HL incident on 2018-10-15 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$10,000
Incident datetime
2018-10-15 09:25
Report number
Location
TX
Narrative
On monday october 15th about 9:25 am a pipeline technician discovered a release at tank 1000 at spanish trails station. After discovery and observation it was estimated that leak volume would require a nrc report. Nrc was called at 10:25am cst (nrc#1227515). Caller was on hold for an extended time with call concluding at 10:49. Clean up and remediation of area began immediately. A 48 hour nrc follow-up was made to the nrc at 12:31 the following day (report # 1227605). During the incident investigation it was observed that a communication disruption was identified on saturday october 13th and had pipeline technicians and houston control center troubleshoot all weekend. The incident investigation identified that the plc logic at spanish trails was set incorrectly and the controls engineer discovered that the mechanical safety switch input was performing a local reset after a power outage. This was reprogrammed to adjust that action and prevent an erroneous reading. Other sites in the area that might have the same logic incorrectly set up after a power outage were reviewed and corrected where necessary.
Detailed record list
Report Received Date
2018-11-12 00:00:00
Iyear
2018
Report Number
20180345
Supplemental Number
40283
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-10-13 22:45:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1970
Recovered Bbls
1930
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2018-10-15 09:25:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-10-15 09:30:00
Restart Datetime
2018-10-15 23:30:00
On Site Datetime
2018-10-15 09:25:00
Confirmed Discovery Datetime
2018-10-15 09:25:00
Nrc Rpt Datetime
2018-10-15 10:49:00
Nrc Rpt Num
Additional Nrc Report Numbers
1227605
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2018-10-15 09:28:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2018-10-15 10:15:00
Osro Arrived On Site Dt
10/15/2018 10:40
Num Pub Evacuated
0
Pipe Fac Name
Rsp Spanish Trails
Segment Name
Spanish Trail Station, Delivering To C96
Onshore State Abbreviation
Tx
Onshore Postal Code
79707
Onshore City Name
Midland
Onshore County Name
Midland County
Designated Location
Milepost
Designated Name
Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Tank/vessel
Tank Vessel Subtype
Appurtenance
Tank Type
Atmospheric
Safe Fill Level
40.8
Safe Fill Level Exceeded Ind
Yes
Api Std Out Of Service Year
2015
Api Std In Service Year
2015
Installation Year
2015
Manufactured Year
2014
Material Involved
Carbon Steel
Release Type
Overfill Or Overflow
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
5000
Est Cost Prop Damage
10000
Est Cost Emergency
10000
Est Cost Environmental
40000
Est Cost Other
10000
Est Cost Other Details
Cleaning Tank External
Prpty
75000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
20
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Communications Ind
Yes
Additional Alarm Ind
Yes
Preparer Name
D**** B*****
Preparer Title
Pipeline Compliance Engineer
Preparer Email
D*******@e****.com
Preparer Telephone
713-381-5647
Prepared Date
2024-12-04 00:00:00
Authorizer Name
Y******* B**
Authorizer Telephone
713-381-5650
Authorizer Title
Pipeline Compliance Engineer
Authorizer Email
Y***@e****.com
Narrative
On monday october 15th about 9:25 am a pipeline technician discovered a release at tank 1000 at spanish trails station. After discovery and observation it was estimated that leak volume would require a nrc report. Nrc was called at 10:25am cst (nrc#1227515). Caller was on hold for an extended time with call concluding at 10:49. Clean up and remediation of area began immediately. A 48 hour nrc follow-up was made to the nrc at 12:31 the following day (report # 1227605). During the incident investigation it was observed that a communication disruption was identified on saturday october 13th and had pipeline technicians and houston control center troubleshoot all weekend. The incident investigation identified that the plc logic at spanish trails was set incorrectly and the controls engineer discovered that the mechanical safety switch input was performing a local reset after a power outage. This was reprogrammed to adjust that action and prevent an erroneous reading. Other sites in the area that might have the same logic incorrectly set up after a power outage were reviewed and corrected where necessary.
Report Received Date 2018-11-12 00:00:00
Iyear 2018
Report Number 20180345
Supplemental Number 40283
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2018-10-13 22:45:00
Location Latitude 32.00695 Google Maps OpenStreetMap
Location Longitude -102.21247 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 1970
Recovered Bbls 1930
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2018-10-15 09:25:00
System Part Involved Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2018-10-15 09:30:00
Restart Datetime 2018-10-15 23:30:00
On Site Datetime 2018-10-15 09:25:00
Confirmed Discovery Datetime 2018-10-15 09:25:00
Nrc Rpt Datetime 2018-10-15 10:49:00
Nrc Rpt Num 1227515 NRC Report How to search
Additional Nrc Report Numbers 1227605
Ignite Ind No
Notify Qualified Indiv Ind Yes
Qualified Indiv Notif Datetime 2018-10-15 09:28:00
Oil Spill Removal Org Ind Yes
Osro Activated Datetime 2018-10-15 10:15:00
Osro Arrived On Site Dt 10/15/2018 10:40
Num Pub Evacuated 0
Pipe Fac Name Rsp Spanish Trails
Segment Name Spanish Trail Station, Delivering To C96
Onshore State Abbreviation Tx
Onshore Postal Code 79707
Onshore City Name Midland
Onshore County Name Midland County
Designated Location Milepost
Designated Name Station
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Tank, Including Attached Appurtenances
Crossing No
Pipe Facility Type Intrastate
Item Involved Tank/vessel
Tank Vessel Subtype Appurtenance
Tank Type Atmospheric
Safe Fill Level 40.8
Safe Fill Level Exceeded Ind Yes
Api Std Out Of Service Year 2015
Api Std In Service Year 2015
Installation Year 2015
Manufactured Year 2014
Material Involved Carbon Steel
Release Type Overfill Or Overflow
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 5000
Est Cost Prop Damage 10000
Est Cost Emergency 10000
Est Cost Environmental 40000
Est Cost Other 10000
Est Cost Other Details Cleaning Tank External
Prpty 75000
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 20
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Malfunction Of Control/relief Equipment
Eq Failure Type Malfunction Of Control/relief Equipment
Communications Ind Yes
Additional Alarm Ind Yes
Preparer Name D**** B*****
Preparer Title Pipeline Compliance Engineer
Preparer Email D*******@e****.com
Preparer Telephone 713-381-5647
Prepared Date 2024-12-04 00:00:00
Authorizer Name Y******* B**
Authorizer Telephone 713-381-5650
Authorizer Title Pipeline Compliance Engineer
Authorizer Email Y***@e****.com
Narrative On monday october 15th about 9:25 am a pipeline technician discovered a release at tank 1000 at spanish trails station. After discovery and observation it was estimated that leak volume would require a nrc report. Nrc was called at 10:25am cst (nrc#1227515). Caller was on hold for an extended time with call concluding at 10:49. Clean up and remediation of area began immediately. A 48 hour nrc follow-up was made to the nrc at 12:31 the following day (report # 1227605). During the incident investigation it was observed that a communication disruption was identified on saturday october 13th and had pipeline technicians and houston control center troubleshoot all weekend. The incident investigation identified that the plc logic at spanish trails was set incorrectly and the controls engineer discovered that the mechanical safety switch input was performing a local reset after a power outage. This was reprogrammed to adjust that action and prevent an erroneous reading. Other sites in the area that might have the same logic incorrectly set up after a power outage were reviewed and corrected where necessary.