HL incident on 2018-10-01 — OK

Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$2,000
Incident datetime
2018-10-01 06:30
Report number
Location
OK
Narrative
An operator was performing a facility inspection and discovered a product release from a 1/4" fitting on the relief tubing at the discharge side of mainline unit #3. The release was isolated by closing the upstream and downstream valves on the relief system. Clean up activities commenced and impacted soils were hand excavated, containerized, and properly disposed. The 1/4" fitting was removed and sent in for analysis. The piping system is protected by another existing thermal relief system. Two new 1/2" fittings were ordered to replace the failed fitting and one additional 1/4" fitting at the facility. The rest of the thermal relief systems at the facility were inspected and no evidence of leaks was found. Update 1/17/19: results of the analysis indicate the fitting was bent and debris possibly prevented proper sealing. Replacement of the existing 1/4' fittings with new 1/2' fittings has been completed 20 cubic years of soil was removed. Supplemental (01/10/2019): update to part a 5. Correction of longitude supplemental/final (01/18/2019): update to part g6-6 sub-cause and part h with results of analysis and repairs completed.
Detailed record list
Report Received Date
2018-10-31 00:00:00
Iyear
2018
Report Number
20180333
Supplemental Number
31514
Report Type
Supplemental Final
Operator Id
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2018-10-01 06:30:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls
0.5
Recovered Bbls
0.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2018-10-01 06:30:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Not Running When The Release Was Found.
On Site Datetime
2018-10-01 06:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Strouds
Segment Name
Sta. No. 422
Onshore State Abbreviation
Wy
Onshore Postal Code
82636
Onshore City Name
Evansville
Onshore County Name
Natrona
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Reducing Port Connector Tubing Fitting
Installation Year
2017
Material Involved
Material Other Than Carbon Steel
Material Details
Stainless Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
400
Est Cost Prop Damage
2000
Est Cost Emergency
15000
Est Cost Environmental
0
Est Cost Other
0
Prpty
17400
Accident Psig
1160
Mop Psig
2160
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The amount released was not enough to be able to be detected by leakwarn in the ops control center. This fitting is not monitored by ops control, therefore, it was determined that no investigation of the controllers were necessary
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Defective Or Loose Tubing Or Fitting
Eq Failure Type
Defective Or Loose Tubing Or Fitting
Eq Additional Other Ind
Yes
Eq Additional Other Details
Bent Fitting With Debris On Sealing Surfac
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
918-574-7327
Preparer Fax
918-574-7376
Prepared Date
2019-01-18 00:00:00
Authorizer Name
M*** M******
Authorizer Telephone
918-574-7073
Authorizer Title
Mgr Integrity Mgmt And Regulatory Compliance
Authorizer Email
M***********@m*********.com
Narrative
An operator was performing a facility inspection and discovered a product release from a 1/4" fitting on the relief tubing at the discharge side of mainline unit #3. The release was isolated by closing the upstream and downstream valves on the relief system. Clean up activities commenced and impacted soils were hand excavated, containerized, and properly disposed. The 1/4" fitting was removed and sent in for analysis. The piping system is protected by another existing thermal relief system. Two new 1/2" fittings were ordered to replace the failed fitting and one additional 1/4" fitting at the facility. The rest of the thermal relief systems at the facility were inspected and no evidence of leaks was found. Update 1/17/19: results of the analysis indicate the fitting was bent and debris possibly prevented proper sealing. Replacement of the existing 1/4' fittings with new 1/2' fittings has been completed 20 cubic years of soil was removed. Supplemental (01/10/2019): update to part a 5. Correction of longitude supplemental/final (01/18/2019): update to part g6-6 sub-cause and part h with results of analysis and repairs completed.
Report Received Date 2018-10-31 00:00:00
Iyear 2018
Report Number 20180333
Supplemental Number 31514
Report Type Supplemental Final
Operator Id 22610 PHMSA Enforcement
Name Magellan Pipeline Company, Lp
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Local Datetime 2018-10-01 06:30:00
Location Latitude 42.856918 Google Maps OpenStreetMap
Location Longitude -106.2481 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls 0.5
Recovered Bbls 0.5
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2018-10-01 06:30:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Pipeline Was Not Running When The Release Was Found.
On Site Datetime 2018-10-01 06:30:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Strouds
Segment Name Sta. No. 422
Onshore State Abbreviation Wy
Onshore Postal Code 82636
Onshore City Name Evansville
Onshore County Name Natrona
Designated Location Milepost/valve Station
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Other
Item Involved Details Reducing Port Connector Tubing Fitting
Installation Year 2017
Material Involved Material Other Than Carbon Steel
Material Details Stainless Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 400
Est Cost Prop Damage 2000
Est Cost Emergency 15000
Est Cost Environmental 0
Est Cost Other 0
Prpty 17400
Accident Psig 1160
Mop Psig 2160
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The amount released was not enough to be able to be detected by leakwarn in the ops control center. This fitting is not monitored by ops control, therefore, it was determined that no investigation of the controllers were necessary
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Defective Or Loose Tubing Or Fitting
Eq Failure Type Defective Or Loose Tubing Or Fitting
Eq Additional Other Ind Yes
Eq Additional Other Details Bent Fitting With Debris On Sealing Surfac
Preparer Name S****** L******
Preparer Title Ai Analyst
Preparer Email S**************@m*********.com
Preparer Telephone 918-574-7327
Preparer Fax 918-574-7376
Prepared Date 2019-01-18 00:00:00
Authorizer Name M*** M******
Authorizer Telephone 918-574-7073
Authorizer Title Mgr Integrity Mgmt And Regulatory Compliance
Authorizer Email M***********@m*********.com
Narrative An operator was performing a facility inspection and discovered a product release from a 1/4" fitting on the relief tubing at the discharge side of mainline unit #3. The release was isolated by closing the upstream and downstream valves on the relief system. Clean up activities commenced and impacted soils were hand excavated, containerized, and properly disposed. The 1/4" fitting was removed and sent in for analysis. The piping system is protected by another existing thermal relief system. Two new 1/2" fittings were ordered to replace the failed fitting and one additional 1/4" fitting at the facility. The rest of the thermal relief systems at the facility were inspected and no evidence of leaks was found. Update 1/17/19: results of the analysis indicate the fitting was bent and debris possibly prevented proper sealing. Replacement of the existing 1/4' fittings with new 1/2' fittings has been completed 20 cubic years of soil was removed. Supplemental (01/10/2019): update to part a 5. Correction of longitude supplemental/final (01/18/2019): update to part g6-6 sub-cause and part h with results of analysis and repairs completed.