, 2019 a crew returned to the antigua location to remove the damaged portion of the pipeline and the excavating equipment. The damaged portion of the pipe was transported to the consumers energy royal oak service center and stored in a secure location for future investigation. The damaged section of pipeline was replaced by installing (open trenching) 208' of 2" plastic pipeline at the appropriate depth. Normal operations resumed on may 24, 2019 at approximately 16:00 hours. An rca team was assembled to investigate the details of the incident, determine the root cause and/or contributing factors and implement measures to prevent future occurrences. The results of the investigation will be provided to the michigan public service commission (mpsc) upon completion.
Detailed record list
Occurred At
2019-05-21 16:00:00
Year
2019
Report Received Date
2019-06-20 00:00:00
Iyear
2019.0
Report Number
20190061.0
Supplemental Number
32521.0
Report Type
Supplemental Final
Operator Id
Name
Consumers Energy Co
Operator Street Address
One Energy Plaza
Operator City Name
Jackson
Operator State Abbreviation
MI
Operator Postal Code
49201
Local Datetime
2019-05-21 16:00:00
Location Street Address
3369 Antigua
Location City Name
Auburn Hills
Location County Name
Oakland
Location State Abbreviation
MI
Location Postal Code
48236
Location Latitude
Location Longitude
Nrc Rpt Datetime
2019-05-21 17:00:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
154.47
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
1
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
0
Num Gp Injuries
0
Injure
1
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2019-05-21 16:00:00
On Site Datetime
2019-05-21 16:00:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
12.0
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
2016.0
Pipe Diameter
2.0
Pipe Specification
Astm D2513
Pipe Manufacturer
Performance Pipe
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Plastic Sdr
20
Material Pe Pipe Code
2708
Release Type
Mechanical Puncture
Puncture Axial
0.5
Puncture Circum
2.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
55000.0
Est Cost Prop Damage
63846.0
Est Cost Emergency
1357.0
Est Cost Other
0.0
Est Cost Unintentional Release
394.0
Prpty
120597.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
54.0
Normal Psig
55.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
Yes
Num Employees Tested
1
Num Employees Failed
0
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator (First Party)
Ex Party Type
Excavation Damage By Operator (First Party)
Notify Cga Dirt
Yes
Pipeline Easement Row Ind
Yes
Excavator Type
Utility
Excavator Equipment
Backhoe/trackhoe
Work Performed
Natural Gas
One Call Notified Ind
Yes
One Call Ticket Num
91360018
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
No
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
C******* K***
Preparer Email
C************@c********.com
Preparer Telephone
989-280-2963
Authorizer Name
J**** P****
Authorizer Title
Gas Compliance Lead
Authorizer Telephone
989-791-5749
Authorizer Email
J**********@c********.com
Narrative
On may 21, 2019 at approximately 16:00 hours a consumers energy distribution crew damaged a 2" plastic medium pressure natural gas pipeline during a pipeline lowering project. The pipeline is located near 3369 antigua drive, auburn hills, michigan (oakland county). The incident was reported to the nrc and mpsc as 3355 kassandra way, auburn hills, michigan per consumers energy's sims record(service card record). While attempting to expose the pipeline damage, the operator made contact with the electric service line (located in a joint trench with approximately 19.5" separation) causing the blowing gas to ignite. The employee operating the excavation equipment was injured and the equipment and building under construction were significantly damaged by fire. A gas service worker (gsw) arrived at approximately 16:19 hours and began monitoring the surrounding building for gas migration. The gsw's continuously monitored the site until the fire was extinguished and the pipeline was capped. The distribution crew arrived at approximately 17:18 hours, the pipeline was squeezed at two remote locations stopping gas from blowing. Once the fire was extinguished, the pipeline was cut and capped and the area was secured for further investigation. On may 22, 2019 a crew returned to the antigua location to remove the damaged portion of the pipeline and the excavating equipment. The damaged portion of the pipe was transported to the consumers energy royal oak service center and stored in a secure location for future investigation. The damaged section of pipeline was replaced by installing (open trenching) 208' of 2" plastic pipeline at the appropriate depth. Normal operations resumed on may 24, 2019 at approximately 16:00 hours. An rca team was assembled to investigate the details of the incident, determine the root cause and/or contributing factors and implement measures to prevent future occurrences. The results of the investigation will be provided to the michigan public service commission (mpsc) upon completion.
