Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2018-10-14 — TX
Operator
West Texas Gulf Pipeline Co
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$225,000
Incident datetime
2018-10-14 10:10
Report number
Location
TX
Narrative
On october 14, 2018 the colorado city to abilene segment of the west texas gulf pipeline system was in process of hydrostatic pressure testing. At approximately 10:10 the segment was on spike test pressure when a failure occurred at mp 64.2 in abilene, tx. The failure resulted in hydrostatic pressure test water mixed with a minimal amount of residual crude oil being released and impacting nearby button willow creek. Due to the residual product causing a sheen on the creek, nrc was notified at 12:07 on october 14, 2018 (report 1227441). 48 hour follow up report was made on october 16, 2018 (report 1227621). Total estimated amount of crude oil released was 8 bbls. All free product was recovered by skimming the impacted water body and via absorbent materials. The failed section of pipe was cut out and replaced and hydrostatic pressure test was performed successfully between mlv 44.6 and abilene station. Pipeline was returned to normal service on november 1, 2018. External corrosion was determined to be the cause of the failure via field examination. Failed section of pipe was also examined by a 3rd party laboratory which confirmed external corrosion as the cause resulting from the deterioration of the external coating which exposed the pipe surface to a corrosive environment containing mic.
Detailed record list
Report Received Date
2018-11-13 00:00:00
Iyear
2018
Report Number
20180347
Supplemental Number
31599
Report Type
Supplemental Final
Operator Id
22442
Name
West Texas Gulf Pipeline Co
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-10-14 10:10:00
Location Latitude
32.386733
Location Longitude
-99.763045
Commodity Released Type
Crude Oil
Unintentional Release Bbls
8
Recovered Bbls
8
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Static Shut-In Test Or Other Pressure Or Leak Test
Incident Identified Datetime
2018-10-14 10:10:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-10-10 07:10:00
Restart Datetime
2018-11-01 15:40:00
On Site Datetime
2018-10-14 11:00:00
Nrc Rpt Datetime
2018-10-14 12:07:00
Nrc Rpt Num
1227441
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Wtg - 26" Colorado City To Wortham
Segment Name
23010.1 - 26" Colorado City To Abilene
Onshore State Abbreviation
Tx
Onshore Postal Code
79606
Onshore City Name
Abilene
Onshore County Name
Taylor
Designated Location
Milepost/valve Station
Designated Name
64.2
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
26
Pipe Wall Thickness
0.312
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Other
Pipe Seam Details
Efw
Pipe Manufacturer
Ao Smith
Pipe Coating Type
Other
Pipe Coating Details
Poly Tape Wrap
Installation Year
1952
Manufactured Year
1952
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
10
Rupture Length
63
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
7
Rel Water Name
Button Willow Creek
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
576
Est Cost Prop Damage
225000
Est Cost Emergency
15000
Est Cost Environmental
375000
Est Cost Other
0
Prpty
615576
Accident Psig
1104
Mop Psig
750
Accident Pressure
Pressure Exceeded 110% Of Mop
Pressure Restriction Ind
No
Length Segment Isolated
108265
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Microbiological Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Metallurgical Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1952
Shielding Evident
Yes
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Close Interval Survey Ind
Yes
Cp Annual Survey Year
2018
Close Interval Survey Year
2014
Prior Damage
No
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Emat Ind
Yes
Other Tool Tech Ind
Yes
Axial Recent Year
2015
Geometry Recent Year
2015
Emat Recent Year
2016
Other Tool
Acoustic Tool
Other Recent Year
2017
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2018
Hydrtst Most Rcnt Pressure
980
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T*** N*******
Preparer Title
Sr. Manager - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Preparer Fax
877-917-0448
Prepared Date
2019-02-01 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Sr. Manager - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On october 14, 2018 the colorado city to abilene segment of the west texas gulf pipeline system was in process of hydrostatic pressure testing. At approximately 10:10 the segment was on spike test pressure when a failure occurred at mp 64.2 in abilene, tx. The failure resulted in hydrostatic pressure test water mixed with a minimal amount of residual crude oil being released and impacting nearby button willow creek. Due to the residual product causing a sheen on the creek, nrc was notified at 12:07 on october 14, 2018 (report 1227441). 48 hour follow up report was made on october 16, 2018 (report 1227621). Total estimated amount of crude oil released was 8 bbls. All free product was recovered by skimming the impacted water body and via absorbent materials. The failed section of pipe was cut out and replaced and hydrostatic pressure test was performed successfully between mlv 44.6 and abilene station. Pipeline was returned to normal service on november 1, 2018. External corrosion was determined to be the cause of the failure via field examination. Failed section of pipe was also examined by a 3rd party laboratory which confirmed external corrosion as the cause resulting from the deterioration of the external coating which exposed the pipe surface to a corrosive environment containing mic.
