Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2018-10-01 — TX
Operator
Rose Rock Midstream L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$36,103
Incident datetime
2018-10-01 06:00
Report number
Location
TX
Narrative
On the morning of 10/1/18 at approximately 6:00am, rose rock measurement tech arrived at the hudson station and noticed there was standing crude oil north of the mainline pd pumps. The measurement tech made notifications to his supervisor who then contacted the control center to shut down the station. The control center verified that the station had been down since 23:05 on 9/30/18. The measurement tech then closed the valve at tank 413 and locked out all the inbound truck lacts. Our repair contractor arrived and excavated and exposed the 12" suction line to the mainline pd pumps where the leak originated. On 10/1/18 a temporary clamp was installed to stop the leak and on 10/2/18 approximately 54" of pipe was cut out and replaced. Upon removal of the pipe it was determined that internal corrosion was the cause of the leak. The impacted soil was excavated and transported to an onsite land farm for treatment per kdhe approval.
Detailed record list
Report Received Date
2018-10-30 00:00:00
Iyear
2018
Report Number
20180332
Supplemental Number
31329
Report Type
Supplemental Final
Operator Id
31476
Name
Rose Rock Midstream L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-10-01 06:00:00
Location Latitude
38.09369
Location Longitude
-98.581894
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2
Recovered Bbls
2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2018-10-01 06:00:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Already Shut Down At The Time Of The Accident.
On Site Datetime
2018-10-01 06:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Hudson Station
Segment Name
Tank/station Piping
Onshore State Abbreviation
Ks
Onshore Postal Code
67545
Onshore City Name
Not Within A Municipality
Onshore County Name
Stafford
Designated Location
Milepost/valve Station
Designated Name
Within Statio
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Pipe Diameter
12
Pipe Wall Thickness
0.375
Pipe Smys
42000
Pipe Specification
Api 5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Pangang Group Chendu Iron And Steel Co
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Weld Subtype
Pipe Girth Weld
Installation Year
2012
Manufactured Year
2004
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Internal Corros. Leak In Weld
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
140
Est Cost Prop Damage
36103
Est Cost Emergency
1000
Est Cost Environmental
6447
Est Cost Other
0
Prpty
43690
Accident Psig
3
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Corrosion leak
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
D**** Y****
Preparer Title
District Manager
Preparer Email
D******@s***********.com
Preparer Telephone
620-268-6004
Prepared Date
2018-12-14 00:00:00
Authorizer Name
L*** V******
Authorizer Telephone
918-524-8109
Authorizer Title
Dot Compliance Manager
Authorizer Email
L*******@s***********.com
Narrative
On the morning of 10/1/18 at approximately 6:00am, rose rock measurement tech arrived at the hudson station and noticed there was standing crude oil north of the mainline pd pumps. The measurement tech made notifications to his supervisor who then contacted the control center to shut down the station. The control center verified that the station had been down since 23:05 on 9/30/18. The measurement tech then closed the valve at tank 413 and locked out all the inbound truck lacts. Our repair contractor arrived and excavated and exposed the 12" suction line to the mainline pd pumps where the leak originated. On 10/1/18 a temporary clamp was installed to stop the leak and on 10/2/18 approximately 54" of pipe was cut out and replaced. Upon removal of the pipe it was determined that internal corrosion was the cause of the leak. The impacted soil was excavated and transported to an onsite land farm for treatment per kdhe approval.
| Report Received Date | 2018-10-30 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180332 |
| Supplemental Number | 31329 |
| Report Type | Supplemental Final |
| Operator Id | 31476 PHMSA Enforcement |
| Name | Rose Rock Midstream L.p. |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2018-10-01 06:00:00 |
| Location Latitude | 38.09369 Google Maps OpenStreetMap |
| Location Longitude | -98.581894 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 2 |
| Recovered Bbls | 2 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2018-10-01 06:00:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Pipeline Was Already Shut Down At The Time Of The Accident. |
| On Site Datetime | 2018-10-01 06:00:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Hudson Station |
| Segment Name | Tank/station Piping |
| Onshore State Abbreviation | Ks |
| Onshore Postal Code | 67545 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Stafford |
| Designated Location | Milepost/valve Station |
| Designated Name | Within Statio |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 48 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Weld, Including Heat-Affected Zone |
| Pipe Diameter | 12 |
| Pipe Wall Thickness | 0.375 |
| Pipe Smys | 42000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | Pangang Group Chendu Iron And Steel Co |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Weld Subtype | Pipe Girth Weld |
| Installation Year | 2012 |
| Manufactured Year | 2004 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Other |
| Leak Type Other | Internal Corros. Leak In Weld |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 140 |
| Est Cost Prop Damage | 36103 |
| Est Cost Emergency | 1000 |
| Est Cost Environmental | 6447 |
| Est Cost Other | 0 |
| Prpty | 43690 |
| Accident Psig | 3 |
| Mop Psig | 285 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Corrosion leak |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Microbiological Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | D**** Y**** |
| Preparer Title | District Manager |
| Preparer Email | D******@s***********.com |
| Preparer Telephone | 620-268-6004 |
| Prepared Date | 2018-12-14 00:00:00 |
| Authorizer Name | L*** V****** |
| Authorizer Telephone | 918-524-8109 |
| Authorizer Title | Dot Compliance Manager |
| Authorizer Email | L*******@s***********.com |
| Narrative | On the morning of 10/1/18 at approximately 6:00am, rose rock measurement tech arrived at the hudson station and noticed there was standing crude oil north of the mainline pd pumps. The measurement tech made notifications to his supervisor who then contacted the control center to shut down the station. The control center verified that the station had been down since 23:05 on 9/30/18. The measurement tech then closed the valve at tank 413 and locked out all the inbound truck lacts. Our repair contractor arrived and excavated and exposed the 12" suction line to the mainline pd pumps where the leak originated. On 10/1/18 a temporary clamp was installed to stop the leak and on 10/2/18 approximately 54" of pipe was cut out and replaced. Upon removal of the pipe it was determined that internal corrosion was the cause of the leak. The impacted soil was excavated and transported to an onsite land farm for treatment per kdhe approval. |