HL incident on 2018-11-29 — TX
Operator
Phillips 66 Pipeline Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$20,000
Incident datetime
2018-11-29 18:53
Report number
Location
TX
Narrative
On 11/29/2018 at 18:53 while lo01 was running in steady state elk city unit 2 shut down on suction pressure low low. The line was immediately shutdown and blocked in. The field, lead and supervisor were notified. Field dispatched to investigate. Release was confirmed by field personnel at app. 10:15. Notifications were made and emergency response activities initiated. Release was due to failure of the long seam. Pipe segment was cut out and replaced on 12-1-2018. Line was recommissioned and returned to service on 12-2-2018. Removed section of piping was sent to lab for metallurgical analysis. G5, item #4 "additional factors" is undetermined for now until the metallurgical analysis is complete. The report will be supplemented upon establishment of failure mode. 2019-02-04 - updated part g, section 5, questions 1, 2, 4 and 5a bases on receipt of draft metallurgical analysis results on 1-25-2019. Updated part e, question 9. Preliminary metallurgical analysis indicates the failure was due to operational pressure cycle fatigue growth that originated from an internal hook crack manufacturing defect. 2019-4-1 - updated part e, items 1 and 2 with more accurate pressure at the point and time of failure and mop at the point and time of failure, per PHMSA request.
Detailed record list
Report Received Date
2018-12-20 00:00:00
Iyear
2018
Report Number
20180396
Supplemental Number
31881
Report Type
Supplemental Final
Operator Id
31684
Name
Phillips 66 Pipeline Llc
Operator Street Address
2331 Citywest Blvd
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2018-11-29 18:53:00
Location Latitude
35.443915
Location Longitude
-99.387162
Commodity Released Type
Crude Oil
Unintentional Release Bbls
672
Recovered Bbls
672
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2018-11-29 18:53:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-11-29 18:56:00
Restart Datetime
2018-12-02 17:45:00
On Site Datetime
2018-11-29 22:15:00
Nrc Rpt Datetime
2018-11-29 20:11:00
Nrc Rpt Num
1231662
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Automatic
Num Pub Evacuated
0
Pipe Fac Name
Lo-01, Line O
Segment Name
Elk City To State Line
Onshore State Abbreviation
Ok
Onshore Postal Code
73644
Onshore City Name
Elk City
Onshore County Name
Beckham
Designated Location
Milepost/valve Station
Designated Name
Mp 116
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
28
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
10
Pipe Wall Thickness
0.203
Pipe Smys
42000
Pipe Specification
Api5l
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Republic
Pipe Coating Type
Coal Tar
Installation Year
1951
Manufactured Year
1951
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
1.5
Rupture Length
27.5
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
10000
Est Cost Gas Released
25000
Est Cost Prop Damage
20000
Est Cost Emergency
400000
Est Cost Environmental
5000
Est Cost Other
0
Prpty
460000
Accident Psig
1106.7
Mop Psig
1117
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
187500
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Fatigue Vibr Related
Yes
Failure Subtype
Pressure-Related
Additional Crack Ind
Yes
Collected Data Ind
Yes
Emat Ind
Yes
Emat Recent Year
2014
Other Recent Year
2016
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2006
Hydrtst Most Rcnt Pressure
1500
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
J*** B*********
Preparer Title
Dot Coordinator
Preparer Email
J**************@p**.com
Preparer Telephone
580-767-4206
Prepared Date
2019-04-01 00:00:00
Authorizer Name
T*** F****
Authorizer Telephone
832-765-1632
Authorizer Title
Dot Director
Authorizer Email
T***********@p**.com
Narrative
On 11/29/2018 at 18:53 while lo01 was running in steady state elk city unit 2 shut down on suction pressure low low. The line was immediately shutdown and blocked in. The field, lead and supervisor were notified. Field dispatched to investigate. Release was confirmed by field personnel at app. 10:15. Notifications were made and emergency response activities initiated. Release was due to failure of the long seam. Pipe segment was cut out and replaced on 12-1-2018. Line was recommissioned and returned to service on 12-2-2018. Removed section of piping was sent to lab for metallurgical analysis. G5, item #4 "additional factors" is undetermined for now until the metallurgical analysis is complete. The report will be supplemented upon establishment of failure mode. 2019-02-04 - updated part g, section 5, questions 1, 2, 4 and 5a bases on receipt of draft metallurgical analysis results on 1-25-2019. Updated part e, question 9. Preliminary metallurgical analysis indicates the failure was due to operational pressure cycle fatigue growth that originated from an internal hook crack manufacturing defect. 2019-4-1 - updated part e, items 1 and 2 with more accurate pressure at the point and time of failure and mop at the point and time of failure, per PHMSA request.
