Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2018-07-05 — TX
Operator
Enlink Midstream Operating, Lp
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,230
Incident datetime
2018-07-05 09:00
Report number
Location
TX
Narrative
On july 5, 2018 at approximately 0900, two enlink pipeline operators where at the black coyote facility performing normal duties when they discovered crude oil leaking from a back pressure control valve. Both operators quickly stopped the flow of crude oil at 0905 by closing the valve up stream and then the valve down stream of the leak. A little under 5 gallons of crude oil leaked out of the valve. During the leak investigation when the valve was removed, it was determined that the leak was caused due to a damaged seal. The valve was sent off to the manufacture to see why the seal failed. The manufacture sent a report to enlink stating that the seal failed due to debris/trash in the line or due to flange being torque to wrong specs. *did not click final when submitting 30-day report. A supplemental report is not needed.
Detailed record list
Report Received Date
2018-08-03 00:00:00
Iyear
2018
Report Number
20180225
Supplemental Number
30760
Report Type
Supplemental Final
Operator Id
39153
Name
Enlink Midstream Operating, Lp
Operator Street Address
1722 Routh Street Suite 1300
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75201
Local Datetime
2018-07-05 09:00:00
Location Latitude
35.843945
Location Longitude
-98.243177
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.11
Recovered Bbls
0.11
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2018-07-05 09:00:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-07-05 09:01:00
Restart Datetime
2018-07-05 13:00:00
On Site Datetime
2018-07-05 09:00:00
Nrc Rpt Datetime
2018-07-05 09:52:00
Nrc Rpt Num
1217376
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Black Coyote Facility
Segment Name
Discharge Pipe To Breakout Tank
Onshore State Abbreviation
Ok
Onshore Postal Code
73772-0000
Onshore City Name
Watonga
Onshore County Name
Blaine County
Designated Location
Milepost/valve Station
Designated Name
Black Coyote
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Butterfly
Valve Manufacturer
Fischer
Tank Type
Atmospheric
Installation Year
2018
Manufactured Year
2017
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
8
Est Cost Prop Damage
1230
Est Cost Emergency
0
Est Cost Environmental
4560
Est Cost Other
0
Prpty
5798
Accident Psig
45
Mop Psig
250
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The leak occurred due to equipment failure. The mop of the pipe was not exceeded.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Seal (Not Pump Seal) Or Packing
Additional Installation Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Or Debris/trash In Line
Preparer Name
J*** R****
Preparer Title
Dot Compliance Specialist
Preparer Email
J**********@e*****.com
Preparer Telephone
9406831112
Prepared Date
2018-08-06 00:00:00
Authorizer Name
J*** R****
Authorizer Telephone
9406831112
Authorizer Title
Dot Compliance Specialist
Authorizer Email
No Email Address
Narrative
On july 5, 2018 at approximately 0900, two enlink pipeline operators where at the black coyote facility performing normal duties when they discovered crude oil leaking from a back pressure control valve. Both operators quickly stopped the flow of crude oil at 0905 by closing the valve up stream and then the valve down stream of the leak. A little under 5 gallons of crude oil leaked out of the valve. During the leak investigation when the valve was removed, it was determined that the leak was caused due to a damaged seal. The valve was sent off to the manufacture to see why the seal failed. The manufacture sent a report to enlink stating that the seal failed due to debris/trash in the line or due to flange being torque to wrong specs. *did not click final when submitting 30-day report. A supplemental report is not needed.
| Report Received Date | 2018-08-03 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180225 |
| Supplemental Number | 30760 |
| Report Type | Supplemental Final |
| Operator Id | 39153 PHMSA Enforcement |
| Name | Enlink Midstream Operating, Lp |
| Operator Street Address | 1722 Routh Street Suite 1300 |
| Operator City Name | Dallas |
| Operator State Abbreviation | TX |
| Operator Postal Code | 75201 |
| Local Datetime | 2018-07-05 09:00:00 |
| Location Latitude | 35.843945 Google Maps OpenStreetMap |
| Location Longitude | -98.243177 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.11 |
| Recovered Bbls | 0.11 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2018-07-05 09:00:00 |
| System Part Involved | Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2018-07-05 09:01:00 |
| Restart Datetime | 2018-07-05 13:00:00 |
| On Site Datetime | 2018-07-05 09:00:00 |
| Nrc Rpt Datetime | 2018-07-05 09:52:00 |
| Nrc Rpt Num | 1217376 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Black Coyote Facility |
| Segment Name | Discharge Pipe To Breakout Tank |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 73772-0000 |
| Onshore City Name | Watonga |
| Onshore County Name | Blaine County |
| Designated Location | Milepost/valve Station |
| Designated Name | Black Coyote |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Valve Mainline Type | Butterfly |
| Valve Manufacturer | Fischer |
| Tank Type | Atmospheric |
| Installation Year | 2018 |
| Manufactured Year | 2017 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 8 |
| Est Cost Prop Damage | 1230 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 4560 |
| Est Cost Other | 0 |
| Prpty | 5798 |
| Accident Psig | 45 |
| Mop Psig | 250 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The leak occurred due to equipment failure. The mop of the pipe was not exceeded. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Seal (Not Pump Seal) Or Packing |
| Additional Installation Ind | Yes |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Or Debris/trash In Line |
| Preparer Name | J*** R**** |
| Preparer Title | Dot Compliance Specialist |
| Preparer Email | J**********@e*****.com |
| Preparer Telephone | 9406831112 |
| Prepared Date | 2018-08-06 00:00:00 |
| Authorizer Name | J*** R**** |
| Authorizer Telephone | 9406831112 |
| Authorizer Title | Dot Compliance Specialist |
| Authorizer Email | No Email Address |
| Narrative | On july 5, 2018 at approximately 0900, two enlink pipeline operators where at the black coyote facility performing normal duties when they discovered crude oil leaking from a back pressure control valve. Both operators quickly stopped the flow of crude oil at 0905 by closing the valve up stream and then the valve down stream of the leak. A little under 5 gallons of crude oil leaked out of the valve. During the leak investigation when the valve was removed, it was determined that the leak was caused due to a damaged seal. The valve was sent off to the manufacture to see why the seal failed. The manufacture sent a report to enlink stating that the seal failed due to debris/trash in the line or due to flange being torque to wrong specs. *did not click final when submitting 30-day report. A supplemental report is not needed. |