HL incident on 2018-09-18 — TX

Operator
Tesoro Logistics Northwest Pipeline Llc
Cause
Notification Issue
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$105,000
Incident datetime
2018-09-18 17:52
Report number
Location
TX
Narrative
On september 18th, 2018 approximately 17.2 barrels of diesel fuel was released from the northwest products #1 line near milepost 254. There were no injuries or fatalities. The repair of the pipeline, as well as remediation has been completed. The leak was caused by a line strike during agricultural activities being performed by the land owner. No one call was performed for the ripping activities performed. Landownership agreement changed in 2018, with different crews working the field in prior years. The field had not been worked the three years prior due to rye grass crop rotation. The new crew was not familiar with the depth and location of the pipeline across the property, though markers were in place at the property bounds. 300 feet of pipe was replaced to repair the site of the release, as well as other indications of prior pipe damage across the field. During the line replacement, the line was also lowered across this property.
Detailed record list
Report Received Date
2018-10-18 00:00:00
Iyear
2018
Report Number
20180315
Supplemental Number
31179
Report Type
Supplemental Final
Operator Id
Name
Tesoro Logistics Northwest Pipeline Llc
Operator Street Address
19100 Ridgewood Parkway
Operator City Name
San Antonio
Operator State Abbreviation
TX
Operator Postal Code
78259
Local Datetime
2018-09-18 17:52:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
17.2
Recovered Bbls
17.2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
Incident Identified Datetime
2018-09-18 17:52:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-09-18 18:02:00
Restart Datetime
2018-09-21 18:30:00
On Site Datetime
2018-09-18 20:31:00
Nrc Rpt Datetime
2018-09-18 18:22:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Northwest Product System
Segment Name
Burley To Boise
Onshore State Abbreviation
Id
Onshore Postal Code
83633
Onshore City Name
Not Within A Municipality
Onshore County Name
Elmore
Designated Location
Milepost/valve Station
Designated Name
Mp 254
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
20
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8
Pipe Wall Thickness
0.25
Pipe Smys
42000
Pipe Specification
X42
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Republic
Pipe Coating Type
Asphalt
Installation Year
1950
Manufactured Year
1949
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1500
Est Cost Prop Damage
105000
Est Cost Emergency
150000
Est Cost Environmental
45000
Est Cost Other
0
Prpty
301500
Accident Psig
512
Mop Psig
1479
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
149326
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind
Yes
Invest No Schedule Ind Details
Accident Was Caused By Third-Party Damage. The Controllers Followed Applicable Procedures Following Notification Of The Line Strike. In This, The Controllers Were Determined To Not Be A Cause Or Contribution To The Accident.
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Landowner
Excavator Type
Farmer
Excavator Equipment
Farm Equipment
Work Performed
Agriculture
One Call Notified Ind
No
Service Interruption
Yes
Service Interruption Hours
72
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2018
Circ Wave Recent Year
2018
Geometry Recent Year
2018
Insp Compl Before Damage Ind
Yes
Has Hydrtst Conduc Before Ind
Yes
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
C**** C******
Preparer Title
Compliance Specialist
Preparer Email
C**************@a*******.com
Preparer Telephone
801-606-2183
Prepared Date
2018-11-15 00:00:00
Authorizer Name
A***** R********
Authorizer Telephone
210-626-4262
Authorizer Title
Manager Dot Compliance
Authorizer Email
A***************@a*******.com
Narrative
On september 18th, 2018 approximately 17.2 barrels of diesel fuel was released from the northwest products #1 line near milepost 254. There were no injuries or fatalities. The repair of the pipeline, as well as remediation has been completed. The leak was caused by a line strike during agricultural activities being performed by the land owner. No one call was performed for the ripping activities performed. Landownership agreement changed in 2018, with different crews working the field in prior years. The field had not been worked the three years prior due to rye grass crop rotation. The new crew was not familiar with the depth and location of the pipeline across the property, though markers were in place at the property bounds. 300 feet of pipe was replaced to repair the site of the release, as well as other indications of prior pipe damage across the field. During the line replacement, the line was also lowered across this property.
Report Received Date 2018-10-18 00:00:00
Iyear 2018
Report Number 20180315
Supplemental Number 31179
Report Type Supplemental Final
Operator Id 39029 PHMSA Enforcement
Name Tesoro Logistics Northwest Pipeline Llc
Operator Street Address 19100 Ridgewood Parkway
Operator City Name San Antonio
Operator State Abbreviation TX
Operator Postal Code 78259
Local Datetime 2018-09-18 17:52:00
Location Latitude 42.8956 Google Maps OpenStreetMap
Location Longitude -115.2027 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 17.2
Recovered Bbls 17.2
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Third Party That Caused The Accident
Incident Identified Datetime 2018-09-18 17:52:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2018-09-18 18:02:00
Restart Datetime 2018-09-21 18:30:00
On Site Datetime 2018-09-18 20:31:00
Nrc Rpt Datetime 2018-09-18 18:22:00
Nrc Rpt Num 1225018 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Northwest Product System
Segment Name Burley To Boise
Onshore State Abbreviation Id
Onshore Postal Code 83633
Onshore City Name Not Within A Municipality
Onshore County Name Elmore
Designated Location Milepost/valve Station
Designated Name Mp 254
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 20
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8
Pipe Wall Thickness 0.25
Pipe Smys 42000
Pipe Specification X42
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Republic
Pipe Coating Type Asphalt
Installation Year 1950
Manufactured Year 1949
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 1500
Est Cost Prop Damage 105000
Est Cost Emergency 150000
Est Cost Environmental 45000
Est Cost Other 0
Prpty 301500
Accident Psig 512
Mop Psig 1479
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 149326
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind Yes
Invest No Schedule Ind Details Accident Was Caused By Third-Party Damage. The Controllers Followed Applicable Procedures Following Notification Of The Line Strike. In This, The Controllers Were Determined To Not Be A Cause Or Contribution To The Accident.
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
Notify Cga Dirt Yes
Private Row Ind Yes
Private Subtype Private Landowner
Excavator Type Farmer
Excavator Equipment Farm Equipment
Work Performed Agriculture
One Call Notified Ind No
Service Interruption Yes
Service Interruption Hours 72
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Cir Trn Wave Mgn Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2018
Circ Wave Recent Year 2018
Geometry Recent Year 2018
Insp Compl Before Damage Ind Yes
Has Hydrtst Conduc Before Ind Yes
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name C**** C******
Preparer Title Compliance Specialist
Preparer Email C**************@a*******.com
Preparer Telephone 801-606-2183
Prepared Date 2018-11-15 00:00:00
Authorizer Name A***** R********
Authorizer Telephone 210-626-4262
Authorizer Title Manager Dot Compliance
Authorizer Email A***************@a*******.com
Narrative On september 18th, 2018 approximately 17.2 barrels of diesel fuel was released from the northwest products #1 line near milepost 254. There were no injuries or fatalities. The repair of the pipeline, as well as remediation has been completed. The leak was caused by a line strike during agricultural activities being performed by the land owner. No one call was performed for the ripping activities performed. Landownership agreement changed in 2018, with different crews working the field in prior years. The field had not been worked the three years prior due to rye grass crop rotation. The new crew was not familiar with the depth and location of the pipeline across the property, though markers were in place at the property bounds. 300 feet of pipe was replaced to repair the site of the release, as well as other indications of prior pipe damage across the field. During the line replacement, the line was also lowered across this property.

All rights reserved. Copyright © by ClearPHMSA