HL incident on 2018-06-28 — TX

Operator
Phillips 66 Pipeline Llc
Cause
Other Outside Force Damage
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$50,000
Incident datetime
2018-06-28 12:34
Report number
Location
TX
Narrative
A gasoline release was identified by field personnel after a high voltage electrical discharge occurred over the pipeline. The high voltage electrical discharge occurred when a cable company contractor made accidental contact with a high voltage power line. The high voltage electricity discharged to ground at the cable spool trailer, which was parked over the pipeline. After review of control center and additional field collected information, it was determined that the electrical discharge event occurred at app. 11:50 am on 6-28-2018. The pipeline was coincidentally being shutdown for other operational changes when field personnel called the control center to request shutdown and subsequent stand up pressure test to verify integrity. Inconclusive stand up integrity test results lead to further field investigation and ultimately field confirmation of a release at 8:40pm. 2018-9-13 updated quantity recovered. Updated 18a, local date/time operator identified failure. Updated part c, 3a with nominal diameter. 2019-4-9 finalized report with no additional changes.
Detailed record list
Report Received Date
2018-07-25 00:00:00
Iyear
2018
Report Number
20180213
Supplemental Number
31936
Report Type
Supplemental Final
Operator Id
Name
Phillips 66 Pipeline Llc
Operator Street Address
2331 Citywest Blvd
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2018-06-28 11:50:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
24
Recovered Bbls
18
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2018-06-28 12:34:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-06-28 13:50:00
Restart Datetime
2018-06-29 20:30:00
On Site Datetime
2018-06-28 20:40:00
Nrc Rpt Datetime
2018-06-28 21:17:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Automatic
Num Pub Evacuated
0
Pipe Fac Name
Wr-01
Segment Name
Ponca City To Glenpool
Onshore State Abbreviation
Ok
Onshore Postal Code
74132
Onshore City Name
Tulsa
Onshore County Name
Tulsa
Designated Location
Milepost/valve Station
Designated Name
Mp 83.5
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
47
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12
Pipe Wall Thickness
0.25
Pipe Smys
46000
Pipe Specification
Api-5lx
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Jones And Laughlin
Pipe Coating Type
Coal Tar
Weld Subtype
Other
Installation Year
1958
Manufactured Year
1958
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
2039
Est Cost Prop Damage
50000
Est Cost Emergency
32831
Est Cost Environmental
40000
Est Cost Other
0
Prpty
124870
Accident Psig
267
Mop Psig
1040
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
56965
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The leak rate was determined to be under the current leak detection threshold.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Electrical Arcing From Other Equipment Or Facility
Outside Force Type
Electrical Arcing From Other Equipment Or Facility
Preparer Name
J*** B*********
Preparer Title
Dot Coordinator
Preparer Email
J**************@p**.com
Preparer Telephone
580-767-4206
Prepared Date
2019-04-10 00:00:00
Authorizer Name
T*** F****
Authorizer Telephone
832-765-1632
Authorizer Title
Dot Director
Authorizer Email
T***********@p**.com
Narrative
A gasoline release was identified by field personnel after a high voltage electrical discharge occurred over the pipeline. The high voltage electrical discharge occurred when a cable company contractor made accidental contact with a high voltage power line. The high voltage electricity discharged to ground at the cable spool trailer, which was parked over the pipeline. After review of control center and additional field collected information, it was determined that the electrical discharge event occurred at app. 11:50 am on 6-28-2018. The pipeline was coincidentally being shutdown for other operational changes when field personnel called the control center to request shutdown and subsequent stand up pressure test to verify integrity. Inconclusive stand up integrity test results lead to further field investigation and ultimately field confirmation of a release at 8:40pm. 2018-9-13 updated quantity recovered. Updated 18a, local date/time operator identified failure. Updated part c, 3a with nominal diameter. 2019-4-9 finalized report with no additional changes.
Report Received Date 2018-07-25 00:00:00
Iyear 2018
Report Number 20180213
Supplemental Number 31936
Report Type Supplemental Final
Operator Id 31684 PHMSA Enforcement
Name Phillips 66 Pipeline Llc
Operator Street Address 2331 Citywest Blvd
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77042
Local Datetime 2018-06-28 11:50:00
Location Latitude 36.0361 Google Maps OpenStreetMap
Location Longitude -95.9939 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 24
Recovered Bbls 18
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2018-06-28 12:34:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2018-06-28 13:50:00
Restart Datetime 2018-06-29 20:30:00
On Site Datetime 2018-06-28 20:40:00
Nrc Rpt Datetime 2018-06-28 21:17:00
Nrc Rpt Num 1216761 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Automatic
Downstream Valve Type Ind Automatic
Num Pub Evacuated 0
Pipe Fac Name Wr-01
Segment Name Ponca City To Glenpool
Onshore State Abbreviation Ok
Onshore Postal Code 74132
Onshore City Name Tulsa
Onshore County Name Tulsa
Designated Location Milepost/valve Station
Designated Name Mp 83.5
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 47
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 12
Pipe Wall Thickness 0.25
Pipe Smys 46000
Pipe Specification Api-5lx
Pipe Seam Type Erw - Low Frequency
Pipe Manufacturer Jones And Laughlin
Pipe Coating Type Coal Tar
Weld Subtype Other
Installation Year 1958
Manufactured Year 1958
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 2039
Est Cost Prop Damage 50000
Est Cost Emergency 32831
Est Cost Environmental 40000
Est Cost Other 0
Prpty 124870
Accident Psig 267
Mop Psig 1040
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 56965
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The leak rate was determined to be under the current leak detection threshold.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Other Outside Force Damage
Cause Details Electrical Arcing From Other Equipment Or Facility
Outside Force Type Electrical Arcing From Other Equipment Or Facility
Preparer Name J*** B*********
Preparer Title Dot Coordinator
Preparer Email J**************@p**.com
Preparer Telephone 580-767-4206
Prepared Date 2019-04-10 00:00:00
Authorizer Name T*** F****
Authorizer Telephone 832-765-1632
Authorizer Title Dot Director
Authorizer Email T***********@p**.com
Narrative A gasoline release was identified by field personnel after a high voltage electrical discharge occurred over the pipeline. The high voltage electrical discharge occurred when a cable company contractor made accidental contact with a high voltage power line. The high voltage electricity discharged to ground at the cable spool trailer, which was parked over the pipeline. After review of control center and additional field collected information, it was determined that the electrical discharge event occurred at app. 11:50 am on 6-28-2018. The pipeline was coincidentally being shutdown for other operational changes when field personnel called the control center to request shutdown and subsequent stand up pressure test to verify integrity. Inconclusive stand up integrity test results lead to further field investigation and ultimately field confirmation of a release at 8:40pm. 2018-9-13 updated quantity recovered. Updated 18a, local date/time operator identified failure. Updated part c, 3a with nominal diameter. 2019-4-9 finalized report with no additional changes.