HL incident on 2018-10-10 — OK
Operator
Magellan Terminals Holdings, Lp
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$25,000
Incident datetime
2018-10-10 14:30
Report number
Location
OK
Narrative
While performing line fill activities to commission new construction at the facility, an inspector observed crude oil on the ground in the manifold area. Local operations personnel closed isolation valves and isolated the release area from facility operations. Emergency response procedures were implemented. The release was located within a contained dike area. Vacuum trucks were used to contain the free product and impacted soil was excavated, containerized, and properly disposed. The release originated from a crack in the girth weld located near the soil/air transition area. The defective pipe section was removed and replaced with pretested pipe. . The defective section was sent in for metallurgical analysis. The analysis indicates the failure was likely the result of above ground pipe movement during construction activities causing a ductile crack to form. The girth weld crack originated in an area of the weld where the connector pipe was not fused to the elbow girth weld. Girth welds at two other headers at this facility were examined and two sections were replaced with new pretested spool pieces. Supplement updated (01/10/2019): part c3a supplement updated (05/03/2019): part a14 (leak section was isolated; facility was not shut down), part g5, part h
Detailed record list
Report Received Date
2018-11-08 00:00:00
Iyear
2018
Report Number
20180341
Supplemental Number
32066
Report Type
Supplemental Final
Operator Id
31580
Name
Magellan Terminals Holdings, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2018-10-10 13:00:00
Location Latitude
35.95685
Location Longitude
-96.731088
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1.5
Recovered Bbls
1.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2018-10-10 14:30:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Affected Pipe Section Was Isolated From Facility Operations
On Site Datetime
2018-10-10 14:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Shinn-Pence
Segment Name
Term. No. 801
Onshore State Abbreviation
Ok
Onshore Postal Code
74023
Onshore City Name
Not Within A Municipality
Onshore County Name
Payne
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Transition Area
Incident Area Subtype
Soil/air Interface
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Pipe Diameter
12
Pipe Wall Thickness
0.312
Pipe Smys
Unknown
Pipe Specification
Unknown
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
Unknown
Pipe Coating Type
Paint
Weld Subtype
Pipe Girth Weld
Installation Year
1950
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
500
Est Cost Prop Damage
25000
Est Cost Emergency
18000
Est Cost Environmental
0
Est Cost Other
0
Prpty
43500
Accident Psig
15
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
It was determined no controller actions contributed to the event and the threshold was well below tolerances for any operations control monitoring systems.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind
Yes
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Mechanical Stress
Yes
Pwf Additional Other Ind
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2018
Hydrtst Most Rcnt Pressure
395
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
918-574-7327
Preparer Fax
918-574-7376
Prepared Date
2019-05-03 00:00:00
Authorizer Name
M*** M******
Authorizer Telephone
918574-7073
Authorizer Title
Mgr Integrity Mgmt And Regulatory Compliance
Authorizer Email
M***********@m*********.com
Narrative
While performing line fill activities to commission new construction at the facility, an inspector observed crude oil on the ground in the manifold area. Local operations personnel closed isolation valves and isolated the release area from facility operations. Emergency response procedures were implemented. The release was located within a contained dike area. Vacuum trucks were used to contain the free product and impacted soil was excavated, containerized, and properly disposed. The release originated from a crack in the girth weld located near the soil/air transition area. The defective pipe section was removed and replaced with pretested pipe. . The defective section was sent in for metallurgical analysis. The analysis indicates the failure was likely the result of above ground pipe movement during construction activities causing a ductile crack to form. The girth weld crack originated in an area of the weld where the connector pipe was not fused to the elbow girth weld. Girth welds at two other headers at this facility were examined and two sections were replaced with new pretested spool pieces. Supplement updated (01/10/2019): part c3a supplement updated (05/03/2019): part a14 (leak section was isolated; facility was not shut down), part g5, part h
| Report Received Date | 2018-11-08 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180341 |
| Supplemental Number | 32066 |
| Report Type | Supplemental Final |
| Operator Id | 31580 PHMSA Enforcement |
| Name | Magellan Terminals Holdings, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2018-10-10 13:00:00 |
| Location Latitude | 35.95685 Google Maps OpenStreetMap |
| Location Longitude | -96.731088 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 1.5 |
| Recovered Bbls | 1.5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2018-10-10 14:30:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Affected Pipe Section Was Isolated From Facility Operations |
| On Site Datetime | 2018-10-10 14:30:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Shinn-Pence |
| Segment Name | Term. No. 801 |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 74023 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Payne |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Transition Area |
| Incident Area Subtype | Soil/air Interface |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Weld, Including Heat-Affected Zone |
| Pipe Diameter | 12 |
| Pipe Wall Thickness | 0.312 |
| Pipe Smys | Unknown |
| Pipe Specification | Unknown |
| Pipe Seam Type | Other |
| Pipe Seam Details | Unknown |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Paint |
| Weld Subtype | Pipe Girth Weld |
| Installation Year | 1950 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 500 |
| Est Cost Prop Damage | 25000 |
| Est Cost Emergency | 18000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 43500 |
| Accident Psig | 15 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | It was determined no controller actions contributed to the event and the threshold was well below tolerances for any operations control monitoring systems. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Design-, Construction-, Installation-, Or Fabrication-Related |
| Metallurgical Ind | Yes |
| Failure Type | Design-, Construction-, Installation-, Or Fabrication-Related |
| Mechanical Stress | Yes |
| Pwf Additional Other Ind | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2018 |
| Hydrtst Most Rcnt Pressure | 395 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | S****** L****** |
| Preparer Title | Ai Analyst |
| Preparer Email | S**************@m*********.com |
| Preparer Telephone | 918-574-7327 |
| Preparer Fax | 918-574-7376 |
| Prepared Date | 2019-05-03 00:00:00 |
| Authorizer Name | M*** M****** |
| Authorizer Telephone | 918574-7073 |
| Authorizer Title | Mgr Integrity Mgmt And Regulatory Compliance |
| Authorizer Email | M***********@m*********.com |
| Narrative | While performing line fill activities to commission new construction at the facility, an inspector observed crude oil on the ground in the manifold area. Local operations personnel closed isolation valves and isolated the release area from facility operations. Emergency response procedures were implemented. The release was located within a contained dike area. Vacuum trucks were used to contain the free product and impacted soil was excavated, containerized, and properly disposed. The release originated from a crack in the girth weld located near the soil/air transition area. The defective pipe section was removed and replaced with pretested pipe. . The defective section was sent in for metallurgical analysis. The analysis indicates the failure was likely the result of above ground pipe movement during construction activities causing a ductile crack to form. The girth weld crack originated in an area of the weld where the connector pipe was not fused to the elbow girth weld. Girth welds at two other headers at this facility were examined and two sections were replaced with new pretested spool pieces. Supplement updated (01/10/2019): part c3a supplement updated (05/03/2019): part a14 (leak section was isolated; facility was not shut down), part g5, part h |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA