HL incident on 2018-11-28 — TX

Operator
Express Holdings (Usa), Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$70,000
Incident datetime
2018-11-28 12:54
Report number
Location
TX
Narrative
On november 28, 2018 at approximately 12:54 pm cst free oil and contaminated soil was discovered in an integrity dig excavation at mp 395 on line 41 upstream of holdrege station. The line was shut down and operations mobilized personnel with the spill response trailer and leak clamp. At 1:30 pm cst it was determined that repairs could exceed the $50,000 reporting threshold if it was a confirmed release. At 2:43 pm cst enbridge personnel arrived at the dig site and confirmed the potential release, but was unable to provide an estimate of oil released. The nrc was notified at 2:45 pm cst on november 28, 2018 (nrc# 1231534). At 3:42 pm cst it was initially estimated that one barrel of oil was released with the amount of free oil of one pint. After excavation of the contaminated soil that measured 36' long by 4' deep by 3' wide it was calculated that 1.5 barrels of oil was released. The 48 hour update was provided to the nrc at 4:58 pm cst on november 29, 2018 (nrc#1231647). Upon investigation, the cause of the failure was determined to be a through wall crack in the long seam. The crack was repaired by welding a full encirclement sleeve (type b) on the pipeline. No product was returned to the system and was recovered as contaminated soil. Approximately 34 tons of contaminated soil has been properly disposed of at an approved landfill.
Detailed record list
Report Received Date
2018-12-19 00:00:00
Iyear
2018
Report Number
20180392
Supplemental Number
31353
Report Type
Original Final
Operator Id
Name
Express Holdings (Usa), Llc
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2018-11-28 12:54:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1.5
Recovered Bbls
1.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2018-11-28 12:54:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-11-28 12:54:00
Restart Datetime
2018-11-29 21:34:00
On Site Datetime
2018-11-28 12:54:00
Nrc Rpt Datetime
2018-11-28 14:45:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Line 41b
Segment Name
Qg-Zj
Onshore State Abbreviation
Ne
Onshore Postal Code
68976
Onshore City Name
Smithfield
Onshore County Name
Gosper
Designated Location
Milepost/valve Station
Designated Name
395
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
20
Pipe Wall Thickness
0.312
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Flash Welded
Pipe Manufacturer
A.o. Smith
Pipe Coating Type
Coal Tar
Installation Year
1966
Manufactured Year
1966
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
35
Est Cost Prop Damage
70000
Est Cost Emergency
20000
Est Cost Environmental
50000
Est Cost Other
0
Prpty
140035
Accident Psig
491
Mop Psig
1116
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
Yes
Exceed Restriction Ind
No
Phmsa Restriction Ind
Not Mandated
Length Segment Isolated
210051
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
There was no controller involvement
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Fatigue Vibr Related
Yes
Failure Subtype
Pressure-Related
Additional Crack Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Emat Ind
Yes
Axial Recent Year
2015
Geometry Recent Year
2015
Emat Recent Year
2018
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1975
Hydrtst Most Rcnt Pressure
1370
Direct Asmnt Conducted
Yes, And An Investigative Dig Was Cunducted At The Point Of The Accident
Direct Asmnt At Pnt Accdnt Yr
2018
Non Destructive Exam Ind
No
Preparer Name
S**** S****
Preparer Title
Sr Compliance Analyst
Preparer Email
S**********@e*******.com
Preparer Telephone
715-395-3620
Prepared Date
2018-12-19 00:00:00
Authorizer Name
R** C*******
Authorizer Telephone
715-395-3619
Authorizer Title
Supervisor Us Pipeline Compliance
Authorizer Email
R***********@e*******.com
Narrative
On november 28, 2018 at approximately 12:54 pm cst free oil and contaminated soil was discovered in an integrity dig excavation at mp 395 on line 41 upstream of holdrege station. The line was shut down and operations mobilized personnel with the spill response trailer and leak clamp. At 1:30 pm cst it was determined that repairs could exceed the $50,000 reporting threshold if it was a confirmed release. At 2:43 pm cst enbridge personnel arrived at the dig site and confirmed the potential release, but was unable to provide an estimate of oil released. The nrc was notified at 2:45 pm cst on november 28, 2018 (nrc# 1231534). At 3:42 pm cst it was initially estimated that one barrel of oil was released with the amount of free oil of one pint. After excavation of the contaminated soil that measured 36' long by 4' deep by 3' wide it was calculated that 1.5 barrels of oil was released. The 48 hour update was provided to the nrc at 4:58 pm cst on november 29, 2018 (nrc#1231647). Upon investigation, the cause of the failure was determined to be a through wall crack in the long seam. The crack was repaired by welding a full encirclement sleeve (type b) on the pipeline. No product was returned to the system and was recovered as contaminated soil. Approximately 34 tons of contaminated soil has been properly disposed of at an approved landfill.
