HL incident on 2018-07-23 — PA

Operator
Buckeye Partners, Lp
Cause
Locating Issue
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$85,560
Incident datetime
2018-07-23 11:14
Report number
Location
PA
Narrative
At 11:14 am (est) on july 23, 2018 the line 904 was hit with a backhoe resulting in the release of approximately 245 barrels of jet fuel. The release happened on the proximity of the miami-dade international airport. There were no fires, no injuries, and no emergency evacuations. The nrc was notified at 11:54 case #1219243. All internal and external notifications were made. The root cause was determined to be the failure to follow procedures for locating and marking a pipeline led to the erroneous marking of line 904. Employee failed to use the conductive method and failed to perform probe verification of the pipeline. The employee involved was disqualified from the associated oq tasks. A lessons learned document will be distributed company-wide to all employees that locate and mark pipelines.
Detailed record list
Report Received Date
2018-08-22 00:00:00
Iyear
2018
Report Number
20180248
Supplemental Number
31041
Report Type
Supplemental Final
Operator Id
Name
Buckeye Partners, Lp
Operator Street Address
The Buckeye Building 6161 Hamilton Boulevar
Operator City Name
Allentown
Operator State Abbreviation
PA
Operator Postal Code
18106
Local Datetime
2018-07-23 11:14:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
245
Recovered Bbls
245
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Controller
Operator Type
Operator Employee
Incident Identified Datetime
2018-07-23 11:14:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-07-23 11:17:00
Restart Datetime
2018-07-26 11:30:00
On Site Datetime
2018-07-23 11:30:00
Nrc Rpt Datetime
2018-07-23 11:54:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Line 904
Segment Name
Fc904hj Homestead Jct To Hialeah Jct
Onshore State Abbreviation
Fl
Onshore Postal Code
33122
Onshore City Name
Miami
Onshore County Name
Miami-Dade
Designated Location
Survey Station No.
Designated Name
Stk # 1573+40
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10
Pipe Wall Thickness
0.25
Pipe Smys
46000
Pipe Specification
X46
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1958
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
11
Puncture Circum
9
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Surface Water Remed Ind
Yes
Groundwater Remed Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Groundwater Contam Ind
Yes
Amount Released
20
Rel Water Name
Unknown
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
21835
Est Cost Prop Damage
85560
Est Cost Emergency
806656
Est Cost Environmental
2143754
Est Cost Other
0
Prpty
3057805
Accident Psig
296
Mop Psig
1435
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
16827
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
Yes
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Building Construction
One Call Notified Ind
Yes
One Call Ticket Num
201807179
One Call Center Name
Sunshine 811
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
72
Root Cause Category
Locating Issue
Root Cause Type
Facility Marked Inaccurately Due To Locator Error
Preparer Name
M*** C*******
Preparer Title
Sr. Compliance Specialist
Preparer Email
M********@b******.com
Preparer Telephone
936-641-5261
Prepared Date
2018-10-09 00:00:00
Authorizer Name
C****** P********
Authorizer Telephone
610-904-4113
Authorizer Title
Director Regulatory Compliance
Authorizer Email
C*********@b******.com
Narrative
At 11:14 am (est) on july 23, 2018 the line 904 was hit with a backhoe resulting in the release of approximately 245 barrels of jet fuel. The release happened on the proximity of the miami-dade international airport. There were no fires, no injuries, and no emergency evacuations. The nrc was notified at 11:54 case #1219243. All internal and external notifications were made. The root cause was determined to be the failure to follow procedures for locating and marking a pipeline led to the erroneous marking of line 904. Employee failed to use the conductive method and failed to perform probe verification of the pipeline. The employee involved was disqualified from the associated oq tasks. A lessons learned document will be distributed company-wide to all employees that locate and mark pipelines.
Report Received Date 2018-08-22 00:00:00
Iyear 2018
Report Number 20180248
Supplemental Number 31041
Report Type Supplemental Final
Operator Id 1845 PHMSA Enforcement
Name Buckeye Partners, Lp
Operator Street Address The Buckeye Building 6161 Hamilton Boulevar
Operator City Name Allentown
Operator State Abbreviation PA
Operator Postal Code 18106
Local Datetime 2018-07-23 11:14:00
Location Latitude 25.805674 Google Maps OpenStreetMap
Location Longitude -80.305545 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 245
Recovered Bbls 245
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Controller
Operator Type Operator Employee
Incident Identified Datetime 2018-07-23 11:14:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2018-07-23 11:17:00
Restart Datetime 2018-07-26 11:30:00
On Site Datetime 2018-07-23 11:30:00
Nrc Rpt Datetime 2018-07-23 11:54:00
Nrc Rpt Num 1219243 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Line 904
Segment Name Fc904hj Homestead Jct To Hialeah Jct
Onshore State Abbreviation Fl
Onshore Postal Code 33122
Onshore City Name Miami
Onshore County Name Miami-Dade
Designated Location Survey Station No.
Designated Name Stk # 1573+40
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 48
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 10
Pipe Wall Thickness 0.25
Pipe Smys 46000
Pipe Specification X46
Pipe Seam Type Seamless
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Installation Year 1958
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 11
Puncture Circum 9
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment Yes
Remediation Ind Yes
Surface Water Remed Ind Yes
Groundwater Remed Ind Yes
Soil Remed Ind Yes
Water Contam Ind Yes
Surface Contam Ind Yes
Groundwater Contam Ind Yes
Amount Released 20
Rel Water Name Unknown
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 21835
Est Cost Prop Damage 85560
Est Cost Emergency 806656
Est Cost Environmental 2143754
Est Cost Other 0
Prpty 3057805
Accident Psig 296
Mop Psig 1435
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 16827
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Notify Cga Dirt Yes
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Building Construction
One Call Notified Ind Yes
One Call Ticket Num 201807179
One Call Center Name Sunshine 811
Locator Type Contract Locator
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 72
Root Cause Category Locating Issue
Root Cause Type Facility Marked Inaccurately Due To Locator Error
Preparer Name M*** C*******
Preparer Title Sr. Compliance Specialist
Preparer Email M********@b******.com
Preparer Telephone 936-641-5261
Prepared Date 2018-10-09 00:00:00
Authorizer Name C****** P********
Authorizer Telephone 610-904-4113
Authorizer Title Director Regulatory Compliance
Authorizer Email C*********@b******.com
Narrative At 11:14 am (est) on july 23, 2018 the line 904 was hit with a backhoe resulting in the release of approximately 245 barrels of jet fuel. The release happened on the proximity of the miami-dade international airport. There were no fires, no injuries, and no emergency evacuations. The nrc was notified at 11:54 case #1219243. All internal and external notifications were made. The root cause was determined to be the failure to follow procedures for locating and marking a pipeline led to the erroneous marking of line 904. Employee failed to use the conductive method and failed to perform probe verification of the pipeline. The employee involved was disqualified from the associated oq tasks. A lessons learned document will be distributed company-wide to all employees that locate and mark pipelines.

All rights reserved. Copyright © by ClearPHMSA