| Report Received Date | 2018-12-20 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180396 |
| Supplemental Number | 31881 |
| Report Type | Supplemental Final |
| Operator Id | 31684 PHMSA Enforcement |
| Name | Phillips 66 Pipeline Llc |
| Operator Street Address | 2331 Citywest Blvd |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77042 |
| Local Datetime | 2018-11-29 18:53:00 |
| Location Latitude | 35.443915 Google Maps OpenStreetMap |
| Location Longitude | -99.387162 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 672 |
| Recovered Bbls | 672 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2018-11-29 18:53:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2018-11-29 18:56:00 |
| Restart Datetime | 2018-12-02 17:45:00 |
| On Site Datetime | 2018-11-29 22:15:00 |
| Nrc Rpt Datetime | 2018-11-29 20:11:00 |
| Nrc Rpt Num | 1231662 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Automatic |
| Downstream Valve Type Ind | Automatic |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Lo-01, Line O |
| Segment Name | Elk City To State Line |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 73644 |
| Onshore City Name | Elk City |
| Onshore County Name | Beckham |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp 116 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 28 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Seam |
| Pipe Diameter | 10 |
| Pipe Wall Thickness | 0.203 |
| Pipe Smys | 42000 |
| Pipe Specification | Api5l |
| Pipe Seam Type | Erw - Low Frequency |
| Pipe Manufacturer | Republic |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1951 |
| Manufactured Year | 1951 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Width | 1.5 |
| Rupture Length | 27.5 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 10000 |
| Est Cost Gas Released | 25000 |
| Est Cost Prop Damage | 20000 |
| Est Cost Emergency | 400000 |
| Est Cost Environmental | 5000 |
| Est Cost Other | 0 |
| Prpty | 460000 |
| Accident Psig | 1106.7 |
| Mop Psig | 1117 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 187500 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | Yes |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Metallurgical Ind | Yes |
| Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Fatigue Vibr Related | Yes |
| Failure Subtype | Pressure-Related |
| Additional Crack Ind | Yes |
| Collected Data Ind | Yes |
| Emat Ind | Yes |
| Emat Recent Year | 2014 |
| Other Recent Year | 2016 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2006 |
| Hydrtst Most Rcnt Pressure | 1500 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | J*** B********* |
| Preparer Title | Dot Coordinator |
| Preparer Email | J**************@p**.com |
| Preparer Telephone | 580-767-4206 |
| Prepared Date | 2019-04-01 00:00:00 |
| Authorizer Name | T*** F**** |
| Authorizer Telephone | 832-765-1632 |
| Authorizer Title | Dot Director |
| Authorizer Email | T***********@p**.com |
| Narrative | On 11/29/2018 at 18:53 while lo01 was running in steady state elk city unit 2 shut down on suction pressure low low. The line was immediately shutdown and blocked in. The field, lead and supervisor were notified. Field dispatched to investigate. Release was confirmed by field personnel at app. 10:15. Notifications were made and emergency response activities initiated. Release was due to failure of the long seam. Pipe segment was cut out and replaced on 12-1-2018. Line was recommissioned and returned to service on 12-2-2018. Removed section of piping was sent to lab for metallurgical analysis. G5, item #4 "additional factors" is undetermined for now until the metallurgical analysis is complete. The report will be supplemented upon establishment of failure mode. 2019-02-04 - updated part g, section 5, questions 1, 2, 4 and 5a bases on receipt of draft metallurgical analysis results on 1-25-2019. Updated part e, question 9. Preliminary metallurgical analysis indicates the failure was due to operational pressure cycle fatigue growth that originated from an internal hook crack manufacturing defect. 2019-4-1 - updated part e, items 1 and 2 with more accurate pressure at the point and time of failure and mop at the point and time of failure, per PHMSA request. |