HL incident on 2018-09-11 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$2,000
Incident datetime
2018-09-11 10:27
Report number
Location
TX
Narrative
Contractor onsite saw oil coming from pump and shut down pump at 10:27 am. Contractor then notified enterprise personnel of leak and local personnel arrived onsite at 10:40 am. Houston pipeline control was also notified at 10:27 am by personnel and pump was shut down by pipeline control. Environmental remediation and cleanup began immediately, along with repair of nipple that cracked on instrumentation tied to pump. It was discovered that the nipple utilized was mismatched with the instrumentation utilized. To prevent reoccurrence, our reliability group determined that a different type of nipple needed to be installed that is more aligned with the design and operation of the pump.
Detailed record list
Report Received Date
2018-10-09 00:00:00
Iyear
2018
Report Number
20180298
Supplemental Number
31042
Report Type
Original Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-09-11 10:27:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.2
Recovered Bbls
0.2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2018-09-11 10:27:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-09-11 10:27:00
Restart Datetime
2018-09-11 14:00:00
On Site Datetime
2018-09-11 10:40:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cowden Mainline Pump
Segment Name
Cowden Station
Onshore State Abbreviation
Tx
Onshore Postal Code
79710
Onshore City Name
Midland
Onshore County Name
Martin
Designated Location
Milepost/valve Station
Designated Name
Cowden Stn
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Instrumentation
Installation Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
2000
Est Cost Emergency
0
Est Cost Environmental
2000
Est Cost Other
0
Prpty
4100
Accident Psig
175
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller nor control room were a contributing factor
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Threaded Fitting
Ief Addl Misalignment Ind
Yes
Preparer Name
L**** W*******
Preparer Title
Pipeline Compliance Senior Engineer
Preparer Email
L*********@e****.com
Preparer Telephone
713-381-6748
Prepared Date
2018-10-09 00:00:00
Authorizer Name
L**** W*******
Authorizer Telephone
713-381-6748
Authorizer Title
Pipeline Compliance Senior Engineer
Authorizer Email
L*********@e****.com
Narrative
Contractor onsite saw oil coming from pump and shut down pump at 10:27 am. Contractor then notified enterprise personnel of leak and local personnel arrived onsite at 10:40 am. Houston pipeline control was also notified at 10:27 am by personnel and pump was shut down by pipeline control. Environmental remediation and cleanup began immediately, along with repair of nipple that cracked on instrumentation tied to pump. It was discovered that the nipple utilized was mismatched with the instrumentation utilized. To prevent reoccurrence, our reliability group determined that a different type of nipple needed to be installed that is more aligned with the design and operation of the pump.
Report Received Date 2018-10-09 00:00:00
Iyear 2018
Report Number 20180298
Supplemental Number 31042
Report Type Original Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2018-09-11 10:27:00
Location Latitude 32.0898 Google Maps OpenStreetMap
Location Longitude -102.1379 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.2
Recovered Bbls 0.2
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2018-09-11 10:27:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2018-09-11 10:27:00
Restart Datetime 2018-09-11 14:00:00
On Site Datetime 2018-09-11 10:40:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Cowden Mainline Pump
Segment Name Cowden Station
Onshore State Abbreviation Tx
Onshore Postal Code 79710
Onshore City Name Midland
Onshore County Name Martin
Designated Location Milepost/valve Station
Designated Name Cowden Stn
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Instrumentation
Installation Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 100
Est Cost Prop Damage 2000
Est Cost Emergency 0
Est Cost Environmental 2000
Est Cost Other 0
Prpty 4100
Accident Psig 175
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Controller nor control room were a contributing factor
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Other Stripped Ind Threaded Fitting
Ief Addl Misalignment Ind Yes
Preparer Name L**** W*******
Preparer Title Pipeline Compliance Senior Engineer
Preparer Email L*********@e****.com
Preparer Telephone 713-381-6748
Prepared Date 2018-10-09 00:00:00
Authorizer Name L**** W*******
Authorizer Telephone 713-381-6748
Authorizer Title Pipeline Compliance Senior Engineer
Authorizer Email L*********@e****.com
Narrative Contractor onsite saw oil coming from pump and shut down pump at 10:27 am. Contractor then notified enterprise personnel of leak and local personnel arrived onsite at 10:40 am. Houston pipeline control was also notified at 10:27 am by personnel and pump was shut down by pipeline control. Environmental remediation and cleanup began immediately, along with repair of nipple that cracked on instrumentation tied to pump. It was discovered that the nipple utilized was mismatched with the instrumentation utilized. To prevent reoccurrence, our reliability group determined that a different type of nipple needed to be installed that is more aligned with the design and operation of the pump.