Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2018-07-18 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$30,000
Incident datetime
2018-07-18 09:15
Report number
Location
OK
Narrative
On 7/18/18, a magellan operator was ground patrolling assets when an area of dead vegetation was observed on the row. At the time of the incident, the frost-hearne line was not running. Operations control was notified and isolation valves on the frost-hearne line were closed. All other magellan pipelines in the area were immediately shut down. Investigative event procedures were implemented and resources responded to the site. Impacted soil was excavated and properly disposed. Field nde indicated the release originated from a crack indication in the erw longitudinal seam. The release was repaired by installation of a type b sleeve. A review of the ultrasonic crack detection inline inspection data was conducted by the ili vendor to identify locations with similar raw data characteristics. Two locations were identified, excavated, and repaired by installation of type b sleeves. 48-hr nrc update: report # 1219024, 7/20/18 15:36 supplemental/final filed updates (09/05/2018 ): part a4, a18 c3a, and part h narrative
Detailed record list
Report Received Date
2018-08-16 00:00:00
Iyear
2018
Report Number
20180242
Supplemental Number
30902
Report Type
Supplemental Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2018-07-18 09:15:00
Location Latitude
32.054188
Location Longitude
-96.89515
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
35
Recovered Bbls
35
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Ground Patrol By Operator Or Its Contractor
Operator Type
Operator Employee
Incident Identified Datetime
2018-07-18 09:15:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-07-18 11:34:00
Restart Datetime
2018-07-19 14:08:00
On Site Datetime
2018-07-18 09:15:00
Nrc Rpt Datetime
2018-07-18 16:59:00
Nrc Rpt Num
1218780
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Hearne - Frost 10"
Segment Name
Line Id 6944
Onshore State Abbreviation
Tx
Onshore Postal Code
76666
Onshore City Name
Mertens
Onshore County Name
Hill
Designated Location
Milepost/valve Station
Designated Name
7.4
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
54
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
10
Pipe Wall Thickness
0.203
Pipe Smys
60000
Pipe Specification
Api5lx-60
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Maverick Steel
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
2005
Manufactured Year
2005
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
5000
Est Cost Gas Released
4748
Est Cost Prop Damage
30000
Est Cost Emergency
390000
Est Cost Environmental
0
Est Cost Other
0
Prpty
429748
Accident Psig
115
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
49954
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The release volume was below detectable thresholds.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor
Yes
Other Factor Details
No Known Contributing Factors
Additional Crack Ind
Yes
Collected Data Ind
Yes
Emat Ind
Yes
Other Tool Tech Ind
Yes
Emat Recent Year
2018
Other Tool
Tdw Multi-Data Set
Other Recent Year
2018
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2005
Hydrtst Most Rcnt Pressure
2080
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
918-574-7327
Preparer Fax
918-574-7376
Prepared Date
2018-09-05 00:00:00
Authorizer Name
M*** M******
Authorizer Telephone
918-574-7073
Authorizer Title
Mgr Integrity Mgmt And Regulatory Compliance
Authorizer Email
M***********@m*********.com
Narrative
On 7/18/18, a magellan operator was ground patrolling assets when an area of dead vegetation was observed on the row. At the time of the incident, the frost-hearne line was not running. Operations control was notified and isolation valves on the frost-hearne line were closed. All other magellan pipelines in the area were immediately shut down. Investigative event procedures were implemented and resources responded to the site. Impacted soil was excavated and properly disposed. Field nde indicated the release originated from a crack indication in the erw longitudinal seam. The release was repaired by installation of a type b sleeve. A review of the ultrasonic crack detection inline inspection data was conducted by the ili vendor to identify locations with similar raw data characteristics. Two locations were identified, excavated, and repaired by installation of type b sleeves. 48-hr nrc update: report # 1219024, 7/20/18 15:36 supplemental/final filed updates (09/05/2018 ): part a4, a18 c3a, and part h narrative
| Report Received Date | 2018-08-16 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180242 |
| Supplemental Number | 30902 |
| Report Type | Supplemental Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2018-07-18 09:15:00 |
| Location Latitude | 32.054188 Google Maps OpenStreetMap |
| Location Longitude | -96.89515 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 35 |
| Recovered Bbls | 35 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Ground Patrol By Operator Or Its Contractor |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2018-07-18 09:15:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2018-07-18 11:34:00 |
| Restart Datetime | 2018-07-19 14:08:00 |
| On Site Datetime | 2018-07-18 09:15:00 |
| Nrc Rpt Datetime | 2018-07-18 16:59:00 |
| Nrc Rpt Num | 1218780 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Hearne - Frost 10" |
| Segment Name | Line Id 6944 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 76666 |
| Onshore City Name | Mertens |
| Onshore County Name | Hill |
| Designated Location | Milepost/valve Station |
| Designated Name | 7.4 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 54 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Seam |
| Pipe Diameter | 10 |
| Pipe Wall Thickness | 0.203 |
| Pipe Smys | 60000 |
| Pipe Specification | Api5lx-60 |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Maverick Steel |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Installation Year | 2005 |
| Manufactured Year | 2005 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Est Cost Oper Paid | 5000 |
| Est Cost Gas Released | 4748 |
| Est Cost Prop Damage | 30000 |
| Est Cost Emergency | 390000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 429748 |
| Accident Psig | 115 |
| Mop Psig | 1440 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 49954 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The release volume was below detectable thresholds. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Field Exam Ind | Yes |
| Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Other Factor | Yes |
| Other Factor Details | No Known Contributing Factors |
| Additional Crack Ind | Yes |
| Collected Data Ind | Yes |
| Emat Ind | Yes |
| Other Tool Tech Ind | Yes |
| Emat Recent Year | 2018 |
| Other Tool | Tdw Multi-Data Set |
| Other Recent Year | 2018 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2005 |
| Hydrtst Most Rcnt Pressure | 2080 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | S****** L****** |
| Preparer Title | Ai Analyst |
| Preparer Email | S**************@m*********.com |
| Preparer Telephone | 918-574-7327 |
| Preparer Fax | 918-574-7376 |
| Prepared Date | 2018-09-05 00:00:00 |
| Authorizer Name | M*** M****** |
| Authorizer Telephone | 918-574-7073 |
| Authorizer Title | Mgr Integrity Mgmt And Regulatory Compliance |
| Authorizer Email | M***********@m*********.com |
| Narrative | On 7/18/18, a magellan operator was ground patrolling assets when an area of dead vegetation was observed on the row. At the time of the incident, the frost-hearne line was not running. Operations control was notified and isolation valves on the frost-hearne line were closed. All other magellan pipelines in the area were immediately shut down. Investigative event procedures were implemented and resources responded to the site. Impacted soil was excavated and properly disposed. Field nde indicated the release originated from a crack indication in the erw longitudinal seam. The release was repaired by installation of a type b sleeve. A review of the ultrasonic crack detection inline inspection data was conducted by the ili vendor to identify locations with similar raw data characteristics. Two locations were identified, excavated, and repaired by installation of type b sleeves. 48-hr nrc update: report # 1219024, 7/20/18 15:36 supplemental/final filed updates (09/05/2018 ): part a4, a18 c3a, and part h narrative |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA