HL incident on 2018-07-29 — TX
Operator
Summit Midstream Partners, Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$80
Incident datetime
2018-07-29 08:30
Report number
Location
TX
Narrative
On july 29, 2018 at 8:30 a.M., summit's control center received a high lel alarm in the pump building that contained pump skid x-1530 located at epping station . The on-duty controller immediately responded to the alarm and shut down the pump. Local operations were dispatched to the station. Upon arrival, local operations discovered a leak from the threaded connection between a pipe nipple and the relief valve. The leak was estimated to be 20 gallons and was contained to the pump building. The leak was cleaned with absorbent pads and placed in containers for disposal. The threaded connection to the relief valve was repaired and the pipeline was restarted. The incident investigation revealed that a previous drip from the threaded connection was identified by operations two days prior to the incident and an attempt to disassemble, reseal and tighten the connection was performed. The incident occurred due to improper installation from the previous repair attempt. Post-accident drug and alcohol testing was not performed due to the incident occurring outside the prescribed testing time limits for the operator personnel involved in the previous repair attempt. Operator qualification for the covered task regarding threaded pipe assembly was suspended for the operations personnel involved in the previous repair attempt. Suspension from this covered task will be in effect until additional training and performance verification are completed. Epping station is located in a hca but this incident was contained to the pump building and operator controlled property and did not affect the hca.
Detailed record list
Report Received Date
2018-08-28 00:00:00
Iyear
2018
Report Number
20180258
Supplemental Number
30864
Report Type
Original Final
Operator Id
39012
Name
Summit Midstream Partners, Llc
Operator Street Address
910 Louisiana St. Suite 4200
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-07-29 08:30:00
Location Latitude
48.27263797
Location Longitude
-103.3607872
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.5
Recovered Bbls
0.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Controller
Operator Type
Operator Employee
Incident Identified Datetime
2018-07-29 08:30:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-07-29 08:32:00
Restart Datetime
2018-07-29 11:20:00
On Site Datetime
2018-07-29 08:45:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Epping Station
Segment Name
Pump Skid X-1530
Onshore State Abbreviation
Nd
Onshore Postal Code
58843
Onshore City Name
Epping
Onshore County Name
Williams
Designated Location
Milepost/valve Station
Designated Name
Pump Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Inside A Building
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Relief Valve
Installation Year
2018
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
35
Est Cost Prop Damage
80
Est Cost Emergency
200
Est Cost Environmental
360
Est Cost Other
0
Prpty
675
Accident Psig
200
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Pipe Nipple
Additional Installation Ind
Yes
Preparer Name
K*** H***
Preparer Title
Pipeline Compliance Specialist
Preparer Email
K********@s**************.com
Preparer Telephone
(832) 702-4759
Prepared Date
2018-08-27 00:00:00
Authorizer Name
A***** G*****
Authorizer Telephone
(832) 608-6145
Authorizer Title
Pipeline Compliance Manager
Authorizer Email
A******@s**************.com
Narrative
On july 29, 2018 at 8:30 a.M., summit's control center received a high lel alarm in the pump building that contained pump skid x-1530 located at epping station . The on-duty controller immediately responded to the alarm and shut down the pump. Local operations were dispatched to the station. Upon arrival, local operations discovered a leak from the threaded connection between a pipe nipple and the relief valve. The leak was estimated to be 20 gallons and was contained to the pump building. The leak was cleaned with absorbent pads and placed in containers for disposal. The threaded connection to the relief valve was repaired and the pipeline was restarted. The incident investigation revealed that a previous drip from the threaded connection was identified by operations two days prior to the incident and an attempt to disassemble, reseal and tighten the connection was performed. The incident occurred due to improper installation from the previous repair attempt. Post-accident drug and alcohol testing was not performed due to the incident occurring outside the prescribed testing time limits for the operator personnel involved in the previous repair attempt. Operator qualification for the covered task regarding threaded pipe assembly was suspended for the operations personnel involved in the previous repair attempt. Suspension from this covered task will be in effect until additional training and performance verification are completed. Epping station is located in a hca but this incident was contained to the pump building and operator controlled property and did not affect the hca.
| Report Received Date | 2018-08-28 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180258 |
| Supplemental Number | 30864 |
| Report Type | Original Final |
| Operator Id | 39012 PHMSA Enforcement |
| Name | Summit Midstream Partners, Llc |
| Operator Street Address | 910 Louisiana St. Suite 4200 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2018-07-29 08:30:00 |
| Location Latitude | 48.27263797 Google Maps OpenStreetMap |
| Location Longitude | -103.3607872 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.5 |
| Recovered Bbls | 0.5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Controller |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2018-07-29 08:30:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2018-07-29 08:32:00 |
| Restart Datetime | 2018-07-29 11:20:00 |
| On Site Datetime | 2018-07-29 08:45:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Epping Station |
| Segment Name | Pump Skid X-1530 |
| Onshore State Abbreviation | Nd |
| Onshore Postal Code | 58843 |
| Onshore City Name | Epping |
| Onshore County Name | Williams |
| Designated Location | Milepost/valve Station |
| Designated Name | Pump Station |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Inside A Building |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Relief Valve |
| Installation Year | 2018 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 35 |
| Est Cost Prop Damage | 80 |
| Est Cost Emergency | 200 |
| Est Cost Environmental | 360 |
| Est Cost Other | 0 |
| Prpty | 675 |
| Accident Psig | 200 |
| Mop Psig | 1440 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Threaded Connection/coupling Failure |
| Eq Failure Type | Threaded Connection/coupling Failure |
| Other Stripped Ind | Pipe Nipple |
| Additional Installation Ind | Yes |
| Preparer Name | K*** H*** |
| Preparer Title | Pipeline Compliance Specialist |
| Preparer Email | K********@s**************.com |
| Preparer Telephone | (832) 702-4759 |
| Prepared Date | 2018-08-27 00:00:00 |
| Authorizer Name | A***** G***** |
| Authorizer Telephone | (832) 608-6145 |
| Authorizer Title | Pipeline Compliance Manager |
| Authorizer Email | A******@s**************.com |
| Narrative | On july 29, 2018 at 8:30 a.M., summit's control center received a high lel alarm in the pump building that contained pump skid x-1530 located at epping station . The on-duty controller immediately responded to the alarm and shut down the pump. Local operations were dispatched to the station. Upon arrival, local operations discovered a leak from the threaded connection between a pipe nipple and the relief valve. The leak was estimated to be 20 gallons and was contained to the pump building. The leak was cleaned with absorbent pads and placed in containers for disposal. The threaded connection to the relief valve was repaired and the pipeline was restarted. The incident investigation revealed that a previous drip from the threaded connection was identified by operations two days prior to the incident and an attempt to disassemble, reseal and tighten the connection was performed. The incident occurred due to improper installation from the previous repair attempt. Post-accident drug and alcohol testing was not performed due to the incident occurring outside the prescribed testing time limits for the operator personnel involved in the previous repair attempt. Operator qualification for the covered task regarding threaded pipe assembly was suspended for the operations personnel involved in the previous repair attempt. Suspension from this covered task will be in effect until additional training and performance verification are completed. Epping station is located in a hca but this incident was contained to the pump building and operator controlled property and did not affect the hca. |