HL incident on 2018-09-28 — TX

Operator
Exxonmobil Pipeline Co
Cause
Locating Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$17,000
Incident datetime
2018-09-28 09:30
Report number
Location
TX
Narrative
On september 28, 2018, contractors for exxonmobil pipeline company were working on a project to install sheet piling at the st. James locap station. Contractors were using a super sucker vacuum truck to remove soil where sheet piling was going to be installed, but soil kept filling in the hole due to soil conditions. The work was stopped and probing took place to locate any underground lines. The team also reviewed the facility drawings. No lines were located by probing where the sheet piling was to be installed, so work began to drive the sheet piling. At approximately 09:30 a.M., the sheet piling inadvertently struck one inch drain line associated with a densitometer. The sheet piling was pulled back out, and the vacuum truck was utilized to excavate to determine what was hit. When the line was uncovered, product began to gravity flow out of the line. A drip pan was quickly put in place under the line and the vacuum truck was used to recover the oil that had drained from the line. The damaged line released approximately 23 gallons of crude oil, with approximately 6 gallons reaching the soil. The remaining volume was released to the drip pan. Upon investigation, operations discovered that the facility drawings referenced did not identify the one inch drain line. As a result, the facility drawings are being corrected to include the one inch drain line.
Detailed record list
Report Received Date
2018-10-26 00:00:00
Iyear
2018
Report Number
20180329
Supplemental Number
31273
Report Type
Supplemental Final
Operator Id
Name
Exxonmobil Pipeline Co
Operator Street Address
22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name
Spring
Operator State Abbreviation
TX
Operator Postal Code
77389
Local Datetime
2018-09-28 09:30:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.54
Recovered Bbls
0.54
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2018-09-28 09:30:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Mainline Was Not Affected; Release Occurred From Drainline
On Site Datetime
2018-09-28 09:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
St. James Locap Station
Segment Name
Locap Pipeline
Onshore State Abbreviation
La
Onshore Postal Code
70086
Onshore City Name
St. James
Onshore County Name
St. James Parish
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
1998
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
1
Puncture Circum
1
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
40
Est Cost Prop Damage
17000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
9000
Est Cost Other Details
Vacuum Truck On Standby During The Repair.
Prpty
26040
Accident Psig
0
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type
Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
180491420
One Call Center Name
Louisiana One Call Center
Locator Type
Contract Locator
Visible Marks
Yes
Root Cause Category
Locating Issue
Root Cause Type
Facility Not Marked Due To Incorrect Facility Records/maps
Preparer Name
D**** S*****
Preparer Title
Pipeline Safety Advisor
Preparer Email
D*************@e*********.com
Preparer Telephone
832-624-7531
Prepared Date
2018-12-03 00:00:00
Authorizer Name
C******* H********
Authorizer Telephone
832-624-7920
Authorizer Title
Exxonmobil Pipeline Company Sshe Manager
Authorizer Email
C*******************@e*********.com
Narrative
On september 28, 2018, contractors for exxonmobil pipeline company were working on a project to install sheet piling at the st. James locap station. Contractors were using a super sucker vacuum truck to remove soil where sheet piling was going to be installed, but soil kept filling in the hole due to soil conditions. The work was stopped and probing took place to locate any underground lines. The team also reviewed the facility drawings. No lines were located by probing where the sheet piling was to be installed, so work began to drive the sheet piling. At approximately 09:30 a.M., the sheet piling inadvertently struck one inch drain line associated with a densitometer. The sheet piling was pulled back out, and the vacuum truck was utilized to excavate to determine what was hit. When the line was uncovered, product began to gravity flow out of the line. A drip pan was quickly put in place under the line and the vacuum truck was used to recover the oil that had drained from the line. The damaged line released approximately 23 gallons of crude oil, with approximately 6 gallons reaching the soil. The remaining volume was released to the drip pan. Upon investigation, operations discovered that the facility drawings referenced did not identify the one inch drain line. As a result, the facility drawings are being corrected to include the one inch drain line.
Report Received Date 2018-10-26 00:00:00
Iyear 2018
Report Number 20180329
Supplemental Number 31273
Report Type Supplemental Final
Operator Id 4906 PHMSA Enforcement
Name Exxonmobil Pipeline Co
Operator Street Address 22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name Spring
Operator State Abbreviation TX
Operator Postal Code 77389
Local Datetime 2018-09-28 09:30:00
Location Latitude 30.006152 Google Maps OpenStreetMap
Location Longitude -90.857283 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.54
Recovered Bbls 0.54
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2018-09-28 09:30:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Mainline Was Not Affected; Release Occurred From Drainline
On Site Datetime 2018-09-28 09:30:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name St. James Locap Station
Segment Name Locap Pipeline
Onshore State Abbreviation La
Onshore Postal Code 70086
Onshore City Name St. James
Onshore County Name St. James Parish
Designated Location Milepost/valve Station
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 42
Crossing No
Pipe Facility Type Interstate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year 1998
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 1
Puncture Circum 1
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 40
Est Cost Prop Damage 17000
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 9000
Est Cost Other Details Vacuum Truck On Standby During The Repair.
Prpty 26040
Accident Psig 0
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt No
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Liquid Pipeline
One Call Notified Ind Yes
One Call Ticket Num 180491420
One Call Center Name Louisiana One Call Center
Locator Type Contract Locator
Visible Marks Yes
Root Cause Category Locating Issue
Root Cause Type Facility Not Marked Due To Incorrect Facility Records/maps
Preparer Name D**** S*****
Preparer Title Pipeline Safety Advisor
Preparer Email D*************@e*********.com
Preparer Telephone 832-624-7531
Prepared Date 2018-12-03 00:00:00
Authorizer Name C******* H********
Authorizer Telephone 832-624-7920
Authorizer Title Exxonmobil Pipeline Company Sshe Manager
Authorizer Email C*******************@e*********.com
Narrative On september 28, 2018, contractors for exxonmobil pipeline company were working on a project to install sheet piling at the st. James locap station. Contractors were using a super sucker vacuum truck to remove soil where sheet piling was going to be installed, but soil kept filling in the hole due to soil conditions. The work was stopped and probing took place to locate any underground lines. The team also reviewed the facility drawings. No lines were located by probing where the sheet piling was to be installed, so work began to drive the sheet piling. At approximately 09:30 a.M., the sheet piling inadvertently struck one inch drain line associated with a densitometer. The sheet piling was pulled back out, and the vacuum truck was utilized to excavate to determine what was hit. When the line was uncovered, product began to gravity flow out of the line. A drip pan was quickly put in place under the line and the vacuum truck was used to recover the oil that had drained from the line. The damaged line released approximately 23 gallons of crude oil, with approximately 6 gallons reaching the soil. The remaining volume was released to the drip pan. Upon investigation, operations discovered that the facility drawings referenced did not identify the one inch drain line. As a result, the facility drawings are being corrected to include the one inch drain line.