Occurred At 2019-05-21 16:00:00
Year 2019
Report Received Date 2019-06-20 00:00:00
Iyear 2019.0
Report Number 20190061.0
Supplemental Number 32521.0
Report Type Supplemental Final
Operator Id 2748 PHMSA Enforcement
Name Consumers Energy Co
Operator Street Address One Energy Plaza
Operator City Name Jackson
Operator State Abbreviation MI
Operator Postal Code 49201
Local Datetime 2019-05-21 16:00:00
Location Street Address 3369 Antigua
Location City Name Auburn Hills
Location County Name Oakland
Location State Abbreviation MI
Location Postal Code 48236
Location Latitude 42.690709 Google Maps OpenStreetMap
Location Longitude -83.304207 Google Maps OpenStreetMap
Nrc Rpt Datetime 2019-05-21 17:00:00
Nrc Rpt Num 1246382 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 154.47
Fatality Ind No
Fatal 0
Injury Ind Yes
Num Emp Injuries 1
Num Contr Injuries 0
Num Er Injuries 0
Num Worker Injuries 0
Num Gp Injuries 0
Injure 1
Ignite Ind Yes
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2019-05-21 16:00:00
On Site Datetime 2019-05-21 16:00:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 12.0
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 2016.0
Pipe Diameter 2.0
Pipe Specification Astm D2513
Pipe Manufacturer Performance Pipe
Material Involved Plastic
Plastic Type Polyethylene (Pe)
Plastic Sdr 20
Material Pe Pipe Code 2708
Release Type Mechanical Puncture
Puncture Axial 0.5
Puncture Circum 2.0
Class Location Type Class 3 Location
Est Cost Oper Paid 55000.0
Est Cost Prop Damage 63846.0
Est Cost Emergency 1357.0
Est Cost Other 0.0
Est Cost Unintentional Release 394.0
Prpty 120597.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 0.0
Accident Psig 54.0
Normal Psig 55.0
Mop Psig 60.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind Yes
Num Employees Tested 1
Num Employees Failed 0
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Operator (First Party)
Ex Party Type Excavation Damage By Operator (First Party)
Notify Cga Dirt Yes
Pipeline Easement Row Ind Yes
Excavator Type Utility
Excavator Equipment Backhoe/trackhoe
Work Performed Natural Gas
One Call Notified Ind Yes
One Call Ticket Num 91360018
Locator Type Utility Owner
Visible Marks Yes
Service Interruption No
Root Cause Category Excavation Issue
Root Cause Type Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name C******* K***
Preparer Email C************@c********.com
Preparer Telephone 989-280-2963
Authorizer Name J**** P****
Authorizer Title Gas Compliance Lead
Authorizer Telephone 989-791-5749
Authorizer Email J**********@c********.com
Narrative On may 21, 2019 at approximately 16:00 hours a consumers energy distribution crew damaged a 2" plastic medium pressure natural gas pipeline during a pipeline lowering project. The pipeline is located near 3369 antigua drive, auburn hills, michigan (oakland county). The incident was reported to the nrc and mpsc as 3355 kassandra way, auburn hills, michigan per consumers energy's sims record(service card record). While attempting to expose the pipeline damage, the operator made contact with the electric service line (located in a joint trench with approximately 19.5" separation) causing the blowing gas to ignite. The employee operating the excavation equipment was injured and the equipment and building under construction were significantly damaged by fire. A gas service worker (gsw) arrived at approximately 16:19 hours and began monitoring the surrounding building for gas migration. The gsw's continuously monitored the site until the fire was extinguished and the pipeline was capped. The distribution crew arrived at approximately 17:18 hours, the pipeline was squeezed at two remote locations stopping gas from blowing. Once the fire was extinguished, the pipeline was cut and capped and the area was secured for further investigation. On may 22, 2019 a crew returned to the antigua location to remove the damaged portion of the pipeline and the excavating equipment. The damaged portion of the pipe was transported to the consumers energy royal oak service center and stored in a secure location for future investigation. The damaged section of pipeline was replaced by installing (open trenching) 208' of 2" plastic pipeline at the appropriate depth. Normal operations resumed on may 24, 2019 at approximately 16:00 hours. An rca team was assembled to investigate the details of the incident, determine the root cause and/or contributing factors and implement measures to prevent future occurrences. The results of the investigation will be provided to the michigan public service commission (mpsc) upon completion.