Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2018-08-15 — TX
Operator
Enterprise Crude Pipeline Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$3,000
Incident datetime
2018-08-15 17:20
Report number
Location
TX
Narrative
Lease operator reported leak on psv at 4:50 pm to enterprise personnel and line was shut down immediately. Enterprise personnel arrived on site at 5:10 pm and confirmed the 2 barrel leak on psv. Cleanup of area began immediately and a new psv was installed. Line resumed to normal operations once replacement and cleanup was completed at 8:00 pm. Accidents/incidents caused by equipment failure are trended and tracked in our operational containment program to prevent reoccurrence.
Detailed record list
Report Received Date
2018-09-13 00:00:00
Iyear
2018
Report Number
20180278
Supplemental Number
31212
Report Type
Supplemental Final
Operator Id
30829
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-08-15 16:50:00
Location Latitude
32.1045
Location Longitude
-102.1996
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2
Recovered Bbls
2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Third Party Operator (Lease Operator)
Incident Identified Datetime
2018-08-15 17:20:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-08-15 16:50:00
Restart Datetime
2018-08-15 20:00:00
On Site Datetime
2018-08-15 17:20:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Cowden 31 - Lact Unit
Segment Name
Rsp Permian Cowden 31 Outlet
Onshore State Abbreviation
Tx
Onshore Postal Code
79710
Onshore City Name
Midland
Onshore County Name
Martin
Designated Location
Milepost/valve Station
Designated Name
C96n
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Relief Valve
Installation Year
2018
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
120
Est Cost Prop Damage
3000
Est Cost Emergency
1200
Est Cost Environmental
0
Est Cost Other
0
Prpty
4320
Accident Psig
150
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
90
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller nor control room were a contributing factor
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Failure Details
Psv Did Not Actually Fail, A Leak Occurred Past The Stem And Into The Upper Housing Of The Psv
Eq Additional Other Ind
Yes
Eq Additional Other Details
Mismatched Psv
Preparer Name
L**** W*******
Preparer Title
Pipeline Compliance Senior Engineer
Preparer Email
L*********@e****.com
Preparer Telephone
713-381-6748
Prepared Date
2018-11-20 00:00:00
Authorizer Name
S**** D****
Authorizer Telephone
713-381-5585
Authorizer Title
Compliance Manager
Authorizer Email
S******@e****.com
Narrative
Lease operator reported leak on psv at 4:50 pm to enterprise personnel and line was shut down immediately. Enterprise personnel arrived on site at 5:10 pm and confirmed the 2 barrel leak on psv. Cleanup of area began immediately and a new psv was installed. Line resumed to normal operations once replacement and cleanup was completed at 8:00 pm. Accidents/incidents caused by equipment failure are trended and tracked in our operational containment program to prevent reoccurrence.
| Report Received Date | 2018-09-13 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180278 |
| Supplemental Number | 31212 |
| Report Type | Supplemental Final |
| Operator Id | 30829 PHMSA Enforcement |
| Name | Enterprise Crude Pipeline Llc |
| Operator Street Address | 1100 Louisiana Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2018-08-15 16:50:00 |
| Location Latitude | 32.1045 Google Maps OpenStreetMap |
| Location Longitude | -102.1996 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 2 |
| Recovered Bbls | 2 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Other |
| Accident Details | Third Party Operator (Lease Operator) |
| Incident Identified Datetime | 2018-08-15 17:20:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2018-08-15 16:50:00 |
| Restart Datetime | 2018-08-15 20:00:00 |
| On Site Datetime | 2018-08-15 17:20:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Automatic |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Cowden 31 - Lact Unit |
| Segment Name | Rsp Permian Cowden 31 Outlet |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79710 |
| Onshore City Name | Midland |
| Onshore County Name | Martin |
| Designated Location | Milepost/valve Station |
| Designated Name | C96n |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Relief Valve |
| Installation Year | 2018 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 120 |
| Est Cost Prop Damage | 3000 |
| Est Cost Emergency | 1200 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 4320 |
| Accident Psig | 150 |
| Mop Psig | 1440 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 90 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Controller nor control room were a contributing factor |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Other Equipment Failure |
| Eq Failure Type | Other Equipment Failure |
| Failure Details | Psv Did Not Actually Fail, A Leak Occurred Past The Stem And Into The Upper Housing Of The Psv |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Mismatched Psv |
| Preparer Name | L**** W******* |
| Preparer Title | Pipeline Compliance Senior Engineer |
| Preparer Email | L*********@e****.com |
| Preparer Telephone | 713-381-6748 |
| Prepared Date | 2018-11-20 00:00:00 |
| Authorizer Name | S**** D**** |
| Authorizer Telephone | 713-381-5585 |
| Authorizer Title | Compliance Manager |
| Authorizer Email | S******@e****.com |
| Narrative | Lease operator reported leak on psv at 4:50 pm to enterprise personnel and line was shut down immediately. Enterprise personnel arrived on site at 5:10 pm and confirmed the 2 barrel leak on psv. Cleanup of area began immediately and a new psv was installed. Line resumed to normal operations once replacement and cleanup was completed at 8:00 pm. Accidents/incidents caused by equipment failure are trended and tracked in our operational containment program to prevent reoccurrence. |