Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2018-09-17 — TX
Operator
Sunoco Pipeline L.p.
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$17,000
Incident datetime
2018-09-17 13:30
Report number
Location
TX
Narrative
On 9/17/2018 during a routine station check at approximately 13:30 a 4 bbl release was discovered at tank #9302 by local operations personnel. At approximately 15:12 tx rrc pipeline safety was contacted and incident no. 1839 was assigned. The source of the release was identified as the tank mixer. All released product was contained within the tank dike and additional means of containment were put in place to further reduce environmental impact of release until the tank was isolated and pumped out to a level below the mixer to fully stop the release. All free product was recovered and impacted soil was remediated on site. The mixer unit was removed and will be reinstalled upon repair. Analysis of the failure determined that the mixer motor had become misaligned causing bearing failure which caused the mixer shaft to drop and ultimately caused the failure of the mixer seal. Repaired mixer will be reinstalled and alignment of the motor verified to ensure there is no recurrence.
Detailed record list
Report Received Date
2018-10-15 00:00:00
Iyear
2018
Report Number
20180309
Supplemental Number
31077
Report Type
Original Final
Operator Id
18718
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-09-17 13:30:00
Location Latitude
29.788335
Location Longitude
-94.400935
Commodity Released Type
Crude Oil
Unintentional Release Bbls
4
Recovered Bbls
4
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2018-09-17 13:30:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Tank Was Isolated Which Allowed Facility To Continue To Function.
On Site Datetime
2018-09-17 13:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Seabreeze Tank # 9302
Segment Name
21006 - 10" Seabreeze To Nederland
Onshore State Abbreviation
Tx
Onshore Postal Code
77695
Onshore City Name
Winnie
Onshore County Name
Chambers County
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Tank/vessel
Tank Vessel Subtype
Mixer
Tank Type
Atmospheric
Installation Year
2015
Material Involved
Material Other Than Carbon Steel
Material Details
Stainless Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
180
Est Cost Prop Damage
17000
Est Cost Emergency
15000
Est Cost Environmental
4000
Est Cost Other
0
Prpty
36180
Accident Psig
15
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Failure Details
Tank Mixer Seal Failure Caused By Bearing Failure Which Allowed The Mixer Shaft To Drop Causing Seal Failure.
Ief Addl Misalignment Ind
Yes
Preparer Name
T*** N*******
Preparer Title
Sr. Manager - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Preparer Fax
877-917-0448
Prepared Date
2018-10-15 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Sr. Manager - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 9/17/2018 during a routine station check at approximately 13:30 a 4 bbl release was discovered at tank #9302 by local operations personnel. At approximately 15:12 tx rrc pipeline safety was contacted and incident no. 1839 was assigned. The source of the release was identified as the tank mixer. All released product was contained within the tank dike and additional means of containment were put in place to further reduce environmental impact of release until the tank was isolated and pumped out to a level below the mixer to fully stop the release. All free product was recovered and impacted soil was remediated on site. The mixer unit was removed and will be reinstalled upon repair. Analysis of the failure determined that the mixer motor had become misaligned causing bearing failure which caused the mixer shaft to drop and ultimately caused the failure of the mixer seal. Repaired mixer will be reinstalled and alignment of the motor verified to ensure there is no recurrence.
| Report Received Date | 2018-10-15 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180309 |
| Supplemental Number | 31077 |
| Report Type | Original Final |
| Operator Id | 18718 PHMSA Enforcement |
| Name | Sunoco Pipeline L.p. |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2018-09-17 13:30:00 |
| Location Latitude | 29.788335 Google Maps OpenStreetMap |
| Location Longitude | -94.400935 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 4 |
| Recovered Bbls | 4 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2018-09-17 13:30:00 |
| System Part Involved | Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Tank Was Isolated Which Allowed Facility To Continue To Function. |
| On Site Datetime | 2018-09-17 13:30:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Seabreeze Tank # 9302 |
| Segment Name | 21006 - 10" Seabreeze To Nederland |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77695 |
| Onshore City Name | Winnie |
| Onshore County Name | Chambers County |
| Designated Location | Survey Station No. |
| Designated Name | 0+00 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Tank, Including Attached Appurtenances |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Tank/vessel |
| Tank Vessel Subtype | Mixer |
| Tank Type | Atmospheric |
| Installation Year | 2015 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Stainless Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 180 |
| Est Cost Prop Damage | 17000 |
| Est Cost Emergency | 15000 |
| Est Cost Environmental | 4000 |
| Est Cost Other | 0 |
| Prpty | 36180 |
| Accident Psig | 15 |
| Mop Psig | 285 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | A review of the accident determined that there were no control room actions that contributed to the event. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Other Equipment Failure |
| Eq Failure Type | Other Equipment Failure |
| Failure Details | Tank Mixer Seal Failure Caused By Bearing Failure Which Allowed The Mixer Shaft To Drop Causing Seal Failure. |
| Ief Addl Misalignment Ind | Yes |
| Preparer Name | T*** N******* |
| Preparer Title | Sr. Manager - Dot Compliance |
| Preparer Email | T************@e*************.com |
| Preparer Telephone | 713-989-7126 |
| Preparer Fax | 877-917-0448 |
| Prepared Date | 2018-10-15 00:00:00 |
| Authorizer Name | T*** N******* |
| Authorizer Telephone | 713-989-7126 |
| Authorizer Title | Sr. Manager - Dot Compliance |
| Authorizer Email | T************@e*************.com |
| Narrative | On 9/17/2018 during a routine station check at approximately 13:30 a 4 bbl release was discovered at tank #9302 by local operations personnel. At approximately 15:12 tx rrc pipeline safety was contacted and incident no. 1839 was assigned. The source of the release was identified as the tank mixer. All released product was contained within the tank dike and additional means of containment were put in place to further reduce environmental impact of release until the tank was isolated and pumped out to a level below the mixer to fully stop the release. All free product was recovered and impacted soil was remediated on site. The mixer unit was removed and will be reinstalled upon repair. Analysis of the failure determined that the mixer motor had become misaligned causing bearing failure which caused the mixer shaft to drop and ultimately caused the failure of the mixer seal. Repaired mixer will be reinstalled and alignment of the motor verified to ensure there is no recurrence. |