Report Received Date 2018-12-19 00:00:00
Iyear 2018
Report Number 20180392
Supplemental Number 31353
Report Type Original Final
Operator Id 31720 PHMSA Enforcement
Name Express Holdings (Usa), Llc
Operator Street Address 915 N Eldridge Parkway, Suite 1100
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77079
Local Datetime 2018-11-28 12:54:00
Location Latitude 40.584263 Google Maps OpenStreetMap
Location Longitude -99.787239 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 1.5
Recovered Bbls 1.5
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2018-11-28 12:54:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2018-11-28 12:54:00
Restart Datetime 2018-11-29 21:34:00
On Site Datetime 2018-11-28 12:54:00
Nrc Rpt Datetime 2018-11-28 14:45:00
Nrc Rpt Num 1231534 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Line 41b
Segment Name Qg-Zj
Onshore State Abbreviation Ne
Onshore Postal Code 68976
Onshore City Name Smithfield
Onshore County Name Gosper
Designated Location Milepost/valve Station
Designated Name 395
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 42
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Seam
Pipe Diameter 20
Pipe Wall Thickness 0.312
Pipe Smys 52000
Pipe Specification Api 5l
Pipe Seam Type Flash Welded
Pipe Manufacturer A.o. Smith
Pipe Coating Type Coal Tar
Installation Year 1966
Manufactured Year 1966
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 35
Est Cost Prop Damage 70000
Est Cost Emergency 20000
Est Cost Environmental 50000
Est Cost Other 0
Prpty 140035
Accident Psig 491
Mop Psig 1116
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind Yes
Exceed Restriction Ind No
Phmsa Restriction Ind Not Mandated
Length Segment Isolated 210051
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details There was no controller involvement
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind Yes
Failure Type Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Fatigue Vibr Related Yes
Failure Subtype Pressure-Related
Additional Crack Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Emat Ind Yes
Axial Recent Year 2015
Geometry Recent Year 2015
Emat Recent Year 2018
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 1975
Hydrtst Most Rcnt Pressure 1370
Direct Asmnt Conducted Yes, And An Investigative Dig Was Cunducted At The Point Of The Accident
Direct Asmnt At Pnt Accdnt Yr 2018
Non Destructive Exam Ind No
Preparer Name S**** S****
Preparer Title Sr Compliance Analyst
Preparer Email S**********@e*******.com
Preparer Telephone 715-395-3620
Prepared Date 2018-12-19 00:00:00
Authorizer Name R** C*******
Authorizer Telephone 715-395-3619
Authorizer Title Supervisor Us Pipeline Compliance
Authorizer Email R***********@e*******.com
Narrative On november 28, 2018 at approximately 12:54 pm cst free oil and contaminated soil was discovered in an integrity dig excavation at mp 395 on line 41 upstream of holdrege station. The line was shut down and operations mobilized personnel with the spill response trailer and leak clamp. At 1:30 pm cst it was determined that repairs could exceed the $50,000 reporting threshold if it was a confirmed release. At 2:43 pm cst enbridge personnel arrived at the dig site and confirmed the potential release, but was unable to provide an estimate of oil released. The nrc was notified at 2:45 pm cst on november 28, 2018 (nrc# 1231534). At 3:42 pm cst it was initially estimated that one barrel of oil was released with the amount of free oil of one pint. After excavation of the contaminated soil that measured 36' long by 4' deep by 3' wide it was calculated that 1.5 barrels of oil was released. The 48 hour update was provided to the nrc at 4:58 pm cst on november 29, 2018 (nrc#1231647). Upon investigation, the cause of the failure was determined to be a through wall crack in the long seam. The crack was repaired by welding a full encirclement sleeve (type b) on the pipeline. No product was returned to the system and was recovered as contaminated soil. Approximately 34 tons of contaminated soil has been properly disposed of at an approved landfill.