| Report Received Date | 2018-11-13 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180347 |
| Supplemental Number | 31599 |
| Report Type | Supplemental Final |
| Operator Id | 22442 PHMSA Enforcement |
| Name | West Texas Gulf Pipeline Co |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2018-10-14 10:10:00 |
| Location Latitude | 32.386733 Google Maps OpenStreetMap |
| Location Longitude | -99.763045 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 8 |
| Recovered Bbls | 8 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Static Shut-In Test Or Other Pressure Or Leak Test |
| Incident Identified Datetime | 2018-10-14 10:10:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2018-10-10 07:10:00 |
| Restart Datetime | 2018-11-01 15:40:00 |
| On Site Datetime | 2018-10-14 11:00:00 |
| Nrc Rpt Datetime | 2018-10-14 12:07:00 |
| Nrc Rpt Num | 1227441 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Wtg - 26" Colorado City To Wortham |
| Segment Name | 23010.1 - 26" Colorado City To Abilene |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79606 |
| Onshore City Name | Abilene |
| Onshore County Name | Taylor |
| Designated Location | Milepost/valve Station |
| Designated Name | 64.2 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 48 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 26 |
| Pipe Wall Thickness | 0.312 |
| Pipe Smys | 52000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Other |
| Pipe Seam Details | Efw |
| Pipe Manufacturer | Ao Smith |
| Pipe Coating Type | Other |
| Pipe Coating Details | Poly Tape Wrap |
| Installation Year | 1952 |
| Manufactured Year | 1952 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Width | 10 |
| Rupture Length | 63 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | Yes |
| Surface Contam Ind | Yes |
| Amount Released | 7 |
| Rel Water Name | Button Willow Creek |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 576 |
| Est Cost Prop Damage | 225000 |
| Est Cost Emergency | 15000 |
| Est Cost Environmental | 375000 |
| Est Cost Other | 0 |
| Prpty | 615576 |
| Accident Psig | 1104 |
| Mop Psig | 750 |
| Accident Pressure | Pressure Exceeded 110% Of Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 108265 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the accident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | Localized Pitting |
| Galvanic Corrosion Ind | Yes |
| Microbiological Corrosion Ind | Yes |
| Field Exam Basis Ind | Yes |
| Metallurgical Basis Ind | Yes |
| Underground Location | Yes |
| Under Cathodic Protection Ind | Yes |
| Cathodic Pro Start Year | 1952 |
| Shielding Evident | Yes |
| Cathodic Survey Type | Yes |
| Cp Annual Survey Ind | Yes |
| Close Interval Survey Ind | Yes |
| Cp Annual Survey Year | 2018 |
| Close Interval Survey Year | 2014 |
| Prior Damage | No |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Geometry Deformation Ind | Yes |
| Emat Ind | Yes |
| Other Tool Tech Ind | Yes |
| Axial Recent Year | 2015 |
| Geometry Recent Year | 2015 |
| Emat Recent Year | 2016 |
| Other Tool | Acoustic Tool |
| Other Recent Year | 2017 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2018 |
| Hydrtst Most Rcnt Pressure | 980 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | T*** N******* |
| Preparer Title | Sr. Manager - Dot Compliance |
| Preparer Email | T************@e*************.com |
| Preparer Telephone | 713-989-7126 |
| Preparer Fax | 877-917-0448 |
| Prepared Date | 2019-02-01 00:00:00 |
| Authorizer Name | T*** N******* |
| Authorizer Telephone | 713-989-7126 |
| Authorizer Title | Sr. Manager - Dot Compliance |
| Authorizer Email | T************@e*************.com |
| Narrative | On october 14, 2018 the colorado city to abilene segment of the west texas gulf pipeline system was in process of hydrostatic pressure testing. At approximately 10:10 the segment was on spike test pressure when a failure occurred at mp 64.2 in abilene, tx. The failure resulted in hydrostatic pressure test water mixed with a minimal amount of residual crude oil being released and impacting nearby button willow creek. Due to the residual product causing a sheen on the creek, nrc was notified at 12:07 on october 14, 2018 (report 1227441). 48 hour follow up report was made on october 16, 2018 (report 1227621). Total estimated amount of crude oil released was 8 bbls. All free product was recovered by skimming the impacted water body and via absorbent materials. The failed section of pipe was cut out and replaced and hydrostatic pressure test was performed successfully between mlv 44.6 and abilene station. Pipeline was returned to normal service on november 1, 2018. External corrosion was determined to be the cause of the failure via field examination. Failed section of pipe was also examined by a 3rd party laboratory which confirmed external corrosion as the cause resulting from the deterioration of the external coating which exposed the pipe surface to a corrosive environment containing mic. |